Skip to:Content
|
Bottom
Cover image for Kajian kapasiti di sepanjang lebuh raya Johor Bahru - Senai
Title:
Kajian kapasiti di sepanjang lebuh raya Johor Bahru - Senai
Personal Author:
Publication Information:
Sekudai : UTM, 1993
General Note:
Peminjaman dalam bentuk mikrofilem sahaja : MFL 8288 ra
Abstract:
A highway capacity study is necessary to carry out along the Johor Bahru-Senai Highway to determine the total volume of traffic or its capacity due to the worsening problem of traffic congestion along this highway. in general, the increased number of vehicles for the past few years as a result of rapiddevelopment along the highway corridor has frequently caused traffic congestion. Information on highway capacity is tehrefore important ini referring to the existing maximum service volume of traffic to that level of service for highway design and operational purposes. Traffic composition, physical condition and geometry of highway are taken into consideration for computing thecapacity of the Johor Bahru_Senai Highway by using the equations given inHighway Capacity Manual 1985. The current highway flow rate is obtained from the analysis of traffic volume survey conducted at few survey stations that are located along the highway. Comparisons are made between the values of the current highway flow rate and the theoretical highway flow rate and the theoretical highway capacity in order to identify the problem of traffic congestion. hence, suggestions are made in order to minimise the congestion level along the highway.
DSP_DISSERTATION:
Kertas projek (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 1993

Available:*

Library
Item Barcode
Call Number
Material Type
Item Category 1
Status
Searching...
30000002623522 HE336.H48 T36 1993 raf Closed Access Thesis UTM Project Paper (Closed Access)
Searching...

On Order

Go to:Top of Page