Title:
Cisco switched internetworks
Personal Author:
Publication Information:
New York : McGraw-Hill, 1999
ISBN:
9780071346467
Available:*
Library | Item Barcode | Call Number | Material Type | Item Category 1 | Status |
---|---|---|---|---|---|
Searching... | 30000003612367 | TK5105.5 L48 1999 | Open Access Book | Book | Searching... |
On Order
Summary
Summary
New from the best-selling author of McGraw-HIll's Cisco TCP/IP Professional Reference, a detailed, real-world view of how to actually use, understand, and implement the Cisco Catalyst switch family of hardware and software.
Author Notes
Christopher S. Lewis is vice president of ILX Systems, the leading provider of networked real-time financial information. Mr. Lewis frequently contributes articles to leading technology journals, including Network Computing Magazine, for which he is a contributing editor.
Table of Contents
Acknowledgments | p. ix |
Introduction | p. xi |
Chapter 1 Switching Technology Primer | p. 1 |
Objectives | p. 2 |
Network Devices | p. 2 |
Switching Concepts | p. 10 |
The Briefest of Introductions to ATM | p. 20 |
Summary | p. 33 |
Chapter 2 Switched VLANs | p. 35 |
Objectives | p. 36 |
VLAN Environments | p. 36 |
VLAN Trunking | p. 46 |
FDDI VLANs | p. 52 |
Spanning Tree Optimization | p. 57 |
Fast EtherChannel | p. 63 |
Gigabit Ethernet | p. 67 |
CGMP and Multicasts | p. 70 |
Summary | p. 77 |
Chapter 3 ATM Operation and WAN Switching | p. 79 |
Objectives | p. 80 |
Introduction to UNI Signaling | p. 80 |
ATM Routing and NNI Signaling | p. 88 |
ATM and IP Integration | p. 103 |
LANE | p. 108 |
MPOA | p. 114 |
A Word on RFC 1483 | p. 116 |
Tag Switching | p. 117 |
Summary | p. 125 |
Chapter 4 Configuring Workgroup Switches | p. 127 |
Introduction | p. 128 |
Connecting a 2900XL Series Switch into Your Network | p. 128 |
2916XL Hardware Features | p. 136 |
Upgrading the IOS | p. 137 |
Modifying the Configuration | p. 139 |
VLAN Assignment and Inter VLAN Communication | p. 153 |
Using the SPAN Port for LAN Analysis | p. 161 |
Saving and Retrieving Configurations | p. 162 |
Typical Base Configuration | p. 164 |
Password Recovery | p. 167 |
Workgroup Voice over IP | p. 169 |
Summary | p. 211 |
Chapter 5 Implementing Large-Scale Switched LANs | p. 215 |
Introduction | p. 216 |
Catalyst 5000 and 5500 Hardware | p. 216 |
Catalyst 5K Initial Configuration | p. 226 |
Ethernet Module Configuration | p. 245 |
Route Switch Module Support for VLANs | p. 270 |
Catalyst 5K Token Ring Implementation | p. 275 |
Catalyst 5K FDDI | p. 284 |
ATM Operation on Catalyst 5K Switches | p. 288 |
Summary | p. 296 |
Chapter 6 Implementing ATM Switching | p. 299 |
Introduction | p. 300 |
Overview of ATM Processors for Cisco Routers | p. 300 |
Basic ATM Processor Configuration | p. 303 |
Configuring Classic IP Over ATM on ATM Router Interfaces (RFC 1577) | p. 310 |
Overview of Configuring PPP Services on ATM Router Interfaces | p. 316 |
Introduction to the LS1010 | p. 318 |
Basic LS1010 Configuration | p. 318 |
IISP and PNNI for the LS1010 | p. 330 |
Configuring LANE on the LS1010 | p. 335 |
Overview of LANE 2.0 and MPOA for the LS1010 | p. 340 |
LS1010 Applications | p. 345 |
Summary | p. 355 |
Chapter 7 Implementing Switched Networks | p. 359 |
Introduction | p. 360 |
Network Implementation Goals | p. 361 |
Common Switched Network Design | p. 376 |
Two Alternatives in Putting the Three Layers Together | p. 386 |
Redesigning the Routed to a Switched Network | p. 388 |
Redesigning Acme's Routed Network | p. 390 |
Summary | p. 396 |
Index | p. 399 |