Skip to:Content
|
Bottom
Cover image for Cisco switched internetworks
Title:
Cisco switched internetworks
Publication Information:
New York : McGraw-Hill, 1999
ISBN:
9780071346467

Available:*

Library
Item Barcode
Call Number
Material Type
Item Category 1
Status
Searching...
30000003612367 TK5105.5 L48 1999 Open Access Book Book
Searching...

On Order

Summary

Summary

New from the best-selling author of McGraw-HIll's Cisco TCP/IP Professional Reference, a detailed, real-world view of how to actually use, understand, and implement the Cisco Catalyst switch family of hardware and software.


Author Notes

Christopher S. Lewis is vice president of ILX Systems, the leading provider of networked real-time financial information. Mr. Lewis frequently contributes articles to leading technology journals, including Network Computing Magazine, for which he is a contributing editor.


Table of Contents

Acknowledgmentsp. ix
Introductionp. xi
Chapter 1 Switching Technology Primerp. 1
Objectivesp. 2
Network Devicesp. 2
Switching Conceptsp. 10
The Briefest of Introductions to ATMp. 20
Summaryp. 33
Chapter 2 Switched VLANsp. 35
Objectivesp. 36
VLAN Environmentsp. 36
VLAN Trunkingp. 46
FDDI VLANsp. 52
Spanning Tree Optimizationp. 57
Fast EtherChannelp. 63
Gigabit Ethernetp. 67
CGMP and Multicastsp. 70
Summaryp. 77
Chapter 3 ATM Operation and WAN Switchingp. 79
Objectivesp. 80
Introduction to UNI Signalingp. 80
ATM Routing and NNI Signalingp. 88
ATM and IP Integrationp. 103
LANEp. 108
MPOAp. 114
A Word on RFC 1483p. 116
Tag Switchingp. 117
Summaryp. 125
Chapter 4 Configuring Workgroup Switchesp. 127
Introductionp. 128
Connecting a 2900XL Series Switch into Your Networkp. 128
2916XL Hardware Featuresp. 136
Upgrading the IOSp. 137
Modifying the Configurationp. 139
VLAN Assignment and Inter VLAN Communicationp. 153
Using the SPAN Port for LAN Analysisp. 161
Saving and Retrieving Configurationsp. 162
Typical Base Configurationp. 164
Password Recoveryp. 167
Workgroup Voice over IPp. 169
Summaryp. 211
Chapter 5 Implementing Large-Scale Switched LANsp. 215
Introductionp. 216
Catalyst 5000 and 5500 Hardwarep. 216
Catalyst 5K Initial Configurationp. 226
Ethernet Module Configurationp. 245
Route Switch Module Support for VLANsp. 270
Catalyst 5K Token Ring Implementationp. 275
Catalyst 5K FDDIp. 284
ATM Operation on Catalyst 5K Switchesp. 288
Summaryp. 296
Chapter 6 Implementing ATM Switchingp. 299
Introductionp. 300
Overview of ATM Processors for Cisco Routersp. 300
Basic ATM Processor Configurationp. 303
Configuring Classic IP Over ATM on ATM Router Interfaces (RFC 1577)p. 310
Overview of Configuring PPP Services on ATM Router Interfacesp. 316
Introduction to the LS1010p. 318
Basic LS1010 Configurationp. 318
IISP and PNNI for the LS1010p. 330
Configuring LANE on the LS1010p. 335
Overview of LANE 2.0 and MPOA for the LS1010p. 340
LS1010 Applicationsp. 345
Summaryp. 355
Chapter 7 Implementing Switched Networksp. 359
Introductionp. 360
Network Implementation Goalsp. 361
Common Switched Network Designp. 376
Two Alternatives in Putting the Three Layers Togetherp. 386
Redesigning the Routed to a Switched Networkp. 388
Redesigning Acme's Routed Networkp. 390
Summaryp. 396
Indexp. 399
Go to:Top of Page