Cover image for Design and construction of a protable continuous smoke tunnel
Title:
Design and construction of a protable continuous smoke tunnel
Personal Author:
Publication Information:
1992
General Note:
Loan in microfilm form only : MFL 7771 ra
Abstract:
All the works carried out in the design, construction and testing of the portable continuous smoke tunnel had been discussed in this report. The main one includes the selection of materials, calculation of the minimum electrical power required for the hot wire to generate smoke and visualization of the streamlines passing through several types of submerged body at different angles of attack. Photographs had been taken for the flow patterns of each models. First three chapters of this report are the literature study and the idea development sections where all the idea streams are described. Chapter four consists of all the construction details. Chapter five and six are the discussion and conclusion sections respectively
DSP_DISSERTATION:
Project Paper (Bachelor of Mechanical Engineering) - Universiti Teknologi Malaysia, 1992

Available:*

Library
Item Barcode
Call Number
Material Type
Item Category 1
Status
Searching...
30000001754070 TL567.W5 L35 1992 raf Closed Access Thesis UTM Project Paper (Closed Access)
Searching...

On Order