Available:*
Library | Item Barcode | Call Number | Material Type | Item Category 1 | Status |
---|---|---|---|---|---|
Searching... | 33000000016266 | TA183 S66 2015 r | Reference Book | 1:BOOKREF | Searching... |
On Order
Summary
Summary
Infrastructure work is still declining, although there are plans to release £1.3bn worth of road network schemes over the next few years.
Network rail has published plans to spend £38bn on upgrade works over the next five years.
Water firms are to bring forward $400m of work into this financial year.
Spon's Civil Engineering and Highway Works Price Book2015 from AECOM gives costs for both general and civil engineering works and highway works, and provides a full breakdown of labour, plant and material elements, with labour rates updated in line with the latest CIJC wage agreement. Beyond prices, it can be used as a comprehensive work manual for the UK's civil engineering, surveying and construction business.
Use the access code inside the front cover of the book to get set up with internet access to this edition until the end of December 2015. We now provide SPON'S Online, a versatile and powerful online data viewing package , which replaces the estimating software and ebook of recent years.
This 29th edition incorporates a comprehensive review throughout:
Updated to come into line with the CESSM4 structure as well as MMHW And with an expanded range of rail elementsTable of Contents
Preface | p. ix |
Abbreviations | p. xi |
Acknowledgements | p. xiii |
Part 1 General | |
Purpose and content of the book | p. 3 |
Outline of the tendering and estimating process | p. 7 |
Capital allowances | p. 15 |
Value added tax | p. 21 |
The aggregates levy | p. 29 |
Land remediation | p. 35 |
The landfill tax | p. 45 |
Part 2 On Costs and Profit | |
Risk/opportunity | p. 49 |
Head office overheads | p. 49 |
Profit | p. 49 |
Finance costs - assessment of contract investment | p. 49 |
Value added tax | p. 51 |
Tender summary | p. 52 |
Part 3 Cost and Tender Price Indices | |
Introduction | p. 55 |
Price adjustment formula indices | p. 55 |
A constructed cost index based on the price adjustment formula indices | p. 57 |
The road construction tender price index | p. 58 |
Part 4 Resources | |
Labour costs | p. 63 |
Plant costs | p. 69 |
Part 5 Approximate Estimating | |
Preliminaries and general items | p. 77 |
Building prices per square metre | p. 95 |
Approximate estimating rates - Ancillary building works | p. 103 |
Water and treatment facilities | p. 103 |
Earth retention and stabilization | p. 103 |
Bridgework | p. 104 |
Tunnelling | p. 105 |
Highway | p. 106 |
Underpasses | p. 108 |
Landscaping | p. 109 |
Access scaffolding | p. 110 |
Temporary works | p. 110 |
Approximate estimating rates - General building works | p. 112 |
1 Substructure | p. 112 |
1.1 Substructure | p. 112 |
2 Superstructure | p. 116 |
2.1 Frame | p. 116 |
2.2 Upper floors | p. 118 |
2.3 Roof | p. 119 |
2.4 Stairs and ramps | p. 123 |
2.5 External walls | p. 125 |
2.6 Windows and external doors | p. 130 |
2.7 Internal walls and partitions | p. 132 |
2.8 Internal doors | p. 134 |
3 Internal finishes | p. 135 |
3.1 Wall finishes | p. 135 |
3.2 Floor finishes | p. 136 |
3.3 Ceiling finishes | p. 138 |
4 Fittings, furnishings and equipment | p. 140 |
4.1 Fittings, furnishings and equipment | p. 140 |
5 Services | p. 141 |
5.1 Sanitary installations | p. 141 |
5.4 Water installations | p. 142 |
5.6 Space heating and air conditioning | p. 142 |
5.7 Ventilating systems | p. 142 |
5.8 Electrical installations | p. 143 |
5.9 Fuel installations | p. 143 |
5.10 Lift and conveyor installations | p. 144 |
5.11 Fire and lightning protection | p. 144 |
5.12 Communication and security Installations | p. 145 |
5.13 Special installations | p. 145 |
5.14 Builder's work in connection with services | p. 145 |
8 External works | p. 146 |
8.2 Roads, paths, pavings and surfaces | p. 146 |
8.3 Soft landscaping, planting and irrigation systems | p. 147 |
8.4 Fencings, railings and walls | p. 148 |
8.5 External fixtures | p. 149 |
8.6 External drainage | p. 150 |
8.7 External services | p. 153 |
8.8 Ancillary buildings and structures | p. 154 |
Part 6 Unit Costs - Civil Engineering Works | |
Introductory notes | p. 155 |
Guidance notes | p. 157 |
Class A General items | p. 159 |
Class B Ground investigation | p. 163 |
Class C Geotechnical and other specialist processes | p. 168 |
Class D Demolition and site clearance | p. 177 |
Class E Excavation | p. 179 |
Class F In situ concrete | p. 202 |
Class G Concrete ancillaries | p. 208 |
Class H Precast concrete | p. 221 |
Class I Pipework - pipes | p. 223 |
Class J Pipework - fittings and valves | p. 245 |
Class K Pipework - manholes and pipework accessories | p. 246 |
Class L Pipework - supports and protection, ancillaries to laying and excavation | p. 261 |
Class M Structural metalwork | p. 266 |
Class N Miscellaneous metalwork | p. 268 |
Class O Timber | p. 273 |
Class P Piling | p. 280 |
Class Q Piling ancillaries | p. 293 |
Class R Roads and pavings | p. 300 |
Class S Rail track | p. 318 |
Class T Tunnels | p. 326 |
Class U Brickwork, clockwork and masonry | p. 331 |
Class V Painting | p. 345 |
Class W Waterproofing | p. 352 |
Class X Miscellaneous work | p. 358 |
Class Y Sewer and water main renovation and ancillary works | p. 363 |
Part 7 Unit Costs - Highway Works | |
Introductory notes | p. 365 |
Guidance notes | p. 367 |
Series 100: Preliminaries | p. 371 |
Series 200: Site clearance | p. 373 |
Series 300: Fencing | p. 376 |
Series 400: Road restraint systems (vehicle and pedestrian) | p. 380 |
Series 500: Drainage and service ducts | p. 387 |
Series 600: Earthworks | p. 410 |
Series 700: Pavements | p. 428 |
Series 1100: Kerbs, footways & paved areas | p. 435 |
Series 1200: Traffic signs and road markings | p. 443 |
Series 1300: Road lighting columns and brackets, CCTV masts and cantilever masts | p. 449 |
Series 1400: Electrical work for road lighting and traffic signs | p. 452 |
Series 1500: Motorway communications | p. 455 |
Series 1600: Piling and embedded retaining walls | p. 457 |
Series 1700: Structural concrete | p. 474 |
Series 1800: Steelwork for structures | p. 481 |
Series 1900: Protection of steelwork against corrosion | p. 482 |
Series 2000: Waterproofing for structures | p. 484 |
Series 2100: Bridge bearings | p. 486 |
Series 2300: Bridge expansion joints and sealing of gaps | p. 488 |
Series 2400: Brickwork, blockwork and stonework | p. 489 |
Series 2500: Special structures | p. 496 |
Series 2700: Accommodation works, works for statutory undertakers | p. 497 |
Series 3000: Landscaping and ecology | p. 498 |
Series 5000: Maintenance painting of steelwork | p. 503 |
Part 8 Daywork | |
Introduction | p. 507 |
Schedules of dayworks carried out incidental to contract work | p. 507 |
Application of dayworks | p. 509 |
Part 9 Professional Fees | |
Consulting engineers' conditions of appointment | p. 517 |
Quantity surveyors' conditions of appointment | p. 521 |
Part 10 Outputs | |
Disposal of excavated materials | p. 525 |
Breaking out pavements, brickwork, concrete and masonry by hand and pneumatic breaker | p. 526 |
Loading loose materials and items by hand | p. 527 |
Placing ready mixed concrete in the works | p. 528 |
Fixing bar reinforcement | p. 529 |
Erecting formwork to beams and walls | p. 530 |
Erecting formwork to slabs | p. 530 |
Multipliers for formwork | p. 530 |
Laying and jointing flexible-jointed clayware pipes | p. 531 |
Precast concrete manholes in sections | p. 532 |
Part 11 Useful Addresses for Further Information | p. 533 |
Part 12 Tables and Memoranda | p. 551 |
Index | p. 645 |