![Cover image for Project cum production planning and control using CPM techniques for the fabrication and installation of the water tube boiler in Vickers Hoskins (M) Snd. Bhd. Cover image for Project cum production planning and control using CPM techniques for the fabrication and installation of the water tube boiler in Vickers Hoskins (M) Snd. Bhd.](/client/assets/5.0.0/ctx//client/images/no_image.png)
Title:
Project cum production planning and control using CPM techniques for the fabrication and installation of the water tube boiler in Vickers Hoskins (M) Snd. Bhd.
Personal Author:
Physical Description:
1 reel (negative), 1 reel (positive); 35mm
Subject Term:
DSP_DISSERTATION:
Thesis (Bachelor of Mechanical Engineering) - University Teknologi Malaysia, 1988
Available:*
Library | Item Barcode | Call Number | Material Type | Item Category 1 | Status |
---|---|---|---|---|---|
Searching... | -206874 | MFL 3763 ra | Non Circulating Microfilm | Microfilm | Searching... |