Skip to:Content
|
Bottom
Cover image for Project cum production planning and control using CPM techniques for the fabrication and installation of the water tube boiler in Vickers Hoskins (M) Snd. Bhd.
Title:
Project cum production planning and control using CPM techniques for the fabrication and installation of the water tube boiler in Vickers Hoskins (M) Snd. Bhd.
Personal Author:
Physical Description:
1 reel (negative), 1 reel (positive); 35mm
DSP_DISSERTATION:
Thesis (Bachelor of Mechanical Engineering) - University Teknologi Malaysia, 1988

Available:*

Library
Item Barcode
Call Number
Material Type
Item Category 1
Status
Searching...
-206874 MFL 3763 ra Non Circulating Microfilm Microfilm
Searching...

On Order

Go to:Top of Page