Cover image for Tbm tunnelling in jointed and faulted rock
Title:
Tbm tunnelling in jointed and faulted rock
Personal Author:
Publication Information:
Rotterdam, NE ; A.A.Balkema, 2000
Physical Description:
ix, 173 p. : ill. ; 26 cm.
ISBN:
9789058093417

Available:*

Library
Item Barcode
Call Number
Material Type
Item Category 1
Status
Searching...
30000010184789 TA815 B37 2000 Open Access Book Book
Searching...

On Order

Summary

Summary

This practical guide describes the stage-by-stage development of a method for predicting the penetration rate (PR) and the advance rate (AR) for tunnel boring machines based on an expanded version of the Q-value, QTBM. The author analyzes 145 TBM tunnels that total 1,000km in length. He then develops simple formulae to estimate PR and AR from the QTBM value and to back-calculate QTBM from performance data. The book quantitatively explains actual advance rates as high as five m/hr for one day or as low as 0.005 m/hr for several months. It also covers logging methods, empirical TBM tunnel support design, and numerical verification of support.


Author Notes

Nick Barton has over 40 years of international experience in rock engineering, and has been involved in numerous important and iconic tunnel, cavern and rock slope projects. He has developed many tools and methods, such as the widely used Q-system, for rock classification and support selection and the Barton-Bandis constitutive laws for rock joint computer modeling. He currently teaches at the University of São Paulo and manages an international consultancy (Nick Barton & Associates, São Paulo - Oslo).

Dr. Nick Barton was the 2011 recipient of the distinguished Müller Award, an award that honours the memory of Professor Leopold Müller, the founder of the ISRM (International Society of Rock Mechanics), and awarded in recognition of distinguished contributions to the profession of rock mechanics and rock engineering.


Table of Contents

Preface
Acknowledgements
Part 1 Basic interactions between the rock mass and the TBM
Part 2 Q, Qtbm and rock mass variability
Part 3 Logging, tunnel support, probing and design verification
Appendix
References
Index