![Cover image for Time and budget overrun in the construction of town houses in Dubai U.A.E Cover image for Time and budget overrun in the construction of town houses in Dubai U.A.E](/client/assets/5.0.0/ctx//client/images/no_image.png)
Title:
Time and budget overrun in the construction of town houses in Dubai U.A.E
Personal Author:
Publication Information:
2012
Physical Description:
xiii, 69 p. : ill. ; 30 cm.
General Note:
Also available in CD-ROM : CP 027950 ra
Supervisor : Bachan Singh
Added Author:
Added Corporate Author:
DSP_DISSERTATION:
Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012
Available:*
Library | Item Barcode | Call Number | Material Type | Item Category 1 | Status |
---|---|---|---|---|---|
Searching... | FKA30000007697 | TH435 A23 2012 raf | Closed Access Thesis | UTM Master Thesis (Closed Access) | Searching... |
Searching... | 30000010292221 | TH435 A23 2012 raf | Closed Access Thesis | UTM Master Thesis (Closed Access) | Searching... |