Manufacturing lead time improvement through lean kaizen event
Title
Manufacturing lead time improvement through lean kaizen event

Personal Author
Sim, Bee Moi, 1965-

Publication Information
2009

Physical Description
xv, 100 p. : ill. ; 30 cm.

General Note
Also available in CD-ROM : CP 023635 ra
 
Supervisor : Dr. Muhamad Zameri Mat Saman

Subject Term
Lean manufacturing
 
Total quality management
 
Production control

Added Author
Muhamad Zameri Mat Saman

Added Corporate Author
Fakulti Kejuruteraan Mekanikal

Thesis (Sarjana Kejuruteraan (Kejuruteraan Industri)) - Universiti Teknologi Malaysia, 2009


LibraryItem BarcodeCall NumberMaterial TypeItem Category 1
FKM LibraryFKM30000004372TS155 S564 2009 rafClosed Access ThesisUTM Master Thesis (Closed Access)
Perpustakaan Raja Zarith Sofiah30000010223679TS155 S564 2009 rafClosed Access ThesisUTM Master Thesis (Closed Access)