Search Results for - Narrowed by: Fakulti Alam Bina - Construction contracts SirsiDynix Enterprise http://portal.utm.my/client/en_AU/main/main/qf$003dAUTHOR$002509Author$002509Fakulti$002bAlam$002bBina$002509Fakulti$002bAlam$002bBina$0026qf$003dSUBJECT$002509Subject$002509Construction$002bcontracts$002509Construction$002bcontracts$0026ps$003d300?dt=list 2024-04-24T08:07:24Z Framework to reduce variation processing time in public projects ent://SD_ILS/0/SD_ILS:870250 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Munirah Abdul Kadir, 1982-, author<br/>Author&#160;Munirah Abdul Kadir, 1982-, author,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;NA1996 M86 2018 raf<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2018<br/> Framework to reduce variation processing time in public projects ent://SD_ILS/0/SD_ILS:870260 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Munirah Abdul Kadir, 1982-, author<br/>Author&#160;Munirah Abdul Kadir, 1982-, author,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Electronic Resources<br/>Call Number&#160;CP 065392 ra<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2018<br/> Contract in writing requirement for statutory adjudication claim under CIPAA 2012 ent://SD_ILS/0/SD_ILS:870263 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohd. Faisal A. Muthalib, author<br/>Author&#160;Mohd. Faisal A. Muthalib, author,&#160;Hamizah Liyana Tajul Ariffin, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 M643 2018 raf<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - - Universiti Teknologi Malaysia, 2018<br/> Contract in writing requirement for statutory adjudication claim under CIPAA 2012 ent://SD_ILS/0/SD_ILS:870265 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohd. Faisal A. Muthalib, author<br/>Author&#160;Mohd. Faisal A. Muthalib, author,&#160;Hamizah Liyana Tajul Ariffin, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 065395 ra<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - - Universiti Teknologi Malaysia, 2018<br/> Time at large in construction ent://SD_ILS/0/SD_ILS:870268 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Zuraina Jar, 1982-, author<br/>Author&#160;Zuraina Jar, 1982-, author,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 Z87 2018 raf<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - - Universiti Teknologi Malaysia, 2018<br/> Time at large in construction ent://SD_ILS/0/SD_ILS:870273 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Zuraina Jar, 1982-, author<br/>Author&#160;Zuraina Jar, 1982-, author,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 065397 ra<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - - Universiti Teknologi Malaysia, 2018<br/> Application of electronic communication in Malaysian Standard Form of contract ent://SD_ILS/0/SD_ILS:870296 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Suhaila Endut, 1986-, author<br/>Author&#160;Suhaila Endut, 1986-, author,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 S84 2018 raf<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2018<br/> Application of electronic communication in Malaysian Standard Form of contract ent://SD_ILS/0/SD_ILS:870297 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Suhaila Endut, 1986-, author<br/>Author&#160;Suhaila Endut, 1986-, author,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Electronic Resources<br/>Call Number&#160;CP 065405 ra<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2018<br/> Rules of exclusion clause : the site investigation clause ent://SD_ILS/0/SD_ILS:862206 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Shazwana Buang, 1979- author<br/>Author&#160;Shazwana Buang, 1979- author,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 S53 2017 raf<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2016<br/> Rules of exclusion clause : the site investigation clause ent://SD_ILS/0/SD_ILS:862210 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Shazwana Buang, 1979- author<br/>Author&#160;Shazwana Buang, 1979- author,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 061831 ra<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2016<br/> Judicial interpretation of consequential loss in construction contract ent://SD_ILS/0/SD_ILS:868264 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Rabiatul Hidayah Mokhtar, 1993-, author<br/>Author&#160;Rabiatul Hidayah Mokhtar, 1993-, author,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 R33 2017 raf<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Judicial interpretation of consequential loss in construction contract ent://SD_ILS/0/SD_ILS:868265 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Rabiatul Hidayah Mokhtar, 1993-, author<br/>Author&#160;Rabiatul Hidayah Mokhtar, 1993-, author,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Electronic Resources<br/>Call Number&#160;CP 064465 ra<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Rights of contractors on recovery of payment after termination of contract under CIPAA 2012 ent://SD_ILS/0/SD_ILS:868266 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohamad Zahierruden Ismail, 1992-, author<br/>Author&#160;Mohamad Zahierruden Ismail, 1992-, author,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 M64 2017 raf<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Contemporaneous records in construction claim ent://SD_ILS/0/SD_ILS:868268 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Kerk, Chia Cun, 1992-, author<br/>Author&#160;Kerk, Chia Cun, 1992-, author,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 K47 2017 raf<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Contemporaneous records in construction claim ent://SD_ILS/0/SD_ILS:868269 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Kerk, Chia Cun, 1992-, author<br/>Author&#160;Kerk, Chia Cun, 1992-, author,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 064467 ra<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Rights of contractors on recovery of payment after termination of contract under CIPAA 2012 ent://SD_ILS/0/SD_ILS:868267 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohamad Zahierruden Ismail, 1992-, author<br/>Author&#160;Mohamad Zahierruden Ismail, 1992-, author,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Electronic Resources<br/>Call Number&#160;CP 064466 ra<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Cost of stay proceedings in arbitration ent://SD_ILS/0/SD_ILS:868663 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Hanafi Ab. Haris, 1991-, author<br/>Author&#160;Hanafi Ab. Haris, 1991-, author,&#160;Hamizah Liyana Tajul Ariffin, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K2400 H363 2017 raf<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Delay in giving possession of the site in realation to direct loss and / or expense claims ent://SD_ILS/0/SD_ILS:852904 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Alfriady Zuliansyah, 1989- author<br/>Author&#160;Alfriady Zuliansyah, 1989- author,&#160;Hamizah Liyana Tajul Ariffin, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KD1641 Z85 2015 raf<br/>Publication Date&#160;2016&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Framework of decision making process for variation works to analyse impacts caused by factors influencing decisions ent://SD_ILS/0/SD_ILS:853508 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Norazam Othman, 1963- author<br/>Author&#160;Norazam Othman, 1963- author,&#160;Abd. Ghani Khalid,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;XX(853508.1)<br/>Publication Date&#160;2016<br/>Thesis (Ph.D (Ukur Bahan)) - Universiti Teknologi Malaysia, 2016<br/> Limitation period in latent defects ent://SD_ILS/0/SD_ILS:858189 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mazuan Lin, 1981-, author<br/>Author&#160;Mazuan Lin, 1981-, author,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;XX(858189.1)<br/>Publication Date&#160;2016<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2016<br/> Claims for additional preliminaries costs due to project prolongation ent://SD_ILS/0/SD_ILS:844329 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Aminuddin Saidin, 1986-<br/>Author&#160;Aminuddin Saidin, 1986-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KD1641 A65 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Application of good faith as necessary limits in exercising the termination for convenience clause ent://SD_ILS/0/SD_ILS:844455 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nik Abdul Hafiz Nik Abdullah, 1977- author<br/>Author&#160;Nik Abdul Hafiz Nik Abdullah, 1977- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 N55 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Contractor's implied duty to warn design defects ent://SD_ILS/0/SD_ILS:847352 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Gan, Gilbert Siang Yang, 1989-<br/>Author&#160;Gan, Gilbert Siang Yang, 1989-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 G36 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2015<br/> Mutual termination agreement ent://SD_ILS/0/SD_ILS:844451 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Roqiyah Nur Mohd. Sharifuddin, 1977- author<br/>Author&#160;Roqiyah Nur Mohd. Sharifuddin, 1977- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 R67 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Common approach used by the industry in assessing the contractor entitlement for extention of time in the event of concurrent delay ent://SD_ILS/0/SD_ILS:844454 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohammad Irfan Ahmad Zaki, 1981-<br/>Author&#160;Mohammad Irfan Ahmad Zaki, 1981-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M648 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Claims for additional preliminaries costs due to project prolongation ent://SD_ILS/0/SD_ILS:847358 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Aminuddin Saidin, 1986-<br/>Author&#160;Aminuddin Saidin, 1986-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053103 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> The prevailing practice in deciding the practical completion of construction work ent://SD_ILS/0/SD_ILS:847361 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohammad Harith Mohd. Yunos, 1982- author<br/>Author&#160;Mohammad Harith Mohd. Yunos, 1982- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M649 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> The prevailing practice in deciding the practical completion of construction work ent://SD_ILS/0/SD_ILS:847362 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohammad Harith Mohd. Yunod, 1982- author<br/>Author&#160;Mohammad Harith Mohd. Yunod, 1982- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053141 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Mutual termination agreement ent://SD_ILS/0/SD_ILS:847378 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Roqiyah Nur Mohd. Sharifuddin, 1977- author<br/>Author&#160;Roqiyah Nur Mohd. Sharifuddin, 1977- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053137 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Common approach used by the industry in assessing the contractor entitlement for extention of time in the event of concurrent delay ent://SD_ILS/0/SD_ILS:847379 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohammad Irfan Ahmad Zaki, 1981-<br/>Author&#160;Mohammad Irfan Ahmad Zaki, 1981-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053110 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Recovery of head office overheads due to prolongation of time ent://SD_ILS/0/SD_ILS:847380 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Ramli Ismail, 1975-, author<br/>Author&#160;Ramli Ismail, 1975-, author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438.4 R36 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Assessing loss and expenses claim by prolongation cost ent://SD_ILS/0/SD_ILS:847384 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Raiha Azene Ramli, 1980- author<br/>Author&#160;Raiha Azene Ramli, 1980- author,&#160;Maizon Hashim,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KD1641 R35 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Assessing loss and expenses claim by prolongation cost ent://SD_ILS/0/SD_ILS:847387 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Raiha Azene Ramli, 1980- author<br/>Author&#160;Raiha Azene Ramli, 1980- author,&#160;Maizon Hashim,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053135 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Application of good faith as necessary limits in exercising the termination for convenience clause ent://SD_ILS/0/SD_ILS:847388 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nik Abdul Hafiz Nik Abdullah, 1977- author<br/>Author&#160;Nik Abdul Hafiz Nik Abdullah, 1977- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053114 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Contractor's implied duty to warn design defects ent://SD_ILS/0/SD_ILS:847355 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Gan, Gilbert Siang Yang, 1989-<br/>Author&#160;Gan, Gilbert Siang Yang, 1989-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053102 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2015<br/> Basis in ascertaining the amount of liquidated damages ent://SD_ILS/0/SD_ILS:847174 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Ili Liyana Azman, 1986- author<br/>Author&#160;Ili Liyana Azman, 1986- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053037 ra<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Application of estoppel and waiver in the non-fulfillment of conditions precedent ent://SD_ILS/0/SD_ILS:828055 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nur 'Izzati Hidzir, 1988-<br/>Author&#160;Nur 'Izzati Hidzir, 1988-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KD130 N87 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Defects in construction and the temporary disconformity principle ent://SD_ILS/0/SD_ILS:828123 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Ahmad Abd. Jalil, 1985-<br/>Author&#160;Ahmad Abd. Jalil, 1985-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 A56 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Basis in ascertaining the amount of liquidated damages ent://SD_ILS/0/SD_ILS:841719 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Ili Liyana Azman, 1986- author<br/>Author&#160;Ili Liyana Azman, 1986- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 I45 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Variation order in lump sum contract ent://SD_ILS/0/SD_ILS:841483 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Noor Amalina Mohayidin, 1988- author<br/>Author&#160;Noor Amalina Mohayidin, 1988- author,&#160;Maizon Hashim,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N668 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Valid and invalid variation omission of works ent://SD_ILS/0/SD_ILS:846694 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mothilal Muniandy, 1988- author<br/>Author&#160;Mothilal Muniandy, 1988- author,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 M68 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Variation order in lump sum contract ent://SD_ILS/0/SD_ILS:847036 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Noor Amalina Mohayidin, 1988- author<br/>Author&#160;Noor Amalina Mohayidin, 1988- author,&#160;Maizon Hashim,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 052983 ra<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Profile of construction contractual claims ent://SD_ILS/0/SD_ILS:847062 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nur Jazlianna Samsudin, 1990- author<br/>Author&#160;Nur Jazlianna Samsudin, 1990- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 N53 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2014<br/> Profile of construction contractual claims ent://SD_ILS/0/SD_ILS:847064 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nur Jazlianna Samsudin, 1990- author<br/>Author&#160;Nur Jazlianna Samsudin, 1990- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 052996 ra<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2014<br/> Employer's implied obligation in construction contract ent://SD_ILS/0/SD_ILS:799884 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nurulain Tazol Arrief, 1989-<br/>Author&#160;Nurulain Tazol Arrief, 1989-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N873 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Doctrine of privity and its application in relation to sub-contractitor's pay ent://SD_ILS/0/SD_ILS:799903 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nor Aida Mohd Amin, 1976-<br/>Author&#160;Nor Aida Mohd Amin, 1976-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 N676 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> The exclusion clause in government standard form of construction contracts ent://SD_ILS/0/SD_ILS:799953 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Saiful Azhar Abd. Hamid, 1977-<br/>Author&#160;Saiful Azhar Abd. Hamid, 1977-,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 S25 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Comparison of collateral warranty and indemnity in construction contract ent://SD_ILS/0/SD_ILS:818429 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nurshafeeqah Mohd. Zin, 1987-<br/>Author&#160;Nurshafeeqah Mohd. Zin, 1987-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N879 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Unconscionable call of performance bond ent://SD_ILS/0/SD_ILS:818433 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Wan Noor Solehha Wan Nik, 1985-<br/>Author&#160;Wan Noor Solehha Wan Nik, 1985-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 W36 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Termination of contract : abandonment of work ent://SD_ILS/0/SD_ILS:799727 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohd. Nur Iman Al Hafiz Mohd. Jamil, 1987-<br/>Author&#160;Mohd. Nur Iman Al Hafiz Mohd. Jamil, 1987-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M643 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012&#160;Thesis (Sarjana) - Universiti Teknologi Malaysia, 2012<br/> Summary judgement : triable issues as a defence ent://SD_ILS/0/SD_ILS:799731 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Norhazren Izatie Mohd., 1988-<br/>Author&#160;Norhazren Izatie Mohd., 1988-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N679 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Principle methods of assessing concurrent delays in construction ent://SD_ILS/0/SD_ILS:799739 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Purnomo, 1984-<br/>Author&#160;Purnomo, 1984-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 P87 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Principle methods of assessing concurrent delays in construction ent://SD_ILS/0/SD_ILS:799796 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Purnomo, 1984- author<br/>Author&#160;Purnomo, 1984- author,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 029182 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> The irrelevancy of claim for set-off in the existence of provisions in standard forms of contract ent://SD_ILS/0/SD_ILS:800218 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohamad Safuan Mohd. Nazam, 1989-<br/>Author&#160;Mohamad Safuan Mohd. Nazam, 1989-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M647 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Construing contract clause : the literal rule ent://SD_ILS/0/SD_ILS:799594 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Chai, Siaw Hiong, 1988-<br/>Author&#160;Chai, Siaw Hiong, 1988-,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 C435 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains ( Pengurusan Pembinaan Kontrak)) - Universiti Teknologi Malaysia, 2012<br/> The restraints of performance bond claims in construction industry ent://SD_ILS/0/SD_ILS:799615 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Poh, Grace Chieng Ling, 1988-<br/>Author&#160;Poh, Grace Chieng Ling, 1988-,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA210 P64 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Termination of construction contracts by employer ent://SD_ILS/0/SD_ILS:799738 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohammad Mahdi Hosseini, 1984-<br/>Author&#160;Mohammad Mahdi Hosseini, 1984-,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M648 2013 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Extension of time in commencement of arbitration proceedings ent://SD_ILS/0/SD_ILS:799905 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Noor Halwani Mokhtar, 1988-<br/>Author&#160;Noor Halwani Mokhtar, 1988-,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K840 N66 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Payment of architects' fees on termination of services ent://SD_ILS/0/SD_ILS:782906 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nurul Hayani Abu Siroh, 1988-<br/>Author&#160;Nurul Hayani Abu Siroh, 1988-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N877 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Contractor's standard of duty for design in traditional contract ent://SD_ILS/0/SD_ILS:783236 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohammad Firdaus Abdullah<br/>Author&#160;Mohammad Firdaus Abdullah,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M64 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> 'Best endeavours' for granting extension of time in construction contract ent://SD_ILS/0/SD_ILS:798424 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nur Farah Farhana Rasid, 1990-<br/>Author&#160;Nur Farah Farhana Rasid, 1990-,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N878 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> The restraints of performance bond claims in construction industry ent://SD_ILS/0/SD_ILS:798431 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Poh, Grace Chieng Ling, 1988-<br/>Author&#160;Poh, Grace Chieng Ling, 1988-,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA210 P64 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Negotiation for disputes settlement in construction claim : a case study on Air Lakitan sub-project-stage 1, Indonesia ent://SD_ILS/0/SD_ILS:802452 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Dewi Rozamurtina, 1976- author<br/>Author&#160;Dewi Rozamurtina, 1976- author,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 029516 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> The application of Selva's and Sakinas's cases in the context of LAD to the Malaysian construction industry ent://SD_ILS/0/SD_ILS:769505 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nur Shidah Maidin, 1982-<br/>Author&#160;Nur Shidah Maidin, 1982-,&#160;Nuremma Mustaffa, supervisor,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 N74 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Negotiation for disputes settlement in construction claim : a case study on Air Lakitan sub-project-stage 1, Indonesia ent://SD_ILS/0/SD_ILS:775420 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Dewi Rozamurtina, 1976-<br/>Author&#160;Dewi Rozamurtina, 1976-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 D49 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Comparison between the standard forms of building contract used in Nigeria and Malaysia ent://SD_ILS/0/SD_ILS:775423 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Bawa Mustapha<br/>Author&#160;Bawa Mustapha,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 B39 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Disputes in design and build construction contract ent://SD_ILS/0/SD_ILS:775482 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Siti Aishah Aqilah Jasri<br/>Author&#160;Siti Aishah Aqilah Jasri,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S584 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Tahap kefahaman dan penerimaan kontraktor terhadap adjudikasi dalam industri pembinaan ent://SD_ILS/0/SD_ILS:777301 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Wong, Siew Na, 1988-<br/>Author&#160;Wong, Siew Na, 1988-,&#160;Razali Adul Hamid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KD1641 W664 2011 raf<br/>Publication Date&#160;2011<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2011<br/> Responsibilities of contractors in engineering procurement constructions (EPC) contract ent://SD_ILS/0/SD_ILS:768778 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohd. Syafei Ahmad, 1976-<br/>Author&#160;Mohd. Syafei Ahmad, 1976-,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M79 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Tendering contract : breach by the employer ent://SD_ILS/0/SD_ILS:769398 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Suziana Abdul Hamid, 1978-<br/>Author&#160;Suziana Abdul Hamid, 1978-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S89 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Wrongful termination of contract in construction industry ent://SD_ILS/0/SD_ILS:775308 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Chong, Oi Siang, 1987-<br/>Author&#160;Chong, Oi Siang, 1987-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 C564 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Quantum meriut in construction contracts ent://SD_ILS/0/SD_ILS:775411 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Zairra Mat Jusoh, 1982-<br/>Author&#160;Zairra Mat Jusoh, 1982-,&#160;Jamaluddin Yaakob, supervisor,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 Z35 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Service of notice for determination in construction contracts ent://SD_ILS/0/SD_ILS:775468 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Wan Mohd. Izuddin Wan Ibrahim, 1963-<br/>Author&#160;Wan Mohd. Izuddin Wan Ibrahim, 1963-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 W55 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Use of discretion by contract principle ent://SD_ILS/0/SD_ILS:775473 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mohd. Zaidi Tuah, 1968-<br/>Author&#160;Mohd. Zaidi Tuah, 1968-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M93 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Risk in construction contractual term and condition ent://SD_ILS/0/SD_ILS:775475 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Siti Huda Kamaruzaman, 1987-<br/>Author&#160;Siti Huda Kamaruzaman, 1987-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S585 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Notice condition precedent to claim liquidated ascertained damages (LAD) ent://SD_ILS/0/SD_ILS:775619 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nur Syaimasyaza Mansor, 1987-<br/>Author&#160;Nur Syaimasyaza Mansor, 1987-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Sikap-sikap positif yang harus dimiliki oleh kontraktor untuk memahami sesebuah dokumen kontrak ent://SD_ILS/0/SD_ILS:748544 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Muhammad Hasif Isnin<br/>Author&#160;Muhammad Hasif Isnin,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH428 M84 2010 raf<br/>Publication Date&#160;2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/> Uberrimae fidei in construction insurance ent://SD_ILS/0/SD_ILS:766209 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mas Hafizah Jamil<br/>Author&#160;Mas Hafizah Jamil,&#160;Nur Emma Mustaffa, supervisor,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M378 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan))- Universiti Teknologi Malaysia, 2010<br/> Construction insurance ent://SD_ILS/0/SD_ILS:758767 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Lim, Wan Wei, 1986-<br/>Author&#160;Lim, Wan Wei, 1986-,&#160;Jamaluddin Yaakob, supervisor,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 L564 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Criteria in ascertaining professional negligence ent://SD_ILS/0/SD_ILS:758988 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Abu Bakar Hassan, 1986-<br/>Author&#160;Abu Bakar Hassan, 1986-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KD2978 A28 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> The degree of performance in construction contract ent://SD_ILS/0/SD_ILS:766156 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Ahmad Aza @ Azhar Amir<br/>Author&#160;Ahmad Aza @ Azhar Amir,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 A36 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Valuation of interim payment : contract terms and statutes ent://SD_ILS/0/SD_ILS:766668 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Roselan Nayan<br/>Author&#160;Roselan Nayan,&#160;Jamaluddin Yaakob, supervisor,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 R677 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> The implication of express provision for termination of contract due to nonpayment by employer ent://SD_ILS/0/SD_ILS:758870 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Samaila Adamu, 1969-<br/>Author&#160;Samaila Adamu, 1969-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S26 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Employer's right of set-off in construction contracts ent://SD_ILS/0/SD_ILS:758912 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Chin, Kean Voon<br/>Author&#160;Chin, Kean Voon,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2010<br/> Recovery of interest / financing charges due to prolongation in construction contract ent://SD_ILS/0/SD_ILS:768775 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Ng, Chee Kuang<br/>Author&#160;Ng, Chee Kuang,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N43 2011 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Standard of proof on fraud in civil proceedings and voidable construction contract ent://SD_ILS/0/SD_ILS:771167 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Azman Hamzah, 1984-<br/>Author&#160;Azman Hamzah, 1984-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 A96 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2010<br/> Instrumen yang digunakan kontraktor dalam menentukan tuntutan bayaran interim ent://SD_ILS/0/SD_ILS:781502 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Muhammad Izzat Mirza Julaihi, 1986-<br/>Author&#160;Muhammad Izzat Mirza Julaihi, 1986-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M84 2010 taf<br/>Publication Date&#160;2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/> Breaches of contract in construction industry ent://SD_ILS/0/SD_ILS:604330 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Yap, Lawrence Sie Kiong, 1985-<br/>Author&#160;Yap, Lawrence Sie Kiong, 1985-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020798 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Fair and reasonable assessment in granting extension of time ent://SD_ILS/0/SD_ILS:604334 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nor Azizan Muhamed, 1970-<br/>Author&#160;Nor Azizan Muhamed, 1970-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020790 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Extent of contractor's obligation to provide information and permitting access to his own records ent://SD_ILS/0/SD_ILS:604338 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Enegbuma Wallace Imoudu<br/>Author&#160;Enegbuma Wallace Imoudu,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020970 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Claim due to discrepancies in contract documents ent://SD_ILS/0/SD_ILS:604342 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Wan Azlina Ibrahim<br/>Author&#160;Wan Azlina Ibrahim,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 022338 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan Kontrak)) - Universiti Teknologi Malaysia, 2009<br/> The legal issues relating to retention money ent://SD_ILS/0/SD_ILS:604346 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Wee, Chiew Ang, 1975<br/>Author&#160;Wee, Chiew Ang, 1975,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 022999 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The legal status of construction work programme in the construction industry ent://SD_ILS/0/SD_ILS:604347 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Siti Fairus Othman, 1976-<br/>Author&#160;Siti Fairus Othman, 1976-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 021544 ra<br/>Publication Date&#160;2009<br/> Judicial interpretations of the term 'lump sum' in construction contract ent://SD_ILS/0/SD_ILS:604356 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Norwati Mohamad Ali, 1977-<br/>Author&#160;Norwati Mohamad Ali, 1977-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 019954 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The profile of construction contract termination cases ent://SD_ILS/0/SD_ILS:604371 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Roslinda Rosly<br/>Author&#160;Roslinda Rosly,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 023006 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Contractor's rights in the event employer's insolvency ent://SD_ILS/0/SD_ILS:604372 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Olivia Anak Rayeg<br/>Author&#160;Olivia Anak Rayeg,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 023118 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2009<br/> Legal effect of breach of warranty in construction insurance in Malaysia ent://SD_ILS/0/SD_ILS:604751 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mahmoud Sodangi, 1979-<br/>Author&#160;Mahmoud Sodangi, 1979-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020796 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Recoveries of differing site conditions in construction contracts ent://SD_ILS/0/SD_ILS:604733 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Ong, Kuan Yuen, 1981-<br/>Author&#160;Ong, Kuan Yuen, 1981-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;TH425 O53 2008 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The application of &quot;pay when pay&quot; provisions in construction sub contract ent://SD_ILS/0/SD_ILS:604741 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nasyira Ibrahim, 1986-<br/>Author&#160;Nasyira Ibrahim, 1986-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 021532 ra<br/>Publication Date&#160;2009<br/> Contractors's application of extension of time in PAM 1998 ent://SD_ILS/0/SD_ILS:628363 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Afisza Irfan Azmi<br/>Author&#160;Afisza Irfan Azmi,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH153 A35 2009 raf<br/>Publication Date&#160;2009<br/>Thesis Sarjana Sains (Pengurusan Kontrak Pembinaan)-Universiti Teknologi Malaysia,2009<br/> Contractors's application of extension of time in PAM 1998 ent://SD_ILS/0/SD_ILS:628440 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Afisza Irfan Azmi<br/>Author&#160;Afisza Irfan Azmi,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 026213 ra<br/>Publication Date&#160;2009<br/>Thesis Sarjana Sains (Pengurusan Konrak Pembinaan)-Universiti Teknologi Malaysia,2009<br/> The power and authority to issue VS. to approve variation order : the legal perspective ent://SD_ILS/0/SD_ILS:758975 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Destilla Mohamad Azami, 1973-<br/>Author&#160;Destilla Mohamad Azami, 1973-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 D47 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Variation orders in design and build contracts ent://SD_ILS/0/SD_ILS:768650 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Heng, Robert Wei Kiong, 1973-<br/>Author&#160;Heng, Robert Wei Kiong, 1973-,&#160;Rosli Abdul Rashid, supervisor,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 H46 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The importance of condition of contract in contract document ent://SD_ILS/0/SD_ILS:771164 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nurulhuda Ahamad<br/>Author&#160;Nurulhuda Ahamad,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N876 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Kelewatan bayaran interim kepada kontraktor ent://SD_ILS/0/SD_ILS:780082 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Rita Minsi, 1982-<br/>Author&#160;Rita Minsi, 1982-,&#160;Rosli Abd. Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 R58 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/> Recoveries of differing site conditions in construction contracts ent://SD_ILS/0/SD_ILS:782262 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Ong, Kuan Yuen, 1981-<br/>Author&#160;Ong, Kuan Yuen, 1981-,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 023085 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The enforceability of liquidated and ascertained damages in construction contract ent://SD_ILS/0/SD_ILS:604389 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Chia, Eunice Mei Ling, 1985-<br/>Author&#160;Chia, Eunice Mei Ling, 1985-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020802 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Notice of loss and / or expense claim in PAM 2006 ent://SD_ILS/0/SD_ILS:604377 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Titus, Olalekan Olaolu, 1979-<br/>Author&#160;Titus, Olalekan Olaolu, 1979-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020680 ra<br/>Publication Date&#160;2009<br/> Letter of acceptance award as an unqualified acceptance ent://SD_ILS/0/SD_ILS:604453 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Yow, Li Ping, 1983-<br/>Author&#160;Yow, Li Ping, 1983-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;TH42 Y684 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Contractor's right to claim for extra works ent://SD_ILS/0/SD_ILS:604469 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Yap, Chiaw Guan, 1985-<br/>Author&#160;Yap, Chiaw Guan, 1985-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 019959 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Rescission, variation and waiver of contract ent://SD_ILS/0/SD_ILS:604470 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Zuhaili Mohamad Ramly, 1984-<br/>Author&#160;Zuhaili Mohamad Ramly, 1984-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 021772 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2009<br/> Fair and reasonable assessment in granting extension of time ent://SD_ILS/0/SD_ILS:399417 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nor Azizan Muhamed, 1970-<br/>Author&#160;Nor Azizan Muhamed, 1970-,&#160;Maizon Hashim, supervisor,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KPG2590.A31994 N39 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Extent of contractor's obligation to provide information and permitting access to his own records ent://SD_ILS/0/SD_ILS:399486 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Enegbuma Wallace Imoudu<br/>Author&#160;Enegbuma Wallace Imoudu,&#160;Norazam Othman, supervisor,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 E534 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Claims due to discrepancies in contract documents ent://SD_ILS/0/SD_ILS:399502 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Wan Azlina Ibrahim<br/>Author&#160;Wan Azlina Ibrahim,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 W364 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The legal issues relating to retention money ent://SD_ILS/0/SD_ILS:399550 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Wee, Chiew Ang, 1975<br/>Author&#160;Wee, Chiew Ang, 1975,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.M35 W44 2009 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The legal status of construction work programme in the construction industry ent://SD_ILS/0/SD_ILS:399552 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Siti Fairus Othman, 1976-<br/>Author&#160;Siti Fairus Othman, 1976-,&#160;Nur Emma Mustaffa, supervisor,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 S42 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2009<br/> An approach to a fair and reasonable extension of time assessment ent://SD_ILS/0/SD_ILS:399654 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Lee, Kah Chuong<br/>Author&#160;Lee, Kah Chuong,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KPG2590.A31994 L33 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The profile of construction contract termination cases ent://SD_ILS/0/SD_ILS:399661 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Roslinda Rosly<br/>Author&#160;Roslinda Rosly,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH435 R674 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Contractor's rights in the event of employer's insolvency ent://SD_ILS/0/SD_ILS:399665 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Olivia Rayeg<br/>Author&#160;Olivia Rayeg,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 O45 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Letter of acceptance award as an unqualified acceptance ent://SD_ILS/0/SD_ILS:400028 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Yow, Li Ping, 1983-<br/>Author&#160;Yow, Li Ping, 1983-,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 023032 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Contractor's right to claim for extra works ent://SD_ILS/0/SD_ILS:400098 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Yap, Chiaw Guan, 1985-<br/>Author&#160;Yap, Chiaw Guan, 1985-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 Y36 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The application of &quot;pay when pay&quot; provisions in construction sub contract ent://SD_ILS/0/SD_ILS:401978 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nasyira Ibrahim, 1986-<br/>Author&#160;Nasyira Ibrahim, 1986-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N37 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Legal effect of breach of warranty in construction insurance in Malaysia ent://SD_ILS/0/SD_ILS:402035 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Mahmoud Sodangi, 1979-<br/>Author&#160;Mahmoud Sodangi, 1979-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;HG8053.7 M33 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Time essence and termination in construction contract ent://SD_ILS/0/SD_ILS:402040 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Liew, Li Ming<br/>Author&#160;Liew, Li Ming,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 L53 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Breaches of contract in construction industry ent://SD_ILS/0/SD_ILS:399380 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Yap, Lawrence Sie Kiong, 1985-<br/>Author&#160;Yap, Lawrence Sie Kiong, 1985-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 Y364 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Judicial interpretations of the term 'lump sum' in construction contract ent://SD_ILS/0/SD_ILS:399589 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Norwati Mohamad Ali, 1977-<br/>Author&#160;Norwati Mohamad Ali, 1977-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 N67 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Notice of loss and / or expense claim in PAM 2006 ent://SD_ILS/0/SD_ILS:399680 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Titus, Olalekan Olaolu, 1979-<br/>Author&#160;Titus, Olalekan Olaolu, 1979-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 T57 2009 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The enforceability of liquidated and ascertained damages in construction contract ent://SD_ILS/0/SD_ILS:399732 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Chia, Eunice Mei Ling, 1985-<br/>Author&#160;Chia, Eunice Mei Ling, 1985-,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 C44 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Payment dilemma for sub contractors ent://SD_ILS/0/SD_ILS:399736 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Farihan Mohd. Rafie<br/>Author&#160;Farihan Mohd. Rafie,&#160;Rosli Abdul Rashid, supervisor,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 F376 2009 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2009<br/> Rescission, variation and waiver of contract ent://SD_ILS/0/SD_ILS:400108 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Zuhaili Mohamad Ramly, 1984-<br/>Author&#160;Zuhaili Mohamad Ramly, 1984-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 Z83 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2009<br/> Tuntutan bayaran oleh kontraktor dalam kerja pembinaan ent://SD_ILS/0/SD_ILS:302986 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Ng, Angela Shin Yii<br/>Author&#160;Ng, Angela Shin Yii,&#160;Kherun Nita Ali, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N424 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/> Implikasi lanjutan masa terhadap kontraktor dan klien ent://SD_ILS/0/SD_ILS:253361 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nik Alyatul Aqilah Zahri<br/>Author&#160;Nik Alyatul Aqilah Zahri,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N54 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Kajian ke atas penggunaan harga cut-off dalam sistem penilaian tender Jabatan Kerja Raya ent://SD_ILS/0/SD_ILS:253745 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Siti Norbaya Alias<br/>Author&#160;Siti Norbaya Alias,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S576 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Novation agreement in design and build contracts ent://SD_ILS/0/SD_ILS:590495 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Natasha Sahil<br/>Author&#160;Natasha Sahil,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020899 ra<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Differing site condition ent://SD_ILS/0/SD_ILS:303675 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Faraziera Mohd. Raslim, 1983-<br/>Author&#160;Faraziera Mohd. Raslim, 1983-,&#160;Nur Emma Mustaffa, supervisor,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 F375 2008<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> The unsuccesful reasons of set-off in construction contract ent://SD_ILS/0/SD_ILS:304009 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nor Azlina Ismail, 1983-<br/>Author&#160;Nor Azlina Ismail, 1983-,&#160;Jamaluddin Yaakob, supervisor,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N678 2008<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Main contractor's entitlement to an extension of time due to concurrent delay ent://SD_ILS/0/SD_ILS:304064 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Airennizah Othman, 1985-<br/>Author&#160;Airennizah Othman, 1985-,&#160;Nur Emma Mustaffa, supervisor,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 A374 2008<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Contractor right of action against architect or engineer for negligence ent://SD_ILS/0/SD_ILS:303792 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Nur Farahah Che Nu, 1985-<br/>Author&#160;Nur Farahah Che Nu, 1985-,&#160;Rosli Abdul Rashid, supervisor,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N875 2008<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Novation agreement in design and build contracts ent://SD_ILS/0/SD_ILS:251335 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Natasha Sahil<br/>Author&#160;Natasha Sahil,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N37 2008<br/>Publication Date&#160;2008<br/><a href="http://eprints.utm.my/5908">Full text thesis via UTM-IR</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Kesan kelewatan pembayaran terhadap aliran tunai kontraktor ent://SD_ILS/0/SD_ILS:254772 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Siti Haizan Azmi<br/>Author&#160;Siti Haizan Azmi,&#160;Razali Adul Hamid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S575 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Masa yang diperlukan oleh jurukur bahan untuk menyediakan dokumen tender berkuantiti ent://SD_ILS/0/SD_ILS:254784 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Teo, Yiien Yiik<br/>Author&#160;Teo, Yiien Yiik,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 T464 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Performance bond : conditional or unconditional ent://SD_ILS/0/SD_ILS:198089 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Azizan Supardi<br/>Author&#160;Azizan Supardi,&#160;Jamaluddin Yaakob,&#160;Nur Emma Mustaffa,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 A94 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> A repudiatory breach in the construction industry : non-payment ent://SD_ILS/0/SD_ILS:784690 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Lee, Shih Yin<br/>Author&#160;Lee, Shih Yin,&#160;Fakulti Alam Bina<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 014662 ra<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Performance bond : conditional or unconditional ent://SD_ILS/0/SD_ILS:576611 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Azizan Supardi<br/>Author&#160;Azizan Supardi,&#160;Jamaluddin Yaakob,&#160;Nur Emma Mustaffa,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 015027<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Perhubungan, penyelarasan dan pelaksanaan di antara perunding-perunding dalam A.I.S (Accelerated Implementation System) ent://SD_ILS/0/SD_ILS:822751 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Khairi Abdul Jamil, author<br/>Author&#160;Khairi Abdul Jamil, author,&#160;Omar Munir, superviosr,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 K52 1984 raf<br/>Publication Date&#160;1984<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 1984<br/> Kajian kelambatan persiapan di peringkat pra-kontrak ent://SD_ILS/0/SD_ILS:822748 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Zaiha Ariffin, author<br/>Author&#160;Zaiha Ariffin, author,&#160;Rosli Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 Z3 1983 raf<br/>Publication Date&#160;1983<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1983<br/> Fraud in construction contract ent://SD_ILS/0/SD_ILS:858194 2024-04-24T08:07:24Z 2024-04-24T08:07:24Z by&#160;Zaiti Zulaika Zainul Abidin, 1989- author<br/>Author&#160;Zaiti Zulaika Zainul Abidin, 1989- author,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;XX(858194.1)<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2016<br/>