Pengurusan sisa binaan mengikut konsep 3R dalam projek pembinaan
Title
Pengurusan sisa binaan mengikut konsep 3R dalam projek pembinaan

Personal Author
Fathiyatun Aminah Ahmad, 1988-, author

Physical Description
xvii, 100 pages : illustrations ; 30 cm.

General Note
Supervisors : Dr. Yahya Mohamad Yatim, Assoc. Prof. Dr. Roslan Amirudin

Subject Term
Salvage (Waste, etc.)
 
Waste minimization

Added Author
Yahya Mohamad Yatim,
 
Roslan Amirudin,

Added Corporate Author
Fakulti Alam Bina

Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2010


LibraryItem BarcodeCall NumberMaterial TypeItem Category 1
FAB LibraryFAB30000011351TD794.5 F38 2010 rafClosed Access ThesisUTM Project Paper (Closed Access)
Perpustakaan Raja Zarith Sofiah30000010271826TD794.5 F38 2010 rafClosed Access ThesisUTM Project Paper (Closed Access)