The study on impact of project delay to construction cost
Title
The study on impact of project delay to construction cost

Personal Author
Dimas Maulana, 1984-

Publication Information
2011

Physical Description
xiii, 95 p. : ill. ; 30 cm.

General Note
Supervisor : Assoc. Prof. Dr. Razali Abdul Hamid
 
Also available in CD-ROM : CP 029784 ra

Subject Term
Construction industry -- Cost control
 
Construction industry -- Costs

Added Author
Razali Abdul Hamid, supervisor

Added Corporate Author
Fakulti Alam Bina

Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011


LibraryItem BarcodeCall NumberMaterial TypeItem Category 1
FAB LibraryFAB30000012102TA682.26 D56 2011 rafClosed Access ThesisUTM Master Thesis (Closed Access)
Perpustakaan Raja Zarith Sofiah30000010304601TA682.26 D56 2011 rafClosed Access ThesisUTM Master Thesis (Closed Access)