Search Results for - Narrowed by: Closed Access Thesis - Construction industrySirsiDynix Enterprisehttp://portal.utm.my/client/en_AU/main/main/qf$003dITYPE$002509Material$002bType$0025091$00253ACLS_THESIS$002509Closed$002bAccess$002bThesis$0026qf$003dSUBJECT$002509Subject$002509Construction$002bindustry$002509Construction$002bindustry$0026ps$003d300?dt=list2024-05-08T01:06:48ZThe effect of economic situation on construction business in Malaysiaent://SD_ILS/0/SD_ILS:8862382024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Shamsuri Shamsuddin, 1983-, author<br/>Author Mohd. Shamsuri Shamsuddin, 1983-, author, Asan Ali Golam Hassan@Mohammad, supervisor, Nanthakumar Loganathan, supervisor, Fakulti Kejuruteraan. Sekolah Kejuruteraan Awam<br/>Format: Books<br/>Call Number HC445.5 M64 2020 raf<br/>Publication Date 2020<br/>Thesis (Sarjana Pengurusan Projek) - Universiti Teknologi Malaysia, 2020<br/>Adoption of contour crafting in cost effectiveness for 3D construction printing in Malaysiaent://SD_ILS/0/SD_ILS:8837672024-05-08T01:06:48Z2024-05-08T01:06:48Zby Liew, Jia Ming, 1988-, author<br/>Author Liew, Jia Ming, 1988-, author, Eeydzah Aminudin, 1987-, supervisor, Fakulti Kejuruteraan. Sekolah Kejuruteraan Awam<br/>Format: Books<br/>Call Number TS171.95 L54 2019 raf<br/>Publication Date 2019<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2019<br/>Cabaran dalam pengurusan loji bancuhan konkritent://SD_ILS/0/SD_ILS:8712142024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Khalid Kamaruddin, 1984-, author<br/>Author Mohd. Khalid Kamaruddin, 1984-, author, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA683 M64 2018 raf<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/>Roadmap for implementing value management in the Nigerian construction industryent://SD_ILS/0/SD_ILS:8819062024-05-08T01:06:48Z2024-05-08T01:06:48Zby Bruno Lot Tanko, 1982-, author<br/>Author Bruno Lot Tanko, 1982-, author, Fadhlin Abdullah, supervisor, Zuhaili Mohamad Ramly, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number TS168 B78 2018 raf<br/>Publication Date 2018<br/>Thesis (Doktor Falsafah) - Universiti Teknologi Malaysia, 2018<br/>Isu dan cabaran kontraktor dalam perlaksanaan projek kerajaan yang menggunakan IBSent://SD_ILS/0/SD_ILS:8712352024-05-08T01:06:48Z2024-05-08T01:06:48Zby Awadi Mamat, 1980-, author<br/>Author Awadi Mamat, 1980-, author, Abdul Rahim Abdul Hamid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH443 A93 2017 raf<br/>Publication Date 2017<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2017<br/>Halangan dan faktor potensi perlaksanaan permodelan maklumat binaan dalam kalangan arkitek dan jurutera awam DBKLent://SD_ILS/0/SD_ILS:8687132024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ahmad Azrol Badiozaman, author<br/>Author Ahmad Azrol Badiozaman, author, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(868713.2)<br/>Publication Date 2017<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2017<br/>Low back pain mitigation method in construction industryent://SD_ILS/0/SD_ILS:8702362024-05-08T01:06:48Z2024-05-08T01:06:48Zby Norzarina Othman, author<br/>Author Norzarina Othman, author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 N67 2017 raf<br/>Publication Date 2017<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/>Perbandingan kos dan tempoh pembinaan bangunan tambahan sekolahent://SD_ILS/0/SD_ILS:7776372024-05-08T01:06:48Z2024-05-08T01:06:48Zby Siti Khatijah Deraman, author<br/>Author Siti Khatijah Deraman, author, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 S54 2011 raf<br/>Publication Date 2016<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2011<br/>Susun atur tapak yang menjamin kecekapan di tapak binaent://SD_ILS/0/SD_ILS:8644492024-05-08T01:06:48Z2024-05-08T01:06:48Zby Muhammad Zulfikri Mamat, 1992-, author<br/>Author Muhammad Zulfikri Mamat, 1992-, author, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 M844 2016 raf<br/>Publication Date 2016<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2016<br/>Construction safety enhancement in Kota Kinabaluent://SD_ILS/0/SD_ILS:8687822024-05-08T01:06:48Z2024-05-08T01:06:48Zby Werson Jerry, 1981-, author<br/>Author Werson Jerry, 1981-, author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH443 J47 2016 raf<br/>Publication Date 2016<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2016<br/>Proof of documentation in claming extension of timeent://SD_ILS/0/SD_ILS:8584982024-05-08T01:06:48Z2024-05-08T01:06:48Zby Wong Ing Sing, 1991- author<br/>Author Wong Ing Sing, 1991- author, Nur Emma Mustaffa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number XX(858498.1)<br/>Publication Date 2016<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2016<br/>Keberkesanan shassic dalam indudtri pembinaan di Sarawakent://SD_ILS/0/SD_ILS:8608422024-05-08T01:06:48Z2024-05-08T01:06:48Zby Faizol Hassim, 1977- , author<br/>Author Faizol Hassim, 1977- , author, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 F35 2016 raf<br/>Publication Date 2016<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2016<br/>Judicial decisions in setting aside adjudication decision under CIPAA 2012ent://SD_ILS/0/SD_ILS:8620572024-05-08T01:06:48Z2024-05-08T01:06:48Zby Chong, Soo Hooi, 1976-, author<br/>Author Chong, Soo Hooi, 1976-, author, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number XX(862057.1)<br/>Publication Date 2016<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/>Issues of migration (foreign workers) into our construction industryent://SD_ILS/0/SD_ILS:8688072024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Azam Che Him, 1987-, author<br/>Author Mohd. Azam Che Him, 1987-, author, Abdul Rahim Abdul Hamid, 1980-, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA219 M64 2016 raf<br/>Publication Date 2016<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2016<br/>Contractor's implied duty to warn design defectsent://SD_ILS/0/SD_ILS:8466902024-05-08T01:06:48Z2024-05-08T01:06:48Zby Gan, Gilbert Siang Yang, 1989-<br/>Author Gan, Gilbert Siang Yang, 1989-, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH425 G36 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>Pendirian profesional berkaitan rasuah dalam industri pembinaanent://SD_ILS/0/SD_ILS:8487212024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nur Marsuani Mohamed Yusof, 1991-, author<br/>Author Nur Marsuani Mohamed Yusof, 1991-, author, Abdul Rahim Abdul Hamid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 N873 2015 raf<br/>Publication Date 2015<br/>Project Paper (Sarjana Muda (Kejuruteraan Awam - Pengurusan))- Universiti Teknologi Malaysia, 2015<br/>Kajian buruh asing dalam industri pembinaan : masalah dan cara mengatasient://SD_ILS/0/SD_ILS:8487272024-05-08T01:06:48Z2024-05-08T01:06:48Zby Rozaidi Mazlan, 1992-, author<br/>Author Rozaidi Mazlan, 1992-, author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2R69 2015 raf<br/>Publication Date 2015<br/>Project Paper (Sarjana Muda (Kejuruteraan Awam - Pengurusan))- Universiti Teknologi Malaysia, 2015<br/>Common approach used by the industry in assessing the contractor entitlement for extention of time in the event of concurrent delayent://SD_ILS/0/SD_ILS:8444542024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohammad Irfan Ahmad Zaki, 1981-<br/>Author Mohammad Irfan Ahmad Zaki, 1981-, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH425 M648 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>The prevailing practice in deciding the practical completion of construction workent://SD_ILS/0/SD_ILS:8473612024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohammad Harith Mohd. Yunos, 1982- author<br/>Author Mohammad Harith Mohd. Yunos, 1982- author, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH425 M649 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>Bunyi bising di tapak binaan: cerapan dan ramalanent://SD_ILS/0/SD_ILS:8483762024-05-08T01:06:48Z2024-05-08T01:06:48Zby Khairunnisa Abdullah, 1992-, author<br/>Author Khairunnisa Abdullah, 1992-, author, Zaiton Haron, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 K433 2015 raf<br/>Publication Date 2015<br/>Project Paper (Sarjana Muda (Kejuruteraan Awam - Struktur)) - Universiti Teknologi Malaysia, 2015<br/>The influenced of construction work plan on cost effective in aluminium formwork systement://SD_ILS/0/SD_ILS:8486372024-05-08T01:06:48Z2024-05-08T01:06:48Zby Maryssa Alwyn Kisil, 1991-, author<br/>Author Maryssa Alwyn Kisil, 1991-, author, Rozana Zakaria, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 M373 2015 raf<br/>Publication Date 2015<br/>Project Paper (Sarjana Muda (Kejuruteraan Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2015<br/>Issues faced by women in construction industryent://SD_ILS/0/SD_ILS:8487152024-05-08T01:06:48Z2024-05-08T01:06:48Zby Natasha Syahirah Shaari, 1992-, author<br/>Author Natasha Syahirah Shaari, 1992-, author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 N383 2015 raf<br/>Publication Date 2015<br/>Project Paper (Sarjana Muda (Kejuruteraan Awam - Pengurusan))- Universiti Teknologi Malaysia, 2015<br/>Pemasalahan pelaksanaan projek pembinaan kecil di Jajahan Pasir Putehent://SD_ILS/0/SD_ILS:8559772024-05-08T01:06:48Z2024-05-08T01:06:48Zby Rosmaizura Abdul Fatah, 1983-, author<br/>Author Rosmaizura Abdul Fatah, 1983-, author, Abdul Rahim Abdul Hamid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 R673 2015 raf<br/>Publication Date 2015<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2015<br/>Keperluan program pembangunan dan latihan Kontraktor Pembinaan Bumiputera Gred G1-G3 di Negeri Terengganuent://SD_ILS/0/SD_ILS:8559792024-05-08T01:06:48Z2024-05-08T01:06:48Zby Noor Azliana Azlan, 1986-, author<br/>Author Noor Azliana Azlan, 1986-, author, Abdul Rahim Abdul Hamid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 N663 2015 raf<br/>Publication Date 2015<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2015<br/>Constructability comparison between IBS and conventional constructionent://SD_ILS/0/SD_ILS:8455462024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ehsan Harirchian, 1989- author<br/>Author Ehsan Harirchian, 1989- author, Abdul Kadir Marsono, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH1000 E47 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana (Kejuruteraan Awam - Pengurusan Projek)) - Universiti Teknologi Malaysia, 2015<br/>Safety budgeting cost for construction projectent://SD_ILS/0/SD_ILS:8214382024-05-08T01:06:48Z2024-05-08T01:06:48Zby Firdaus Abd. Latib 1983-<br/>Author Firdaus Abd. Latib 1983-, Abdul Rahim Abdul Hamid, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715 F57 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Evaluating the level of awareness on lean thinking concept in construction among higher learning students in Malaysiaent://SD_ILS/0/SD_ILS:8217662024-05-08T01:06:48Z2024-05-08T01:06:48Zby Sanaz Tabatabaee, 1986-<br/>Author Sanaz Tabatabaee, 1986-, Khairulzan Yahya, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 S264 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Contractor’s organization and work performance in the construction industryent://SD_ILS/0/SD_ILS:8218652024-05-08T01:06:48Z2024-05-08T01:06:48Zby Juhana Junid, 1988-<br/>Author Juhana Junid, 1988-, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA210 J843 2014<br/>Publication Date 2014<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) –Universiti Teknologi Malaysia, 2014<br/>Comparison for components of cost overrun in constructionent://SD_ILS/0/SD_ILS:8327072024-05-08T01:06:48Z2024-05-08T01:06:48Zby Liu, Linbo, 1990- author<br/>Author Liu, Linbo, 1990- author, Shaiful Amri Mansur, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715 L58 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Corporate social responsibility practices by public limited construction firms in Malaysiaent://SD_ILS/0/SD_ILS:8466812024-05-08T01:06:48Z2024-05-08T01:06:48Zby Suzana C. Alih, 1987- author<br/>Author Suzana C. Alih, 1987- author, Christopher Nigel Preece supervisor, Sarajul Fikri Mohamed, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 S89 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Sains (Ukur Bahan)) - Universiti Teknologi Malaysia, 2014<br/>Post-tensioned infills effect on lateral resistance of industrialized building systement://SD_ILS/0/SD_ILS:8214662024-05-08T01:06:48Z2024-05-08T01:06:48Zby Bashar Hassen Mohammed, 1976-<br/>Author Bashar Hassen Mohammed, 1976-, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH1000 B37 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Struktur)) - Universiti Teknologi Malaysia, 2014<br/>This title is Classified as an Open Access starting from 16/7/2019<br/>Labours’ productivity in the construction siteent://SD_ILS/0/SD_ILS:8214882024-05-08T01:06:48Z2024-05-08T01:06:48Zby Kiyanoosh Golchin Rad 1984-<br/>Author Kiyanoosh Golchin Rad 1984-, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD5548.8 K59 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Impact of stressors on workers on construction sitesent://SD_ILS/0/SD_ILS:8217112024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nur Izieadiana Abidin 1989- author<br/>Author Nur Izieadiana Abidin 1989- author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715 N59 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) –Universiti Teknologi Malaysia, 2014<br/>Mitigating construction disputesent://SD_ILS/0/SD_ILS:8362842024-05-08T01:06:48Z2024-05-08T01:06:48Zby Fatin Mohamad Muhiddin, 1991- , author<br/>Author Fatin Mohamad Muhiddin, 1991- , author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 F383 2014 raf<br/>Publication Date 2014<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2014<br/>Ergonomics awareness in construction industryent://SD_ILS/0/SD_ILS:8386582024-05-08T01:06:48Z2024-05-08T01:06:48Zby Hazwani Halipah, 1989- author<br/>Author Hazwani Halipah, 1989- author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715 H39 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan))) - Universiti Teknologi Malaysia, 2014<br/>Problems associated with evaluation of extension time (EOT) claim in government projectent://SD_ILS/0/SD_ILS:8423392024-05-08T01:06:48Z2024-05-08T01:06:48Zby Siti Aisah Mat Isa, 1987-<br/>Author Siti Aisah Mat Isa, 1987-, Maizon Hashim, Fakulti Alam Bina<br/>Format: Books<br/>Call Number K840 S58 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Kepimpinan di dalam industri pembinaanent://SD_ILS/0/SD_ILS:8433212024-05-08T01:06:48Z2024-05-08T01:06:48Zby Amir Redzuan Shaharuddin, 1983- , author<br/>Author Amir Redzuan Shaharuddin, 1983- , author, Abdul Rahim Abdul Hamid, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 A455 2014 raf<br/>Publication Date 2014<br/>Project Paper (Sarjana Muda (Kejuruteraan Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Knowledge management in the civil engineering construction sector in Nigeriaent://SD_ILS/0/SD_ILS:8367492024-05-08T01:06:48Z2024-05-08T01:06:48Zby Kasimu Alhaji Mohammed, 1972-<br/>Author Kasimu Alhaji Mohammed, 1972-, Roslan Amirudin, supervisor, Fadhlin Abdullah, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD30.2 K37 2014 raf<br/>Publication Date 2014<br/>Thesis (Ph.D (Ukur Bahan)) - Universiti Teknologi Malaysia, 2014<br/>Choice of alternative dispute resolutions in construction disputesent://SD_ILS/0/SD_ILS:8386492024-05-08T01:06:48Z2024-05-08T01:06:48Zby Fazzarieyyah Abd. Halim, 1983- author<br/>Author Fazzarieyyah Abd. Halim, 1983- author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715 F39 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Reverse logistic for industrial building system construction projectent://SD_ILS/0/SD_ILS:8386612024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohanad Kamil Buniya, 1984- author<br/>Author Mohanad Kamil Buniya, 1984- author, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715 M64 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan))) - Universiti Teknologi Malaysia, 2014<br/>Assessment of loss and expense for extension of timeent://SD_ILS/0/SD_ILS:8466292024-05-08T01:06:48Z2024-05-08T01:06:48Zby Sorfina 'Izzati Mohd. Said, 1983 author<br/>Author Sorfina 'Izzati Mohd. Said, 1983 author, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number K840.O56 S67 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Friction mechanism in IBS blockworks columnent://SD_ILS/0/SD_ILS:8003372024-05-08T01:06:48Z2024-05-08T01:06:48Zby Muhammad Zakaria Baderul Hisham, 1988-<br/>Author Muhammad Zakaria Baderul Hisham, 1988-, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH1491 M84 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Kejuruteraan (Awam - Struktur)) - Universiti Teknologi Malaysia, 2013<br/>This title is Open Access thesis starting from 21/1/2018<br/>Corruption in constructionent://SD_ILS/0/SD_ILS:8007712024-05-08T01:06:48Z2024-05-08T01:06:48Zby B. Gevansri K. Baskran, 1987-<br/>Author B. Gevansri K. Baskran, 1987-, Abdul Rahim Abdul Hamid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 B44 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>The implementation of eco-labelling for construction materials in Malaysian construction industryent://SD_ILS/0/SD_ILS:8012102024-05-08T01:06:48Z2024-05-08T01:06:48Zby Seyedmohsen Hosseini, 1983-<br/>Author Seyedmohsen Hosseini, 1983-, Rozana Zakaria, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HF5413 S49 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Management of variation order in Public Work Department Malaysia construction projectent://SD_ILS/0/SD_ILS:8012622024-05-08T01:06:48Z2024-05-08T01:06:48Zby Sharil Amran Amir Mohamed, 1986-<br/>Author Sharil Amran Amir Mohamed, 1986-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 S537 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Tahap pelaksanaan amalan 5S melalui pendekatan PDCA oleh pihak pengurusan syarikat kontraktorent://SD_ILS/0/SD_ILS:8057792024-05-08T01:06:48Z2024-05-08T01:06:48Zby Tengku Syarifah Bisfullizan Tengku Syed Ab. Muid, 1987-<br/>Author Tengku Syarifah Bisfullizan Tengku Syed Ab. Muid, 1987-, Ismail Haron, supervisor, Norazam Othmand, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 T465 2013 raf<br/>Publication Date 2013<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Client perspective towards application of industrialised building system in private construction projetcsent://SD_ILS/0/SD_ILS:8199782024-05-08T01:06:48Z2024-05-08T01:06:48Zby Norlia Sofa Suraji, 1983-<br/>Author Norlia Sofa Suraji, 1983-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH1000 N675 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>The environmental protection through utilising sustainable material in construction industryent://SD_ILS/0/SD_ILS:8201702024-05-08T01:06:48Z2024-05-08T01:06:48Zby Teo, Tze Meng, 1989-<br/>Author Teo, Tze Meng, 1989-, Muhd. Zaimi Abd. Majid, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 T46 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>An evaluation of effectiveness of approximate quantity method in estimating construction costent://SD_ILS/0/SD_ILS:8201282024-05-08T01:06:48Z2024-05-08T01:06:48Zby Siew, Sik Nguong, 1989-<br/>Author Siew, Sik Nguong, 1989-, Khairulzan Yahya, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH435 S54 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>The rights of contractor on recovery of payment after termination of contract under security of payment regimesent://SD_ILS/0/SD_ILS:8002232024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ng, Seng Yao, 1983-<br/>Author Ng, Seng Yao, 1983-, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 N47 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Analysis of industrialized building system block work with ETABSent://SD_ILS/0/SD_ILS:8003132024-05-08T01:06:48Z2024-05-08T01:06:48Zby Maziar Ghabel Rahmat, 1984-<br/>Author Maziar Ghabel Rahmat, 1984-, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH1000 M39 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Kejuruteraan (Awam - Struktur)) - Universiti Teknologi Malaysia, 2013<br/>Restricted until 21 January 2018<br/>Contract administration problement://SD_ILS/0/SD_ILS:8007782024-05-08T01:06:48Z2024-05-08T01:06:48Zby Bakori Ahmad, 1969-<br/>Author Bakori Ahmad, 1969-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH425 B35 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Ergonomics management for the control of sprains and strains in construction industryent://SD_ILS/0/SD_ILS:8011042024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nurul Aini Osman, 1984-<br/>Author Nurul Aini Osman, 1984-, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD5718.B9 N87 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Unconscionable call of performance bondent://SD_ILS/0/SD_ILS:8184332024-05-08T01:06:48Z2024-05-08T01:06:48Zby Wan Noor Solehha Wan Nik, 1985-<br/>Author Wan Noor Solehha Wan Nik, 1985-, Jamaluddin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number K891.B8 W36 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Occupational noise exposure among construction workersent://SD_ILS/0/SD_ILS:8201382024-05-08T01:06:48Z2024-05-08T01:06:48Zby Stephanie Stella Dawi, 1987-<br/>Author Stephanie Stella Dawi, 1987-, Zaiton Haron, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD5718.B9 S74 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Sistem maklumat pengurusan risiko pembinaan (CRMIS)ent://SD_ILS/0/SD_ILS:8253352024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Hafis Ahmad, 1979-, author<br/>Author Mohd. Hafis Ahmad, 1979-, author, Rosli Anang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(825335.1)<br/>Publication Date 2013<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Design a mini crane for construction industryent://SD_ILS/0/SD_ILS:7929022024-05-08T01:06:48Z2024-05-08T01:06:48Zby Muhammad Ishyak Mohammad Nuri, 1989-<br/>Author Muhammad Ishyak Mohammad Nuri, 1989-, Masine Md. Tap, supervisor, Fakulti Kejuruteraan Mekanikal<br/>Format: Books<br/>Call Number XX(792902.1)<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Kejuruteraan (Mekanikal - Industri)) - Universiti Teknologi Malaysia, 2012<br/>Material, labour and equipment related delay factor in construction industryent://SD_ILS/0/SD_ILS:7935022024-05-08T01:06:48Z2024-05-08T01:06:48Zby Chia, Boon Shien, 1990-<br/>Author Chia, Boon Shien, 1990-, Zakaria Mohd. Yusof, supervisor, Norizan Mansor, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 C45 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Strategi kontraktor dalam menangani kelewatan penyiapan projek pembinaanent://SD_ILS/0/SD_ILS:7935382024-05-08T01:06:48Z2024-05-08T01:06:48Zby Roslida Mohamed, 1966- , author<br/>Author Roslida Mohamed, 1966- , author, Norazam Othman, supervisor, Aminudin Ali, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 R67 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda) - Universiti Teknologi Malaysia, 2012<br/>A study on ICT adoption for materials management among contractors in construction industryent://SD_ILS/0/SD_ILS:7935992024-05-08T01:06:48Z2024-05-08T01:06:48Zby Chai, Sheng Jane, 1990-<br/>Author Chai, Sheng Jane, 1990-, Fara Diva Mustapa, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TS161 C43 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Kajian perbandingan keupayaan binaan (constructability), tempoh masa penyiapan dan kos antara kaedah sistem binaan berindustri (IBS) dan konvensional untuk projek sekolahent://SD_ILS/0/SD_ILS:7937452024-05-08T01:06:48Z2024-05-08T01:06:48Zby Izam Sharil Ibrahim<br/>Author Izam Sharil Ibrahim, Ahmad Rosdan Abdul Razak, supervisor, Mohd. Saidin Misnan, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 I93 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Constructing relationally integrated teams in Malaysiaent://SD_ILS/0/SD_ILS:7937002024-05-08T01:06:48Z2024-05-08T01:06:48Zby Tan Jian Siang, 1989-<br/>Author Tan Jian Siang, 1989-, Nur Emma Mustaffa, supervisor, Kherun Nita Ali, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 T36 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Application for stay of proceedings and unconditional appearanceent://SD_ILS/0/SD_ILS:7986102024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Fathel Laton<br/>Author Mohd. Fathel Laton, Jamaluddin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number KPG3760 M43 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Minor defects and practical completionent://SD_ILS/0/SD_ILS:7995922024-05-08T01:06:48Z2024-05-08T01:06:48Zby Fani Dhuha, 1983-<br/>Author Fani Dhuha, 1983-, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 F36 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan Kontrak)) - Universiti Teknologi Malaysia, 2012<br/>The relationship between general contractor and subcontractorent://SD_ILS/0/SD_ILS:7996072024-05-08T01:06:48Z2024-05-08T01:06:48Zby Heidi Duma, 1987-<br/>Author Heidi Duma, 1987-, Sarajul Fikri Mohamed, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA210 H45 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan Kontrak)) - Universiti Teknologi Malaysia, 2012<br/>Application for stay of proceedings and unconditional appearanceent://SD_ILS/0/SD_ILS:7997502024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Fathel Laton<br/>Author Mohd. Fathel Laton, Jamaluddin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number KPG3760 M64 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Kebolehpasaran lepasan belia CIBB dalam memenuhi keperluan industri pembinaanent://SD_ILS/0/SD_ILS:8057812024-05-08T01:06:48Z2024-05-08T01:06:48Zby Wan Ezril Wan Ibnurushdi, 1979-<br/>Author Wan Ezril Wan Ibnurushdi, 1979-, Mohd. Saidin Misnan, supervisor, Syamsul Hendra Mahmud, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 W49 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Construction foreign labour skill drainent://SD_ILS/0/SD_ILS:8064692024-05-08T01:06:48Z2024-05-08T01:06:48Zby Huda Mastura Hailuddin, 1983-<br/>Author Huda Mastura Hailuddin, 1983-, Aminah Md. Yusof, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA210 H83 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>The quality awareness of the construction workers in Malaysian construction industryent://SD_ILS/0/SD_ILS:8262942024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Fazli Mohamad, 1982-, author<br/>Author Mohd. Fazli Mohamad, 1982-, author, Mohamad Syazli Fathi, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(826294.1)<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>The arbitrable disputes in Malaysian construction industryent://SD_ILS/0/SD_ILS:7996822024-05-08T01:06:48Z2024-05-08T01:06:48Zby Tay, Joanna Yuan Ju, 1988-<br/>Author Tay, Joanna Yuan Ju, 1988-, Nur Emma Mustaffa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number K2400 T39 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Profiling of dispute resolution mechanisms in Asean countriesent://SD_ILS/0/SD_ILS:7997442024-05-08T01:06:48Z2024-05-08T01:06:48Zby Noor Akmaleena Md Daud, 1988-<br/>Author Noor Akmaleena Md Daud, 1988-, Nur Emma Mustaffa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number K891.B8 N66 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>The impact of economic recession on construction industry in Malaysiaent://SD_ILS/0/SD_ILS:7758232024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mostafa Hosseini, 1983-<br/>Author Mostafa Hosseini, 1983-, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA210 M67 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana (Sains Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>The practices of corporate social responsibility among construction companies in Malaysiaent://SD_ILS/0/SD_ILS:7908432024-05-08T01:06:48Z2024-05-08T01:06:48Zby Athira Abdullah, 1984-<br/>Author Athira Abdullah, 1984-, Abdul Rahim Abdul Hamid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD60 A84 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>The principle in assessing the quantum of acceleration claim for international projectsent://SD_ILS/0/SD_ILS:7984182024-05-08T01:06:48Z2024-05-08T01:06:48Zby Dedeng Jefri Athur, 1983-<br/>Author Dedeng Jefri Athur, 1983-, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number K840 D43 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Validity of late decision under construction industry payment and Adjudication Act 2012ent://SD_ILS/0/SD_ILS:7984282024-05-08T01:06:48Z2024-05-08T01:06:48Zby Leong, Siew Cheng, 1988-<br/>Author Leong, Siew Cheng, 1988-, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number K891.B8 L46 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Implementing lean production principles into the Nigerian construction industryent://SD_ILS/0/SD_ILS:7759312024-05-08T01:06:48Z2024-05-08T01:06:48Zby Olusegun, Adeyemo David, 1984-<br/>Author Olusegun, Adeyemo David, 1984-, Bachan Singh Besawa Jagar Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TS155 O48 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Industrialized building system survey in Yemenent://SD_ILS/0/SD_ILS:7759322024-05-08T01:06:48Z2024-05-08T01:06:48Zby AbdulWahab AbdulAziz Ali Asaad, 1987-<br/>Author AbdulWahab AbdulAziz Ali Asaad, 1987-, A. Aziz Saim, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH1000 A23 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2012<br/>Kajian perbandingan kos pembinaan antara sistem binaan berindustri secara acuan terowong dengan sistem konvensionalent://SD_ILS/0/SD_ILS:7767012024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nik Mohd. Iznan Tuan Yaakub, 1983-, author<br/>Author Nik Mohd. Iznan Tuan Yaakub, 1983-, author, Azhar Ahmad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715 N56 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur)) - Universiti Teknologi Malaysia, 2012<br/>Virtual design and construction (VDC) readiness among developersent://SD_ILS/0/SD_ILS:7935232024-05-08T01:06:48Z2024-05-08T01:06:48Zby Lee, Jia Hui, 1990-<br/>Author Lee, Jia Hui, 1990-, Kherun Nita Ali, supervisor, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 L443 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Pelaksanaan pengurusan nilai di dalam industri pembinaanent://SD_ILS/0/SD_ILS:7936632024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nur Izieadiana Abidin, 1989-<br/>Author Nur Izieadiana Abidin, 1989-, Ismail Haroni, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 N59 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Kecuaian profesional dalam industri pembinaanent://SD_ILS/0/SD_ILS:7936702024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Farid Omar, 1985-<br/>Author Mohd. Farid Omar, 1985-, Maizon Hashim, supervisor, Wan Yusof Wan Mahmood, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 M43 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Faktor-faktor kritikal kejayan projek pembinaan sektor swastaent://SD_ILS/0/SD_ILS:7936822024-05-08T01:06:48Z2024-05-08T01:06:48Zby Wan Faida Wan Mohd Azmi, 1988-<br/>Author Wan Faida Wan Mohd Azmi, 1988-, Mohd. Saidin Misnan, supervisor, Ismail Haron, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 W43 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Pengaruh rantai bekalan terhadap kecacatan dalam kerja pembinaanent://SD_ILS/0/SD_ILS:7936852024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nor Ridhwan Mohd. Tahir, 1990-<br/>Author Nor Ridhwan Mohd. Tahir, 1990-, Abdul Wahid Kamarulzaman, supervisor, Razali Adul Hanid , supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 N75 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>The relationship between construction resource management to costs and profits from the perspective of contractor companiesent://SD_ILS/0/SD_ILS:7937152024-05-08T01:06:48Z2024-05-08T01:06:48Zby Matheson Tuah Anak Norma, 1990-, author<br/>Author Matheson Tuah Anak Norma, 1990-, author, Fuziah Ismail, supervisor, Tantish Kamaruddin, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 M38 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Automated safety planning on construction siteent://SD_ILS/0/SD_ILS:7562262024-05-08T01:06:48Z2024-05-08T01:06:48Zby Samaneh Zolfagharian, 1983-<br/>Author Samaneh Zolfagharian, 1983-, Aziruddin Ressang, supervisor, Javier Irizarry, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 S26 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Critical success factors managing class F projects in Klang Valleyent://SD_ILS/0/SD_ILS:7660432024-05-08T01:06:48Z2024-05-08T01:06:48Zby Zulkaplee Jantan, 1970-<br/>Author Zulkaplee Jantan, 1970-, Mohamad Syazli Fathi, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA210 Z85 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Cost monitoring for construction works carried out by class F contractorsent://SD_ILS/0/SD_ILS:7651852024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ling, Grace Siew Jiuan, 1987-, author<br/>Author Ling, Grace Siew Jiuan, 1987-, author, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(765185.1)<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Tahap kesedaran pekerja pembinaan terhadap keselamatan dan kesihatan pekerjaan : kajian di tapak pembinaan sekitar Johor Bahruent://SD_ILS/0/SD_ILS:7721472024-05-08T01:06:48Z2024-05-08T01:06:48Zby Siti Nur Hidayah Hasan@ Abd Majid, author<br/>Author Siti Nur Hidayah Hasan@ Abd Majid, author, Ishak Mad Shah, supervisor, Herna Rusli, author, Elasaila Jaipil, author, Fakulti Pengurusan dan Pembangunan Sumber Manusia<br/>Format: Books<br/>Call Number HD7262 S58 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Sains (Pembangunan Sumber Manusia)) - Universiti Teknologi Malaysia, 2011<br/>Potensi pembangunan taman tema air di Pasir Gudangent://SD_ILS/0/SD_ILS:7732962024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohamad Syamsul Hadi Sablee, 1987-<br/>Author Mohamad Syamsul Hadi Sablee, 1987-, Harun Shah Mat Zin, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number HD9715 M64 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2011<br/>The effects of ISO 9000 quality management systems on project management performance in construction industryent://SD_ILS/0/SD_ILS:7762662024-05-08T01:06:48Z2024-05-08T01:06:48Zby Zahidy Abd. Hamid, 1962-<br/>Author Zahidy Abd. Hamid, 1962-, Sabariyah Din, supervisor, Muhd. Zaimi Abd. Majid, supervisor, Sekolah Razak UTM Dalam Kejuruteraan dan Teknologi Termaju<br/>Format: Books<br/>Call Number HD69.P75 Z34 2011 raf<br/>Publication Date 2011<br/>Thesis (Ph.D (Pengurusan Perniagaan Kejuruteraan)) - Universiti Teknologi Malaysia, 2011<br/>Comparative study of predicted and actual noise level at sensitive area nearby construction siteent://SD_ILS/0/SD_ILS:7733042024-05-08T01:06:48Z2024-05-08T01:06:48Zby Norhady M. Amin, 1982-<br/>Author Norhady M. Amin, 1982-, Mohd. Fadhil Md. Din, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA365 N675 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Kejuruteraan (Alam Sekitar)) - Universiti Teknologi Malaysia, 2011<br/>The strategy adopted by the Indonesian government contractors to maintain profitent://SD_ILS/0/SD_ILS:7753862024-05-08T01:06:48Z2024-05-08T01:06:48Zby Dwi Adi Sunarko, 1978-<br/>Author Dwi Adi Sunarko, 1978-, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA210 D95 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/>Kesan lebihan kos dari perspektif klienent://SD_ILS/0/SD_ILS:7774492024-05-08T01:06:48Z2024-05-08T01:06:48Zby Harold Sinti, 1988-, author<br/>Author Harold Sinti, 1988-, author, Nur Emma Mustaffa, supervisor, Syamsul Hendra Mahmud, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 H373 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2011<br/>Learning curve on construction worksent://SD_ILS/0/SD_ILS:7775452024-05-08T01:06:48Z2024-05-08T01:06:48Zby Kong, Khee Yang, 1987-<br/>Author Kong, Khee Yang, 1987-, Razali Adul Hamid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number T60.35 K66 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2011<br/>Perbandingan tembok penahan konkrit julur konvensional dengan bertingkatent://SD_ILS/0/SD_ILS:6905852024-05-08T01:06:48Z2024-05-08T01:06:48Zby Errwan Abdul Rashid, 1978-<br/>Author Errwan Abdul Rashid, 1978-, Arizu Sulaiman, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA770 E77 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2010<br/>Evaluation of construction equipment acquisition methods in Malayisan construction industryent://SD_ILS/0/SD_ILS:7298842024-05-08T01:06:48Z2024-05-08T01:06:48Zby Masoud Navazandeh Sajoudi, 1983-<br/>Author Masoud Navazandeh Sajoudi, 1983-, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.G38 M37 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Sudut geseran dalam pasir bercampur tanahent://SD_ILS/0/SD_ILS:6255522024-05-08T01:06:48Z2024-05-08T01:06:48Zby Faridzul Mohammad Fadzil, 1987-, author<br/>Author Faridzul Mohammad Fadzil, 1987-, author, Kamarudin Ahmad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(625552.1)<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Geoteknik)) - Universiti Teknologi Malaysia, 2010<br/>Construction site waste management approach in Universiti Teknologi Malaysiaent://SD_ILS/0/SD_ILS:6286142024-05-08T01:06:48Z2024-05-08T01:06:48Zby Chai, Welfred Khai Hung, 1986-<br/>Author Chai, Welfred Khai Hung, 1986-, Khairulzan Yahya, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA210 C43 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Binaan)) - Universiti Teknologi Malaysia, 2010<br/>Managing quality in the construction of formworkent://SD_ILS/0/SD_ILS:6286972024-05-08T01:06:48Z2024-05-08T01:06:48Zby Tan, Yaw Bin, 1986-<br/>Author Tan, Yaw Bin, 1986-, Aminah Md. Yusof, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA682.44 T369 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Binaan)) - Universiti Teknologi Malaysia, 2010<br/>Properties of porous concrete with palm oil fuel ash (POFA)ent://SD_ILS/0/SD_ILS:6301252024-05-08T01:06:48Z2024-05-08T01:06:48Zby Aizuddin Asghar Drahman, 1987-<br/>Author Aizuddin Asghar Drahman, 1987-, Muhammad Aamer Rafique Bhutta, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA439 A398 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2010<br/>Penggunaan penutup longkang dalam pembinaan : kajian kes tentang masalah dan kesesuaianent://SD_ILS/0/SD_ILS:6905062024-05-08T01:06:48Z2024-05-08T01:06:48Zby Azam Khalili Mohd. Khir, 1973-<br/>Author Azam Khalili Mohd. Khir, 1973-, Abdul Rahman Mohd. Sam, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TC970 A93 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2010<br/>Pengurusan risiko dalam projek pembinaan Politeknik Jelient://SD_ILS/0/SD_ILS:7292762024-05-08T01:06:48Z2024-05-08T01:06:48Zby Sumie Sarmiza Abd. Suki, 1977-, author<br/>Author Sumie Sarmiza Abd. Suki, 1977-, author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(729276.1)<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Binaan)) - Universiti Teknologi Malaysia, 2010<br/>The construction guideline of using top-down methodent://SD_ILS/0/SD_ILS:7292822024-05-08T01:06:48Z2024-05-08T01:06:48Zby Choo, Wei Keong, 1981-<br/>Author Choo, Wei Keong, 1981-, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH1098 C46 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Binaan)) - Universiti Teknologi Malaysia, 2010<br/>The potential adoption of relational contracting in Jabatan Kerja Raya Malaysiaent://SD_ILS/0/SD_ILS:7295042024-05-08T01:06:48Z2024-05-08T01:06:48Zby Noraisah Kadirin, 1968-<br/>Author Noraisah Kadirin, 1968-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA210 N684 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) – Universiti Teknologi Malaysia, 2010<br/>Improvement of project planning process to satisfy clients’ satisfaction in project implementationent://SD_ILS/0/SD_ILS:7295642024-05-08T01:06:48Z2024-05-08T01:06:48Zby Wan Norhayati Wan Abdul Ghani, 1962-<br/>Author Wan Norhayati Wan Abdul Ghani, 1962-, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA190 W56 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) – Universiti Teknologi Malaysia, 2010<br/>Pelaksanaan perjumpaan toolbox di tapak binaent://SD_ILS/0/SD_ILS:7305562024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Al Kausar Abdullah, 1987-<br/>Author Mohd. Al Kausar Abdullah, 1987-, Syamsul Hendra Mahmud, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA403.6 M35 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Kelewatan penghantaran bahan dan jentera binaan ke tapak binaent://SD_ILS/0/SD_ILS:7489532024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nurayuni Mazlan, 1987-, author<br/>Author Nurayuni Mazlan, 1987-, author, Syamsul Hendra Mahmud, supervisor, Roslan Amirudin, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438.15 N874 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/>Etika kerja kontraktor Kelas F dalam industri pembinaanent://SD_ILS/0/SD_ILS:7709172024-05-08T01:06:48Z2024-05-08T01:06:48Zby Badariah Saikhon, 1985-<br/>Author Badariah Saikhon, 1985-, Mohd. Rizal Mohd. Said, supervisor, Fakulti Pendidikan<br/>Format: Books<br/>Call Number HD4905 B33 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Pendidikan (Teknik dan Vokasional)) - Universiti Teknologi Malaysia, 2010<br/>Adjudicator determines own jurisdiction : a prediction for the proposed construction industry payment and adjudication actent://SD_ILS/0/SD_ILS:7590862024-05-08T01:06:48Z2024-05-08T01:06:48Zby Imran Mohd. Yusop 1985-<br/>Author Imran Mohd. Yusop 1985-, Jamaluddin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number K891.B8 I47 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Faktor-faktor kejayaan kritikal sistem pengurusan kualiti dalam firma kontraktorent://SD_ILS/0/SD_ILS:7775192024-05-08T01:06:48Z2024-05-08T01:06:48Zby Lim, Yong Ching , author<br/>Author Lim, Yong Ching , author, Razali Abdul Hamid, supervisor, Wan Yusoff Wan Mahmood, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD62.15 L563 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Pelaksanaan penandaarasan kualiti dalam industri pembinaanent://SD_ILS/0/SD_ILS:7775212024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Bakri Abd. Rahim, author<br/>Author Mohd. Bakri Abd. Rahim, author, Razali Abdul Hamid, supervisor, Ahmad Rosdan Abd. Razak, supervisor, Fakulti Alambina<br/>Format: Books<br/>Call Number HD9715.A2 M333 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/>Penilaian kebolehan inovatif dan hubungannya terhadap pembentukan strategi firmaent://SD_ILS/0/SD_ILS:3951502024-05-08T01:06:48Z2024-05-08T01:06:48Zby Noreen Azuana Mohd. Salleh<br/>Author Noreen Azuana Mohd. Salleh, Noraini Abu Talib, supervisor, Fakulti Pengurusan dan Pembangunan Sumber Manusia<br/>Format: Books<br/>Call Number HD9715 N675 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda (Pengurusan - Teknologi)) - Universiti Teknologi Malaysia, 2010<br/>Development of quantitative quality cost matrix for Malaysian construction quality management systement://SD_ILS/0/SD_ILS:3923492024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mukhtar Che Ali, 1958-<br/>Author Mukhtar Che Ali, 1958-, Rosli Mohamad Zin, supervisor, Zuhairi Abdul Hamid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD62.15 M84 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Perbandingan terhadap persepsi dalam pengurusan projek pembinaan antara sektor awam dan swastaent://SD_ILS/0/SD_ILS:3929832024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Fauzi Abu Bakar<br/>Author Mohd. Fauzi Abu Bakar, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA153 M64 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Binaan)) -Universiti Teknologi Malaysia,2010<br/>Kajian kecacatan dan tahap keselesaan dalaman rumah kos rendah sistem "Fast Track Wall"ent://SD_ILS/0/SD_ILS:3565482024-05-08T01:06:48Z2024-05-08T01:06:48Zby Zulhilmie Anwar<br/>Author Zulhilmie Anwar, Rozana Zakaria, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH880 Z85 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Mechanical properties of 10mm single-sized aggregates porous concrete with coconut fibreent://SD_ILS/0/SD_ILS:3574692024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mastura Md. Zahari, 1986-<br/>Author Mastura Md. Zahari, 1986-, Zaiton Haron, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA439 M37 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia,2009<br/>Cara pengurus projek pembinaan menangani stres di tempat kerjaent://SD_ILS/0/SD_ILS:3814372024-05-08T01:06:48Z2024-05-08T01:06:48Zby Azlinda Arzmi<br/>Author Azlinda Arzmi, Abdul Rahim Abdul Hamid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA210 A955 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Labour productivity : benchmarking on construction projectsent://SD_ILS/0/SD_ILS:3816432024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ng, Kim Hooi<br/>Author Ng, Kim Hooi, Razali Adul Hamid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD5548.8 N44 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Sains - Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Rekabentuk berkomputer tembok sisi jambatanent://SD_ILS/0/SD_ILS:3821682024-05-08T01:06:48Z2024-05-08T01:06:48Zby Rayhan Abu Talib<br/>Author Rayhan Abu Talib, Mohamad Salleh Yassin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TG300 R39 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Recoveries of differing site conditions in construction contractsent://SD_ILS/0/SD_ILS:6047332024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ong, Kuan Yuen, 1981-<br/>Author Ong, Kuan Yuen, 1981-, Jamaluddin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Computer file<br/>Call Number TH425 O53 2008 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Contractors's application of extension of time in PAM 1998ent://SD_ILS/0/SD_ILS:6283632024-05-08T01:06:48Z2024-05-08T01:06:48Zby Afisza Irfan Azmi<br/>Author Afisza Irfan Azmi, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH153 A35 2009 raf<br/>Publication Date 2009<br/>Thesis Sarjana Sains (Pengurusan Kontrak Pembinaan)-Universiti Teknologi Malaysia,2009<br/>Effect of noise from piling activities on studentsent://SD_ILS/0/SD_ILS:6256842024-05-08T01:06:48Z2024-05-08T01:06:48Zby Siti Nooraisyah Kamarul Zaman<br/>Author Siti Nooraisyah Kamarul Zaman, Zaiton Haron, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TD892 S58 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejurteraan (Awam)) - Universiti Teknologi Malaysia, 2009<br/>Pengurusan sisa bahan binaan di tapak binaent://SD_ILS/0/SD_ILS:3818602024-05-08T01:06:48Z2024-05-08T01:06:48Zby Norazeman Abd Ghani<br/>Author Norazeman Abd Ghani, Razali Adul Hamid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TD791 N676 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Kajian kos terhadap penggunaan bata berkunci dalam projek pembinaanent://SD_ILS/0/SD_ILS:3818942024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nurul Hidayah Muda<br/>Author Nurul Hidayah Muda, Mohd. Saidin Misnan, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH2243 N87 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Pencemaran bunyi dalam kerja pembinaanent://SD_ILS/0/SD_ILS:3818952024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Faisal Amaludin<br/>Author Mohd. Faisal Amaludin, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TD892 M424 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Sistem binaan berindustri (IBS)ent://SD_ILS/0/SD_ILS:3824682024-05-08T01:06:48Z2024-05-08T01:06:48Zby Siti Fatimah Abd. Razak<br/>Author Siti Fatimah Abd. Razak, Bachan Singh Besawa Jagar Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH443 S58 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Contractor's rights in the event of employer's insolvencyent://SD_ILS/0/SD_ILS:3996652024-05-08T01:06:48Z2024-05-08T01:06:48Zby Olivia Rayeg<br/>Author Olivia Rayeg, Jamaluddin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 O45 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Aspek rekabentuk bagi komponen sistem binaan berindustri (IBS)ent://SD_ILS/0/SD_ILS:3960892024-05-08T01:06:48Z2024-05-08T01:06:48Zby Suffian Buhari<br/>Author Suffian Buhari, Jamaludin Mohamad Yatim, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA656 S84 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2009<br/>Pengetahuan dan kemahiran kontraktor untuk menggunakan e-tenderent://SD_ILS/0/SD_ILS:3030152024-05-08T01:06:48Z2024-05-08T01:06:48Zby Noraireen Zakaria<br/>Author Noraireen Zakaria<br/>Format: Books<br/>Call Number TH438 N6744 2009<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/>Prestasi projek pembinaanent://SD_ILS/0/SD_ILS:3034972024-05-08T01:06:48Z2024-05-08T01:06:48Zby Kee, Cindy Li Lin<br/>Author Kee, Cindy Li Lin, Roslan Amirudin, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 C46 2009<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Kemahiran generik dalam faktor pemilihan jurutera mengikut perspektif industri pembinaanent://SD_ILS/0/SD_ILS:3523202024-05-08T01:06:48Z2024-05-08T01:06:48Zby Norrafidah Abd. Kadir, 1984-<br/>Author Norrafidah Abd. Kadir, 1984-, Mahyuddin Arsat, Fakulti Pendidikan<br/>Format: Books<br/>Call Number TA157 N67 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Teknologi serta Pendidikan (Kemahiran Hidup)) - Universiti Teknologi Malaysia, 2009<br/>Parametric study of steel grouted splice sleeve with integrated double springs under axial tensionent://SD_ILS/0/SD_ILS:3585312024-05-08T01:06:48Z2024-05-08T01:06:48Zby Goh, Hiang Miang<br/>Author Goh, Hiang Miang, Ahmad Baharuddin Abd. Rahman, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA439 G63 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Analisis kestabilan di kolam tadahan dan kaedah pembaikanent://SD_ILS/0/SD_ILS:3585682024-05-08T01:06:48Z2024-05-08T01:06:48Zby Dang Arfah Md. Taib<br/>Author Dang Arfah Md. Taib, Khairul Anuar Kassim, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA770 D36 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Geoteknik)) - Universiti Teknologi Malaysia,2009<br/>A critical investigation on the incorporation of IBS knowledge into the Polytechnic academic curriculument://SD_ILS/0/SD_ILS:3230692024-05-08T01:06:48Z2024-05-08T01:06:48Zby Erita Mazwin Mazlan, 1976-<br/>Author Erita Mazwin Mazlan, 1976-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 E74 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Strategi kontraktor memperolehi projekent://SD_ILS/0/SD_ILS:3030382024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mimi Salwani Samsudin<br/>Author Mimi Salwani Samsudin<br/>Format: Books<br/>Call Number TA210 M554 2009<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/>Factors affecting the contractor's mark - up size decision in Malaysiaent://SD_ILS/0/SD_ILS:3330552024-05-08T01:06:48Z2024-05-08T01:06:48Zby Tey, Kim Hai, 1985-<br/>Author Tey, Kim Hai, 1985-, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 T49 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Public participation Sustainable Development - Investigation of the level sustainable environmental development understanding and awarenessent://SD_ILS/0/SD_ILS:2264432024-05-08T01:06:48Z2024-05-08T01:06:48Zby Samsulkamal Sumiri<br/>Author Samsulkamal Sumiri, Rozana Zakaria<br/>Format: Books<br/>Call Number HC79.E5 S257 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/><a href="http://eprints.utm.my/6804">Full text thesis via UTM-IR</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Ramalan bunyi bising pembinaan pada peringkat perancanganent://SD_ILS/0/SD_ILS:2353902024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nor Hazlinda Md. Roduan<br/>Author Nor Hazlinda Md. Roduan, Zaiton Haron, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TD892 N67 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Alam Sekitar)) - Universiti Teknologi Malaysia, 2008<br/>Rekabentuk dalam teknologi sistem binaan berindustri (IBS)ent://SD_ILS/0/SD_ILS:2472832024-05-08T01:06:48Z2024-05-08T01:06:48Zby Noorhayati Shailina Muhamad<br/>Author Noorhayati Shailina Muhamad, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH1000 N66 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Menukar tempat kerja di kalangan juruukur bahan dalam industri binaanent://SD_ILS/0/SD_ILS:2473922024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nor Suhaidah Abdul Razak<br/>Author Nor Suhaidah Abdul Razak, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH437 N675 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Sains - Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Masalah dan kelebihan dalam penggunaan kaedah pembinaan berindustrient://SD_ILS/0/SD_ILS:2474442024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Hanafi Saat<br/>Author Mohd. Hanafi Saat, Roslan Amirudin, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH1000 M524 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Sains - Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Modelling of noise from construction siteent://SD_ILS/0/SD_ILS:2479642024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ting, Ding Kiat<br/>Author Ting, Ding Kiat, Zaiton Haron, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TD892 T56 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Strategi pemilihan buruh di tapak binaent://SD_ILS/0/SD_ILS:2531282024-05-08T01:06:48Z2024-05-08T01:06:48Zby Siti Nor Santi Mohd. Safawi<br/>Author Siti Nor Santi Mohd. Safawi, Norizan Mansor, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA210 S574 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Aplikasi prinsip pembinaan mampan dalam industri binaanent://SD_ILS/0/SD_ILS:2542312024-05-08T01:06:48Z2024-05-08T01:06:48Zby Siti Fatimah Maulub<br/>Author Siti Fatimah Maulub, Razali Adul Hamid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH880 S58 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Pemahaman dan penerimaan pembeli terhadap rumah berkonsepkan 'bina kemudian jual 10:90' di Malaysiaent://SD_ILS/0/SD_ILS:2549052024-05-08T01:06:48Z2024-05-08T01:06:48Zby Wong, Bi Xia<br/>Author Wong, Bi Xia, Syamsul Hendra Mahmud, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH4812 W664 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Joint venture in construction industryent://SD_ILS/0/SD_ILS:2549172024-05-08T01:06:48Z2024-05-08T01:06:48Zby Yu, Ling Zi<br/>Author Yu, Ling Zi, Syamsul Hendra Mahmud, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH153 Y84 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Penggunaan hamparan kerja (spread sheet) dalam rekabentuk sambungan keluli berasaskan eurocode 3(EC3)ent://SD_ILS/0/SD_ILS:2748592024-05-08T01:06:48Z2024-05-08T01:06:48Zby Siti Khadijah Mahmod<br/>Author Siti Khadijah Mahmod, Shahrin Mohammad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TS320 S58 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2008<br/>The challenges in international construction project with regard to safety compliance and cross cultural managementent://SD_ILS/0/SD_ILS:2937052024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nor Amin Mohd. Radzuan, 1974-<br/>Author Nor Amin Mohd. Radzuan, 1974-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715 A444 2008<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Force majeure in extension of timeent://SD_ILS/0/SD_ILS:3037762024-05-08T01:06:48Z2024-05-08T01:06:48Zby Kathleen Sanis, 1984-<br/>Author Kathleen Sanis, 1984-, Nur Emma Mustaffa, supervisor, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number K840 K37 2008<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>The liability of project director under the design and build procurement systement://SD_ILS/0/SD_ILS:3040202024-05-08T01:06:48Z2024-05-08T01:06:48Zby Yong, Leng Siew, 1984-<br/>Author Yong, Leng Siew, 1984-, Maizon Hashim, supervisor, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH425 Y664 2008 raf<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Mechanical properties of polymer modified concreteent://SD_ILS/0/SD_ILS:2408442024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ezalin Syalma Zaidan<br/>Author Ezalin Syalma Zaidan, Mohammad Ismail, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA443.P58 E93 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Kepuasan pembeli rumah terhadap penggunaan komponen IBS dalam pembinaan rumah kediamanent://SD_ILS/0/SD_ILS:2740222024-05-08T01:06:48Z2024-05-08T01:06:48Zby Halmeyah Muhamad Taib<br/>Author Halmeyah Muhamad Taib, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH4811 H35 2008 raf<br/>Publication Date 2008<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=59653">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Effects of geometric parameters of TWP section on the buckling under momentent://SD_ILS/0/SD_ILS:2747022024-05-08T01:06:48Z2024-05-08T01:06:48Zby Tan, Wai Hoong<br/>Author Tan, Wai Hoong, Arizu Sulaiman, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA347.F5 T36 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Penerimaan pemaju rumah terhadap penggunaan komponen sistem binaan berindustri (IBS) dalam pembinaan rumah kediamanent://SD_ILS/0/SD_ILS:2748272024-05-08T01:06:48Z2024-05-08T01:06:48Zby Siti Nur Zulaikha Mohamad Rasid<br/>Author Siti Nur Zulaikha Mohamad Rasid, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH375 S58 2008 raf<br/>Publication Date 2008<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=59674">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Pengakreditasian pekerja mahir sektor binaanent://SD_ILS/0/SD_ILS:2926402024-05-08T01:06:48Z2024-05-08T01:06:48Zby Anis Mardiah Mukhtar<br/>Author Anis Mardiah Mukhtar<br/>Format: Books<br/>Call Number HD57 A54 2008<br/>Publisher Universiti Teknologi Malaysia<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti teknologi Malaysia, 2008<br/>Perlaksanaan konsep 3'R' dalam pengurusan sisa binaan di tapak binaent://SD_ILS/0/SD_ILS:2931552024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Asrul Hasbullah<br/>Author Mohd. Asrul Hasbullah, Ismail Haron, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TD195.W295 M37 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Risk analysis of housing projects in Malaysia using an industrialised building systement://SD_ILS/0/SD_ILS:3245652024-05-08T01:06:48Z2024-05-08T01:06:48Zby Saiful Azri Abu Hasan Sazalli<br/>Author Saiful Azri Abu Hasan Sazalli<br/>Format: Books<br/>Call Number TH1000 S253 2008 raf<br/>Publication Date 2008<br/>Thesis (Sarjana Sains) - Universiti Putra Malaysia, 2008<br/>PFI as the key to infrastructure development in Nigeriaent://SD_ILS/0/SD_ILS:3037962024-05-08T01:06:48Z2024-05-08T01:06:48Zby Olorunkiya Joshua Olutayo<br/>Author Olorunkiya Joshua Olutayo, Fadhlin Abdullah, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 O46 2008<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Perlaksanaan pengurusan berkonsepkan Just - In - Time (JIT) di dalam sistem pasang siapent://SD_ILS/0/SD_ILS:2086692024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nor Aini Md. Nasir<br/>Author Nor Aini Md. Nasir, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TS157.4 N67 2007 raf<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2007<br/>Perubahan kerja dan faktor-faktor yang mempengaruhinyaent://SD_ILS/0/SD_ILS:2298412024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohamed Khairul Azwar Sudin<br/>Author Mohamed Khairul Azwar Sudin<br/>Format: Books<br/>Call Number TH438 M534 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>The effect to the termination of letter of intent in construction contractent://SD_ILS/0/SD_ILS:1984422024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohamad Zaidi Mohamed Saad<br/>Author Mohamad Zaidi Mohamed Saad<br/>Format: Books<br/>Call Number TH 425 M924 2007<br/>Publication Date 2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Persepsi rasuah dalam industri binaanent://SD_ILS/0/SD_ILS:2111172024-05-08T01:06:48Z2024-05-08T01:06:48Zby Musliadi Mustala<br/>Author Musliadi Mustala, Norizan Mansor, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 M875 2007 raf<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2007<br/>Analisis dan rekabentuk rasuk julur konkrit bertetulang keratan 'T' songsang dengan menggunakan helaian Excelent://SD_ILS/0/SD_ILS:1466932024-05-08T01:06:48Z2024-05-08T01:06:48Zby Zikri Tahrim<br/>Author Zikri Tahrim, Azhar Ahmad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA683.5.B3 Z55 2007 raf<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2007<br/>Building information modelling and structural analysis of precast high - rise buildingent://SD_ILS/0/SD_ILS:1468892024-05-08T01:06:48Z2024-05-08T01:06:48Zby Lee, Jiang Jun<br/>Author Lee, Jiang Jun, Abd. Latif Saleh, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number T58.5 L43 2007 raf<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2007<br/>Tekanan kerja dikalangan juruukur bahan peringkat pertengahan kerjayaent://SD_ILS/0/SD_ILS:1481732024-05-08T01:06:48Z2024-05-08T01:06:48Zby Radhiyah Yusoff<br/>Author Radhiyah Yusoff<br/>Format: Books<br/>Call Number HF5548. 85 R324 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Letter of intent and standard form of builiding contractent://SD_ILS/0/SD_ILS:1490182024-05-08T01:06:48Z2024-05-08T01:06:48Zby Hamizah Liyana Tajul Ariffin<br/>Author Hamizah Liyana Tajul Ariffin<br/>Format: Books<br/>Call Number TH153 H35 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Kefahaman dan inisiatif kontraktor dalam pelaksanaan sistem pembinaan berindustri (IBS)ent://SD_ILS/0/SD_ILS:1496622024-05-08T01:06:48Z2024-05-08T01:06:48Zby Tang, Lee Choon<br/>Author Tang, Lee Choon<br/>Format: Books<br/>Call Number TA210 T364 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Pelan kualiti projekent://SD_ILS/0/SD_ILS:1505972024-05-08T01:06:48Z2024-05-08T01:06:48Zby Azlan Suhimi<br/>Author Azlan Suhimi, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TS156.8 A95 2007 raf<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2007<br/>Aspek kualiti dalam pembinaan bangunan menggunakan konkrit pra - tuangent://SD_ILS/0/SD_ILS:1506022024-05-08T01:06:48Z2024-05-08T01:06:48Zby Azrul Hafizal Mahadi<br/>Author Azrul Hafizal Mahadi, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA683.7 A97 2007 raf<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2007<br/>Penilaian peserta program kursus induksi pekerja asing dalam sektor pembinaanent://SD_ILS/0/SD_ILS:1544152024-05-08T01:06:48Z2024-05-08T01:06:48Zby Muhammad Noor Kamil Suroto<br/>Author Muhammad Noor Kamil Suroto<br/>Format: Books<br/>Call Number HD8700.6 M66 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Aspek-aspek yang mempengaruhi keputusan klien dalam menggunakan sistem pembinaan berindustri (IBS)ent://SD_ILS/0/SD_ILS:1544272024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nik Farah Esma Haslan<br/>Author Nik Farah Esma Haslan<br/>Format: Books<br/>Call Number TH1000 N54 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Decision support system framework for feasibility study in construction projectent://SD_ILS/0/SD_ILS:1552192024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nurjuliana Mohd. Nazari<br/>Author Nurjuliana Mohd. Nazari<br/>Format: Books<br/>Call Number HD30.213 N874 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=48907">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Fakulti Kejuruteraan Awam, Universiti Teknologi Malaysia, 2007<br/>Kecacatan ke atas bangunan semasa tempoh tanggungan kecacatan : kajian kes : daerah Petaling Jaya, Selangorent://SD_ILS/0/SD_ILS:1571352024-05-08T01:06:48Z2024-05-08T01:06:48Zby Manas Yusof<br/>Author Manas Yusof, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH153 M36 2007 raf<br/>Publication Date 2007<br/>Project paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2007<br/>Delay in authority's approval property development in Seremban, Negeri Sembilanent://SD_ILS/0/SD_ILS:1594742024-05-08T01:06:48Z2024-05-08T01:06:48Zby Hong, Fon Nah<br/>Author Hong, Fon Nah<br/>Format: Books<br/>Call Number HD9715.A2 H66 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Thesis (Sarjana Sains PPentadbiran dan Pembangunan Tanah) - Universiti Teknologi Malaysia, 2007<br/>Kajian perkembangan kekuatan mampatan konkrit menggunakan mortar terubahsuai polimerent://SD_ILS/0/SD_ILS:1435622024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohamad Syaifullah Budiman<br/>Author Mohamad Syaifullah Budiman, Mohammad Ismail, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA443.P58 M66 2007 raf<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2007<br/>Analisis dan rekabentuk rasuk julur konkrit bertetulang bagi keratan 'n' dengan menggunakan helaian excelent://SD_ILS/0/SD_ILS:1466882024-05-08T01:06:48Z2024-05-08T01:06:48Zby Zairen Idris<br/>Author Zairen Idris, Azhar Ahmad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA683.5.B3 Z35 2007 raf<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2007<br/>Kejadian tanah runtuh dikawasan pembinaan tanah tinggient://SD_ILS/0/SD_ILS:1468272024-05-08T01:06:48Z2024-05-08T01:06:48Zby Norfatiha Hamzani<br/>Author Norfatiha Hamzani<br/>Format: Books<br/>Call Number QE599 A2 N674 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Pengurusan kerja cerucuk dalam pembinaanent://SD_ILS/0/SD_ILS:1470122024-05-08T01:06:48Z2024-05-08T01:06:48Zby Suriana Yussof<br/>Author Suriana Yussof<br/>Format: Books<br/>Call Number TA780 S97 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Pengambilalihan projek-projek pendidikan terbengkalai kendalian JKRent://SD_ILS/0/SD_ILS:1476332024-05-08T01:06:48Z2024-05-08T01:06:48Zby Norazizah Bolong<br/>Author Norazizah Bolong<br/>Format: Books<br/>Call Number HD1394 N675 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Penyediaan kemudahan buruh ditapak binaent://SD_ILS/0/SD_ILS:1480462024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nur Nizrin Md. Sobari<br/>Author Nur Nizrin Md. Sobari<br/>Format: Books<br/>Call Number HD4901 N87 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Kaedah-kaedah analisis kelewatan dan penggunaannya dalam industri pembinaanent://SD_ILS/0/SD_ILS:1493762024-05-08T01:06:48Z2024-05-08T01:06:48Zby Wan Noor Solehha Wan Nik<br/>Author Wan Noor Solehha Wan Nik<br/>Format: Books<br/>Call Number TH425 W36 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Kriteria penggunaan IBS-maklum balas syarikat kontraktorent://SD_ILS/0/SD_ILS:1502572024-05-08T01:06:48Z2024-05-08T01:06:48Zby Siow, Kian Vee<br/>Author Siow, Kian Vee<br/>Format: Books<br/>Call Number TA210 S56 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Kajian terhadap penggunaan semula bahan buangan binaan oleh kontraktor pembinaanent://SD_ILS/0/SD_ILS:1506422024-05-08T01:06:48Z2024-05-08T01:06:48Zby Azmin Borkhan<br/>Author Azmin Borkhan<br/>Format: Books<br/>Call Number TA403 A95 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Extension of time and acceleration claimsent://SD_ILS/0/SD_ILS:1108272024-05-08T01:06:48Z2024-05-08T01:06:48Zby Oon, Soon Lee Dennis<br/>Author Oon, Soon Lee Dennis<br/>Format: Books<br/>Call Number K840.O56 2006 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=48046">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/>Effect of work programme in extension of time entitlementent://SD_ILS/0/SD_ILS:1113222024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nor Jalilah Idris<br/>Author Nor Jalilah Idris<br/>Format: Books<br/>Call Number K840 N67 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=37570">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/>Construction site safety : legal issues of liability for various partiesent://SD_ILS/0/SD_ILS:1115572024-05-08T01:06:48Z2024-05-08T01:06:48Zby Shim, Mong Heng<br/>Author Shim, Mong Heng<br/>Format: Books<br/>Call Number TH9705.S54 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/><a href="http://eprints.utm.my/2142">Full text thesis via UTM-IR</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Binaan)) - Universiti Teknologi Malaysia, 2006<br/>Amalan kaedah anggaran konsep di industri pembinaanent://SD_ILS/0/SD_ILS:1192522024-05-08T01:06:48Z2024-05-08T01:06:48Zby Chong, Heap Yih<br/>Author Chong, Heap Yih<br/>Format: Books<br/>Call Number TH435 C56 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/>Aplikasi prinsip - prinsip pembinaan mapan di dalam industri binaanent://SD_ILS/0/SD_ILS:1192912024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mardiana Mohamad<br/>Author Mardiana Mohamad<br/>Format: Books<br/>Call Number TH880 M37 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Jenayah-jenayah yang dilakukan oleh buruh asing ditapak binaent://SD_ILS/0/SD_ILS:1220952024-05-08T01:06:48Z2024-05-08T01:06:48Zby Roslan Johari<br/>Author Roslan Johari<br/>Format: Books<br/>Call Number HV6025 R67 2006 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Pemasaran berasaskan hubungan : tinjauan ke atas firma-firma ukur bahanent://SD_ILS/0/SD_ILS:1221002024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Nor Ismail<br/>Author Mohd. Nor Ismail<br/>Format: Books<br/>Call Number HF5415 M66 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Kebolehbinaan : masalah-masalah berkaitan perincian rekabentukent://SD_ILS/0/SD_ILS:1134662024-05-08T01:06:48Z2024-05-08T01:06:48Zby Abd. Rahman Othman<br/>Author Abd. Rahman Othman<br/>Format: Books<br/>Call Number TH153 A72 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/>Kos kemalangan dalam industri pembinaanent://SD_ILS/0/SD_ILS:1199702024-05-08T01:06:48Z2024-05-08T01:06:48Zby Liang, Peck Kuan<br/>Author Liang, Peck Kuan<br/>Format: Books<br/>Call Number T55 L52 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/>Liberalisasi perdagangan perkhidmatan : klasifikasi produk pusat (CPC)ent://SD_ILS/0/SD_ILS:4701562024-05-08T01:06:48Z2024-05-08T01:06:48Zby Hasniza Abdul Razak @ Abdul Ghani<br/>Author Hasniza Abdul Razak @ Abdul Ghani<br/>Format: Books<br/>Call Number TH437 H374 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Insentif pengecualian levi yang dikenakan oleh CIDB bagi penggunaan IBS: pendapat pemaju tempatanent://SD_ILS/0/SD_ILS:4701682024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Nardzri Mastuki<br/>Author Mohd. Nardzri Mastuki<br/>Format: Books<br/>Call Number TH1000 M52 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Pertumbuhan industri pembinaan Malaysia dan perbandingan industri pembinaan antara negara maju dan negara sedang membangunent://SD_ILS/0/SD_ILS:4709722024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nalina Devi Balakrishnan<br/>Author Nalina Devi Balakrishnan<br/>Format: Books<br/>Call Number TH438 N344 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Konsep bina dan jual 10:90 dalam sektor perumahanent://SD_ILS/0/SD_ILS:4720432024-05-08T01:06:48Z2024-05-08T01:06:48Zby Oon, Swee Mei<br/>Author Oon, Swee Mei, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH4812 O56 2006 raf<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda (Sains - Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/>Penjagaan dan perlindungan bahan binaan di tapak binaent://SD_ILS/0/SD_ILS:4719972024-05-08T01:06:48Z2024-05-08T01:06:48Zby Wong, Chun Siong<br/>Author Wong, Chun Siong<br/>Format: Books<br/>Call Number TA401 W66 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/>Determination of contract by employer in construction industryent://SD_ILS/0/SD_ILS:1115142024-05-08T01:06:48Z2024-05-08T01:06:48Zby Tay, Lee Yong<br/>Author Tay, Lee Yong<br/>Format: Books<br/>Call Number TH438 T394 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=47794">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/>Aplikasi I-Supervision dalam industri binaanent://SD_ILS/0/SD_ILS:1167402024-05-08T01:06:48Z2024-05-08T01:06:48Zby Sawdia Rumainur<br/>Author Sawdia Rumainur<br/>Format: Books<br/>Call Number HD9715 A2 S28 2006 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Kesan pemindahan teknologi luar terhadap aspek reka bentuk dan pengurusan ahli profesionalent://SD_ILS/0/SD_ILS:1289082024-05-08T01:06:48Z2024-05-08T01:06:48Zby Syaziyyah Abdul Khairid<br/>Author Syaziyyah Abdul Khairid<br/>Format: Books<br/>Call Number T174.3 S92 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Penggunaan komponen binaan berindustri - pilihan pemaju perumahan sama ada menggunakan 50 peratus komponen sistem binaan berindustri atau bayar levi CIDBent://SD_ILS/0/SD_ILS:1290282024-05-08T01:06:48Z2024-05-08T01:06:48Zby Norizah Ismail<br/>Author Norizah Ismail<br/>Format: Books<br/>Call Number TA403 N67 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Manpower needs in construction industry : foreign labour issues and implicationsent://SD_ILS/0/SD_ILS:4108892024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ling, Sok Ping<br/>Author Ling, Sok Ping<br/>Format: Books<br/>Call Number HD9715.A2 L564 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Extension of time : the issue of delay notificationent://SD_ILS/0/SD_ILS:4239112024-05-08T01:06:48Z2024-05-08T01:06:48Zby Chin, Sze Nee<br/>Author Chin, Sze Nee<br/>Format: Books<br/>Call Number K840 C54 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Construction partnering : legal and contractual issueent://SD_ILS/0/SD_ILS:4239232024-05-08T01:06:48Z2024-05-08T01:06:48Zby Yeap, Chu Im<br/>Author Yeap, Chu Im<br/>Format: Books<br/>Call Number HD9715 .A2 Y42 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Perpindahan kerja jurukur bahan di firma perunding ukur bahanent://SD_ILS/0/SD_ILS:4506952024-05-08T01:06:48Z2024-05-08T01:06:48Zby Sharina Abdullah<br/>Author Sharina Abdullah<br/>Format: Books<br/>Call Number TH437 S52 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2005<br/>Construction productivity : issues encountered by contractors in Johorent://SD_ILS/0/SD_ILS:4121332024-05-08T01:06:48Z2024-05-08T01:06:48Zby Rubiatun Adawiah Ali<br/>Author Rubiatun Adawiah Ali<br/>Format: Books<br/>Call Number TH438 R82 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Masalah - masalah dalam pembinaan secara berindustri di Malaysiaent://SD_ILS/0/SD_ILS:4475222024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nally Haineen Harun<br/>Author Nally Haineen Harun<br/>Format: Books<br/>Call Number TH1000 N344 2004<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Project Paper (Sarjana Muda Sains (Bangunan)) - Universiti Teknologi Malaysia, 2004<br/>Kajian ke atas kekurangan penawaran buruh mahir tempatan dalam industri binaan di Johor Baharuent://SD_ILS/0/SD_ILS:3987222024-05-08T01:06:48Z2024-05-08T01:06:48Zby Muhammad Ubaidillah Ismail<br/>Author Muhammad Ubaidillah Ismail<br/>Format: Books<br/>Call Number HD8039.B9 M82 2004<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Project Paper (Sarjana Muda Sains (Pengurusan Harta tanah))- Universiti Teknologi Malaysia, 2004<br/>Usahasama firma-firma ukur bahan dalam perlaksanaan projek pembinaanent://SD_ILS/0/SD_ILS:3724062024-05-08T01:06:48Z2024-05-08T01:06:48Zby Umi Hani Zainal<br/>Author Umi Hani Zainal<br/>Format: Books<br/>Call Number TH437 U44 2004<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2004<br/>Kontraktor pembinaan yang berjaya dan berdaya saingent://SD_ILS/0/SD_ILS:1118292024-05-08T01:06:48Z2024-05-08T01:06:48Zby Bazli Azmi<br/>Author Bazli Azmi<br/>Format: Books<br/>Call Number TH438 B39 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Project Paper (Sarjana Muda Sains (Bangunan)) - Universiti Teknologi Malaysia, 2003<br/>Kaedah pemastian kualiti kerja ditapak binaent://SD_ILS/0/SD_ILS:1211452024-05-08T01:06:48Z2024-05-08T01:06:48Zby Rosni Ahmad<br/>Author Rosni Ahmad<br/>Format: Books<br/>Call Number HD62.15 R67 2003 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2003<br/>Analisis punca pengambilan pekerja dan pusing ganti pekerja dalam industri binaanent://SD_ILS/0/SD_ILS:1301742024-05-08T01:06:48Z2024-05-08T01:06:48Zby Norhayati Arifin<br/>Author Norhayati Arifin<br/>Format: Books<br/>Call Number HD4901 N67 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2003<br/>Information exchange in construction industryent://SD_ILS/0/SD_ILS:3591312024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nor Azlinda Mohamed Sabli<br/>Author Nor Azlinda Mohamed Sabli<br/>Format: Books<br/>Call Number TH438 N394 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Thesis (Master of Science (Construction Management)) - Universiti Teknologi Malaysia, 2003<br/>Problems faced by local sub-contractor in public worksent://SD_ILS/0/SD_ILS:3591332024-05-08T01:06:48Z2024-05-08T01:06:48Zby Goh, Shu Wei<br/>Author Goh, Shu Wei<br/>Format: Books<br/>Call Number TA210 G63 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Thesis (Master of Science (Construction Management)) - Universiti Teknologi Malaysia, 2003<br/>Penggunaan acuan konkrit bersistem dalam pembinaan bangunan tinggi : kajian kesent://SD_ILS/0/SD_ILS:3471362024-05-08T01:06:48Z2024-05-08T01:06:48Zby Chin, Yee Yung @ Nelson Chin<br/>Author Chin, Yee Yung @ Nelson Chin<br/>Format: Books<br/>Call Number TA682.44 C45 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2003<br/>Penggunaan panel ringan dalam industri binaanent://SD_ILS/0/SD_ILS:1164962024-05-08T01:06:48Z2024-05-08T01:06:48Zby Hisham Mohamad<br/>Author Hisham Mohamad<br/>Format: Books<br/>Call Number HD9715 .A2 H57 2002 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Project Paper (Sarjana Muda Sains (Pembinaaan)) - Universiti Teknologi Malaysia, 2002<br/>Kaedah perhitungan masa dan peruntukan sumber manusia oleh sub-kontraktor dalam projek binaanent://SD_ILS/0/SD_ILS:1133892024-05-08T01:06:48Z2024-05-08T01:06:48Zby Navamani Anthonisami<br/>Author Navamani Anthonisami<br/>Format: Books<br/>Call Number TH438 N38 2002 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2002<br/>Kajian terhadap kaedah kerjasama berpasukan (collaborative teamwork) didalam industri pembinaanent://SD_ILS/0/SD_ILS:3080212024-05-08T01:06:48Z2024-05-08T01:06:48Zby Noor Azizah Ibrahim<br/>Author Noor Azizah Ibrahim<br/>Format: Books<br/>Call Number HD66 N66 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Tesis (Sarjana Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Tahap kemahiran asas binaan bangunan yang diperolehi oleh pekerja warganegara asing berdasarkan dengan matlamat kursus binaan bangunan di sekolah menengah vokasionalent://SD_ILS/0/SD_ILS:3105452024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Shukri Bidin<br/>Author Mohd. Shukri Bidin<br/>Format: Books<br/>Call Number LC1044 M78 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Kertas Projek (Sarjana Muda Teknologi Serta Pendidikan (Kejuruteraan Elektrik)) - Universiti Teknologi Malaysia, 2002<br/>Artificial intelligence (AI) support for knowledge management in constructionent://SD_ILS/0/SD_ILS:3196292024-05-08T01:06:48Z2024-05-08T01:06:48Zby Sarajul Fikri Mohamed<br/>Author Sarajul Fikri Mohamed<br/>Format: Books<br/>Call Number HD9715.A2 S27 2002 raf<br/>Publisher Loughborough University,<br/>Publication Date 2002<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=42400">Preview</a><br/>Thesis (Master of Science in Construction Innovation and Management) - Loughborough University, 2002<br/>Analisis faktor-faktor yang mempengaruhi perbezaan harga tenderent://SD_ILS/0/SD_ILS:3238522024-05-08T01:06:48Z2024-05-08T01:06:48Zby Rafiza Mohamed<br/>Author Rafiza Mohamed<br/>Format: Books<br/>Call Number TH438 R334 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Tesis (Sarjana Sains (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2002<br/>Skim keselamatan sosial PERKESO : peranan dan fungsinya sebagai kaedah pengurusan risiko dalam industri pembinaan Malaysiaent://SD_ILS/0/SD_ILS:3238552024-05-08T01:06:48Z2024-05-08T01:06:48Zby Koh, Ming Li<br/>Author Koh, Ming Li<br/>Format: Books<br/>Call Number HD7222.6 K63 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Tesis (Sarjana Kejuruteraan (Pengurusan dan Pembinaan (Awam)) - Universiti Teknologi Malaysia, 2002<br/>Improving reporting system in construction industry using ITent://SD_ILS/0/SD_ILS:3238992024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ngu, Heng Hoo<br/>Author Ngu, Heng Hoo<br/>Format: Books<br/>Call Number TH145 N48 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Thesis (Master of Engineering (Construction and Management)) - Universiti Teknologi Malaysia, 2002<br/>Kajian hak pekerja di tapak bina mengikut peruntukan undang-undangent://SD_ILS/0/SD_ILS:3241812024-05-08T01:06:48Z2024-05-08T01:06:48Zby Yusmady Md. Junus<br/>Author Yusmady Md. Junus<br/>Format: Books<br/>Call Number HD7932.6 Y87 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Tesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2002<br/>On-line survey on current trends in it for local construction industryent://SD_ILS/0/SD_ILS:3238402024-05-08T01:06:48Z2024-05-08T01:06:48Zby Yeo, Khee Seng<br/>Author Yeo, Khee Seng<br/>Format: Books<br/>Call Number HD9715 Y46 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Thesis (Master of Engineering (Construction and Management (Civil)) - Universiti Teknologi Malaysia, 2002<br/>Pengurusan risiko dalam industri pembinaanent://SD_ILS/0/SD_ILS:3256992024-05-08T01:06:48Z2024-05-08T01:06:48Zby Nor Aslizah Mohd Jasmin<br/>Author Nor Aslizah Mohd Jasmin<br/>Format: Books<br/>Call Number HD9715 N37 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Kaedah reka dan bina kriteria pemilihan, pengukuran kejayaan dan faktor -fakfor penghalang keberkesanan sebagai tatacara kontrakent://SD_ILS/0/SD_ILS:3067802024-05-08T01:06:48Z2024-05-08T01:06:48Zby Neza Ismail<br/>Author Neza Ismail<br/>Format: Books<br/>Call Number TH153 N49 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Kecuaian profesional : peranan insurans indemniti profesional dalam industri pembinaanent://SD_ILS/0/SD_ILS:3080422024-05-08T01:06:48Z2024-05-08T01:06:48Zby Bong, Shirley Hui Ching<br/>Author Bong, Shirley Hui Ching<br/>Format: Books<br/>Call Number TH438 B66 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Tesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2002<br/>Sistem pengurusan "Turnkey" dalam sektor pembinaan di Malaysiaent://SD_ILS/0/SD_ILS:1692392024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ganesan Sebrenmani<br/>Author Ganesan Sebrenmani<br/>Format: Books<br/>Call Number HD9715 G36 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Kertas projek (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2001<br/>Kelicinan perjalanan projek pembinaan : satu kajian kesent://SD_ILS/0/SD_ILS:1221692024-05-08T01:06:48Z2024-05-08T01:06:48Zby Shaharuddin Ibrahim<br/>Author Shaharuddin Ibrahim<br/>Format: Books<br/>Call Number TH438 S524 2001 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2001<br/>Risiko projek pembinaan - perpindahan melalui kaedah pengendalian kontrakent://SD_ILS/0/SD_ILS:1609622024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ahmad Fitri Md. Noor<br/>Author Ahmad Fitri Md. Noor<br/>Format: Books<br/>Call Number TH145 A37 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia/ATMA, 2001<br/>Analysis of factors of non-excusable delays that influence contractors' performanceent://SD_ILS/0/SD_ILS:1613272024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ng, Weng Seng<br/>Author Ng, Weng Seng<br/>Format: Books<br/>Call Number TH438 N38 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Thesis (Master of Science (Construction Management)) - Universiti Teknologi Malaysia, 2001<br/>Organisasi usahasama dalam industri pembinaanent://SD_ILS/0/SD_ILS:1618192024-05-08T01:06:48Z2024-05-08T01:06:48Zby Gan, Kok Leong<br/>Author Gan, Kok Leong<br/>Format: Books<br/>Call Number TH153 G36 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam (Pengurusan dan Pembinaan)) - Universiti Teknologi Malaysia, 2001<br/>Industri pembinaan di era baru : trend penggunaan struktur kelulient://SD_ILS/0/SD_ILS:1618832024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ng, Adeline Ling Ying<br/>Author Ng, Adeline Ling Ying<br/>Format: Books<br/>Call Number TH1611 N43 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Analisa perkembangan industri binaan Malaysia : analisa kitaran komponen komersil industri binaanent://SD_ILS/0/SD_ILS:1620142024-05-08T01:06:48Z2024-05-08T01:06:48Zby Lo, Khin Kiong<br/>Author Lo, Khin Kiong<br/>Format: Books<br/>Call Number HD9715 L64 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Peranan perumahan dalam industri binaanent://SD_ILS/0/SD_ILS:1630682024-05-08T01:06:48Z2024-05-08T01:06:48Zby Wong, Pui Choy<br/>Author Wong, Pui Choy<br/>Format: Books<br/>Call Number TH4812 W66 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Masalah komunikasi dalam pengurusan projek pembinaanent://SD_ILS/0/SD_ILS:2989182024-05-08T01:06:48Z2024-05-08T01:06:48Zby Rozana Zakaria<br/>Author Rozana Zakaria<br/>Format: Books<br/>Call Number TH438 R69 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Tesis (Sarjana Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2001<br/>Pengurusan berkesan di tapak binaent://SD_ILS/0/SD_ILS:3006082024-05-08T01:06:48Z2024-05-08T01:06:48Zby Sahbuddin Jamudin<br/>Author Sahbuddin Jamudin<br/>Format: Books<br/>Call Number TH145 S23 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Identifying and measuring of factors affecting labour productivity for brickwork on construction site in Malaysiaent://SD_ILS/0/SD_ILS:2989032024-05-08T01:06:48Z2024-05-08T01:06:48Zby Chin, Kuie Too<br/>Author Chin, Kuie Too<br/>Format: Books<br/>Call Number TH438 C564 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Thesis (Master of Science (Construction Management)) - Universiti Teknologi Malaysia, 2001<br/>Reviewing the construction process using business process reengineering philosophyent://SD_ILS/0/SD_ILS:2989092024-05-08T01:06:48Z2024-05-08T01:06:48Zby Anthony Martin<br/>Author Anthony Martin<br/>Format: Books<br/>Call Number TH145 A57 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Thesis (Master of Science (Construction Management)) - Universiti Teknologi Malaysia, 2001<br/>Kajian kes mengenai prestasi kontrak kelas A dalam industri pembinaanent://SD_ILS/0/SD_ILS:3003722024-05-08T01:06:48Z2024-05-08T01:06:48Zby Faridah Suratmin<br/>Author Faridah Suratmin<br/>Format: Books<br/>Call Number TA210 F37 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Kajian ke atas proses-proses mesyuarat tapak bina dan implikasinya terhadap prestasi projek binaanent://SD_ILS/0/SD_ILS:1097892024-05-08T01:06:48Z2024-05-08T01:06:48Zby Zaimah Mohd<br/>Author Zaimah Mohd<br/>Format: Books<br/>Call Number HF5718.Z34 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/>Perancangan kontraktor memasuki tapak binaent://SD_ILS/0/SD_ILS:1106322024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mokhtar Md. Zain<br/>Author Mokhtar Md. Zain<br/>Format: Books<br/>Call Number TH438 M64 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/>Kesesuaian tempoh siap dengan kemampuan kontraktor yang dipilihent://SD_ILS/0/SD_ILS:1118262024-05-08T01:06:48Z2024-05-08T01:06:48Zby Salina Abd. Wahab<br/>Author Salina Abd. Wahab<br/>Format: Books<br/>Call Number TH438 S244 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/>Proses pengurusan kerja struktur keluli dalam projek pembinaanent://SD_ILS/0/SD_ILS:1547732024-05-08T01:06:48Z2024-05-08T01:06:48Zby Chong, Kok Boon<br/>Author Chong, Kok Boon<br/>Format: Books<br/>Call Number TA472 C46 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/>Penilaian kebolehbinaan : kajian kesent://SD_ILS/0/SD_ILS:1549902024-05-08T01:06:48Z2024-05-08T01:06:48Zby Faizul Ideris<br/>Author Faizul Ideris<br/>Format: Books<br/>Call Number TH145 F34 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/>Prosedur keselamatan kerja-kerja pembinaan dan senggaraan di sistem pembahagian TNB dengan konsep sistem kualiti ISO 9002ent://SD_ILS/0/SD_ILS:1657222024-05-08T01:06:48Z2024-05-08T01:06:48Zby Arman Che Othman<br/>Author Arman Che Othman<br/>Format: Books<br/>Call Number TH438 A75 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas Projek (Sarjana Muda Kejuruteraan Elektrik) - Universiti Teknologi Malaysia, 2000<br/>The incorporation of maintenance requirements and planning at the design and construction stages : a case studyent://SD_ILS/0/SD_ILS:1491712024-05-08T01:06:48Z2024-05-08T01:06:48Zby Zulkarnain Mohd. Shah, 1960-<br/>Author Zulkarnain Mohd. Shah, 1960-<br/>Format: Books<br/>Call Number TH425 Z844 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Thesis (Master of Science (Construction Management)) - Universiti Teknologi Malaysia, 2000<br/>Kajian perbandingan di antara teknologi trenchless dengan kaedah konvensionalent://SD_ILS/0/SD_ILS:1551492024-05-08T01:06:48Z2024-05-08T01:06:48Zby Kamaruddin Hassan<br/>Author Kamaruddin Hassan<br/>Format: Books<br/>Call Number TH213.5 K35 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/>Menilai pengetahuan kontraktor dalam aspek-aspek kemahiran binaan bangunan : satu kajian awalan keatas kontraktor kelab usahawan muda Besutent://SD_ILS/0/SD_ILS:1100892024-05-08T01:06:48Z2024-05-08T01:06:48Zby Sorani Ismail<br/>Author Sorani Ismail<br/>Format: Books<br/>Call Number TH438 S67 1999 raf<br/>Publisher UTM,<br/>Publication Date 1999<br/>Kertas Projek (Sarjana Muda Teknologi serta Pendidikan (Kejuruteraan Awam)) - Universiti Teknologi Malaysia, 1999<br/>Penggunaan konkrit ringan autoklaf dan batu-bata tanpa bakar dalam industri pembinaanent://SD_ILS/0/SD_ILS:1616322024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Zaidi Zainal<br/>Author Mohd. Zaidi Zainal<br/>Format: Books<br/>Call Number TH1461 M93 1999<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/>Kajian projek bermasalah di Wilayah Persekutuan, Kuala Lumpurent://SD_ILS/0/SD_ILS:1332402024-05-08T01:06:48Z2024-05-08T01:06:48Zby Zulkarnain Ali<br/>Author Zulkarnain Ali<br/>Format: Books<br/>Call Number TH438 Z85 1999<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/>Strategi syarikat pembinaan dalam perbezaan iklim ekonomient://SD_ILS/0/SD_ILS:1483012024-05-08T01:06:48Z2024-05-08T01:06:48Zby Affan Prakasya<br/>Author Affan Prakasya<br/>Format: Books<br/>Call Number TH425 A334 1999 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Tesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 1999<br/>Kaedah pembayaran keatas projek pembinaan di Sumatera Barat Indonesiaent://SD_ILS/0/SD_ILS:1483132024-05-08T01:06:48Z2024-05-08T01:06:48Zby Ida Syuryanti Rinaldy<br/>Author Ida Syuryanti Rinaldy<br/>Format: Books<br/>Call Number TA210 I32 1999 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Tesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 1999<br/>Kajian ke atas jenis-jenis asas untuk projek perumahanent://SD_ILS/0/SD_ILS:1315802024-05-08T01:06:48Z2024-05-08T01:06:48Zby Hashim Tee Abdullah<br/>Author Hashim Tee Abdullah<br/>Format: Books<br/>Call Number TH2101 H37 1999<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/>Project delays recovery on construction workent://SD_ILS/0/SD_ILS:6452082024-05-08T01:06:48Z2024-05-08T01:06:48Zby Shinta Adiwati<br/>Author Shinta Adiwati, Mohd. Zaimi Abdul Majid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 S35 1999 raf<br/>Publication Date 1999<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 1999<br/>Sistem asas untuk projek mega : satu kajian kesent://SD_ILS/0/SD_ILS:1320082024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohamad Anuar Othman<br/>Author Mohamad Anuar Othman<br/>Format: Books<br/>Call Number TH5201 M36 1998<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/>Kelewatan projekent://SD_ILS/0/SD_ILS:1320222024-05-08T01:06:48Z2024-05-08T01:06:48Zby Md. Juhari Ismail<br/>Author Md. Juhari Ismail<br/>Format: Books<br/>Call Number TH441 M58 1998<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/>Pengurusan sub-kontraktor bagi projek pembangunan perumahan kediaman komersial bertingkatent://SD_ILS/0/SD_ILS:1320362024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mohd. Safee Ab. Latif<br/>Author Mohd. Safee Ab. Latif<br/>Format: Books<br/>Call Number TH438 M74 1998<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/>Kajian prestasi kontraktor kecil dalam industri pembinaan di Rancangan Feldaent://SD_ILS/0/SD_ILS:1322172024-05-08T01:06:48Z2024-05-08T01:06:48Zby Mushaimi Mustaffa<br/>Author Mushaimi Mustaffa<br/>Format: Books<br/>Call Number TH438 M88 1998<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/>Construction duration prediction using neural network methodologyent://SD_ILS/0/SD_ILS:1265972024-05-08T01:06:48Z2024-05-08T01:06:48Zby Razali Abdul Hamid<br/>Author Razali Abdul Hamid<br/>Format: Books<br/>Call Number TH438 R39 1996<br/>Publisher University of Manchester,<br/>Publication Date 1996<br/>Thesis (Doctor of Philosophy) - University of Manchester, 1996<br/>Kajian prestasi kontraktor kecil dalam pembinaanent://SD_ILS/0/SD_ILS:3674082024-05-08T01:06:48Z2024-05-08T01:06:48Zby Faridah Hanim Mohamad Nor<br/>Author Faridah Hanim Mohamad Nor<br/>Format: Books<br/>Call Number TH438.F37 1995 raf<br/>Publisher UTM,<br/>Publication Date 1995<br/>Kertas projek (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 1995<br/>Pembinaan bersistem : kecekapan dan keberkesanannya berbanding kaedah konvensionalent://SD_ILS/0/SD_ILS:3660352024-05-08T01:06:48Z2024-05-08T01:06:48Zby Azizan Sadiron<br/>Author Azizan Sadiron<br/>Format: Books<br/>Call Number TA660.W3 A94 1995 raf<br/>Publisher UTM,<br/>Publication Date 1995<br/>Kertas projek (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 1995<br/>Pembinaan bersistem : kecekapan dan keberkesanannya berbanding kaedah konvensionalent://SD_ILS/0/SD_ILS:3664502024-05-08T01:06:48Z2024-05-08T01:06:48Zby Saiful Azuan Abd Shukor<br/>Author Saiful Azuan Abd Shukor<br/>Format: Books<br/>Call Number TA660.W3 S24 1995 raf<br/>Publisher UTM,<br/>Publication Date 1995<br/>Kertas projek (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 1995<br/>Kajian prestasi kontraktor kecil dalam pembinaanent://SD_ILS/0/SD_ILS:3665972024-05-08T01:06:48Z2024-05-08T01:06:48Zby Hafizah Daud<br/>Author Hafizah Daud<br/>Format: Books<br/>Call Number TH438.H33 1995 raf<br/>Publisher UTM,<br/>Publication Date 1995<br/>Kertas projek (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 1995<br/>Ramalan kegagalan syarikat dalam industri pembinaanent://SD_ILS/0/SD_ILS:3452752024-05-08T01:06:48Z2024-05-08T01:06:48Zby Chan, Yeen Kong<br/>Author Chan, Yeen Kong<br/>Format: Books<br/>Call Number TH441.C42 1994 raf<br/>Publisher UTM,<br/>Publication Date 1994<br/>Kertas projek (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 1994<br/>Kajian penetapan tarikh milik tapak bagi projek JKRent://SD_ILS/0/SD_ILS:1658292024-05-08T01:06:48Z2024-05-08T01:06:48Zby Azri Mohd. Yunus<br/>Author Azri Mohd. Yunus<br/>Format: Books<br/>Call Number TH438.A97 1993 raf<br/>Publisher UTM,<br/>Publication Date 1993<br/>Kertas Projek (Sarjana Muda Ukur Bahan)--Universiti Teknologi Malaysia, 1993.<br/>Kajian kemungkinan ke atas industri rumah kayu pasang-siap di Malaysiaent://SD_ILS/0/SD_ILS:8443862024-05-08T01:06:48Z2024-05-08T01:06:48Zby Khalidon Kasban<br/>Author Khalidon Kasban, Rosli Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.5 K43 1987 raf<br/>Publication Date 1986<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1986<br/>