Search Results for - Narrowed by: Construction contracts SirsiDynix Enterprise http://portal.utm.my/client/en_AU/main/main/qf$003dSUBJECT$002509Subject$002509Construction$002bcontracts$002509Construction$002bcontracts$0026ps$003d300$0026isd$003dtrue?dt=list 2024-05-02T20:30:06Z FIDIC quick reference guide : red book ent://SD_ILS/0/SD_ILS:839357 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Barr, Brian (Brian Samuel), author<br/>Author&#160;Barr, Brian (Brian Samuel), author,&#160;Grutters, Leo, author,&#160;Institution of Civil Engineers (Great Britain)<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 B375 2015 rf<br/>Publisher&#160;ICE Publishing,<br/>Publication Date&#160;2106&#160;2015<br/>ISBN&#160;9780727760364<br/> Problems with nominations : the pitfalls to beware ent://SD_ILS/0/SD_ILS:457127 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Morris, Derrick<br/>Author&#160;Morris, Derrick<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M67 f<br/>Publisher&#160;s.n.],<br/>Publication Date&#160;2020&#160;2019&#160;2018&#160;2017&#160;2016<br/> Refereed journal : the Australian Institute of Quantity Surveyors ent://SD_ILS/0/SD_ILS:538414 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Australian Institute of Quantity Surveyors<br/>Author&#160;Australian Institute of Quantity Surveyors<br/>Format:&#160;Continuing Resources<br/>Call Number&#160;TH435 R34 ol.1:no.1(1997)<br/>Publisher&#160;The Auatralian Institute of Quantity Surveyors,<br/>Publication Date&#160;2020&#160;2019&#160;2018&#160;2017&#160;2016<br/> Framework to reduce variation processing time in public projects ent://SD_ILS/0/SD_ILS:870250 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Munirah Abdul Kadir, 1982-, author<br/>Author&#160;Munirah Abdul Kadir, 1982-, author,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;NA1996 M86 2018 raf<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2018<br/> Framework to reduce variation processing time in public projects ent://SD_ILS/0/SD_ILS:870260 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Munirah Abdul Kadir, 1982-, author<br/>Author&#160;Munirah Abdul Kadir, 1982-, author,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Electronic Resources<br/>Call Number&#160;CP 065392 ra<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2018<br/> Contract in writing requirement for statutory adjudication claim under CIPAA 2012 ent://SD_ILS/0/SD_ILS:870263 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd. Faisal A. Muthalib, author<br/>Author&#160;Mohd. Faisal A. Muthalib, author,&#160;Hamizah Liyana Tajul Ariffin, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 M643 2018 raf<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - - Universiti Teknologi Malaysia, 2018<br/> Contract in writing requirement for statutory adjudication claim under CIPAA 2012 ent://SD_ILS/0/SD_ILS:870265 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd. Faisal A. Muthalib, author<br/>Author&#160;Mohd. Faisal A. Muthalib, author,&#160;Hamizah Liyana Tajul Ariffin, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 065395 ra<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - - Universiti Teknologi Malaysia, 2018<br/> Time at large in construction ent://SD_ILS/0/SD_ILS:870268 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Zuraina Jar, 1982-, author<br/>Author&#160;Zuraina Jar, 1982-, author,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 Z87 2018 raf<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - - Universiti Teknologi Malaysia, 2018<br/> Time at large in construction ent://SD_ILS/0/SD_ILS:870273 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Zuraina Jar, 1982-, author<br/>Author&#160;Zuraina Jar, 1982-, author,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 065397 ra<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - - Universiti Teknologi Malaysia, 2018<br/> Application of electronic communication in Malaysian Standard Form of contract ent://SD_ILS/0/SD_ILS:870296 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Suhaila Endut, 1986-, author<br/>Author&#160;Suhaila Endut, 1986-, author,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 S84 2018 raf<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2018<br/> Application of electronic communication in Malaysian Standard Form of contract ent://SD_ILS/0/SD_ILS:870297 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Suhaila Endut, 1986-, author<br/>Author&#160;Suhaila Endut, 1986-, author,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Electronic Resources<br/>Call Number&#160;CP 065405 ra<br/>Publication Date&#160;2018<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2018<br/> Payment dispute resolution in construction industry by using CIPA ACT 2012 ent://SD_ILS/0/SD_ILS:871156 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ibrahim Saleh, 1976-, author<br/>Author&#160;Ibrahim Saleh, 1976-, author,&#160;Abdul Rahman Abdul Hamid, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH438 I27 2018 raf<br/>Publication Date&#160;2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/> Payment dispute resolution in construction industry by using CIPA ACT 2012 ent://SD_ILS/0/SD_ILS:871159 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ibrahim Saleh, 1976-, author<br/>Author&#160;Ibrahim Saleh, 1976-, author,&#160;Abdul Rahman Abdul Hamid, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Electronic Resources<br/>Call Number&#160;CP 065654 ra<br/>Publication Date&#160;2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/> Rules of exclusion clause : the site investigation clause ent://SD_ILS/0/SD_ILS:862206 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Shazwana Buang, 1979- author<br/>Author&#160;Shazwana Buang, 1979- author,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 S53 2017 raf<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2016<br/> Rules of exclusion clause : the site investigation clause ent://SD_ILS/0/SD_ILS:862210 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Shazwana Buang, 1979- author<br/>Author&#160;Shazwana Buang, 1979- author,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 061831 ra<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2016<br/> Construction Contract Administration for Project Owners ent://SD_ILS/0/SD_ILS:865364 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lancome, Claude G., author<br/>Author&#160;Lancome, Claude G., author<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 L26 2017<br/>Publication Date&#160;2017<br/>ISBN&#160;9781138244252<br/> Judicial interpretation of consequential loss in construction contract ent://SD_ILS/0/SD_ILS:868264 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Rabiatul Hidayah Mokhtar, 1993-, author<br/>Author&#160;Rabiatul Hidayah Mokhtar, 1993-, author,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 R33 2017 raf<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Judicial interpretation of consequential loss in construction contract ent://SD_ILS/0/SD_ILS:868265 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Rabiatul Hidayah Mokhtar, 1993-, author<br/>Author&#160;Rabiatul Hidayah Mokhtar, 1993-, author,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Electronic Resources<br/>Call Number&#160;CP 064465 ra<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Rights of contractors on recovery of payment after termination of contract under CIPAA 2012 ent://SD_ILS/0/SD_ILS:868266 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohamad Zahierruden Ismail, 1992-, author<br/>Author&#160;Mohamad Zahierruden Ismail, 1992-, author,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 M64 2017 raf<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Contemporaneous records in construction claim ent://SD_ILS/0/SD_ILS:868268 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Kerk, Chia Cun, 1992-, author<br/>Author&#160;Kerk, Chia Cun, 1992-, author,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 K47 2017 raf<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Contemporaneous records in construction claim ent://SD_ILS/0/SD_ILS:868269 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Kerk, Chia Cun, 1992-, author<br/>Author&#160;Kerk, Chia Cun, 1992-, author,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 064467 ra<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Rights of contractors on recovery of payment after termination of contract under CIPAA 2012 ent://SD_ILS/0/SD_ILS:868267 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohamad Zahierruden Ismail, 1992-, author<br/>Author&#160;Mohamad Zahierruden Ismail, 1992-, author,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Electronic Resources<br/>Call Number&#160;CP 064466 ra<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Cost of stay proceedings in arbitration ent://SD_ILS/0/SD_ILS:868663 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Hanafi Ab. Haris, 1991-, author<br/>Author&#160;Hanafi Ab. Haris, 1991-, author,&#160;Hamizah Liyana Tajul Ariffin, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K2400 H363 2017 raf<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Delay in giving possession of the site in realation to direct loss and / or expense claims ent://SD_ILS/0/SD_ILS:852904 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Alfriady Zuliansyah, 1989- author<br/>Author&#160;Alfriady Zuliansyah, 1989- author,&#160;Hamizah Liyana Tajul Ariffin, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KD1641 Z85 2015 raf<br/>Publication Date&#160;2016&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Framework of decision making process for variation works to analyse impacts caused by factors influencing decisions ent://SD_ILS/0/SD_ILS:853508 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Norazam Othman, 1963- author<br/>Author&#160;Norazam Othman, 1963- author,&#160;Abd. Ghani Khalid,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;XX(853508.1)<br/>Publication Date&#160;2016<br/>Thesis (Ph.D (Ukur Bahan)) - Universiti Teknologi Malaysia, 2016<br/> Keberkesanan penilaian tender di Kementerian Kemajuan Luar Bandar dan Wilayah, cawangan Negeri Sabah ent://SD_ILS/0/SD_ILS:868963 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Marlinah Aya, 1980-, author<br/>Author&#160;Marlinah Aya, 1980-, author,&#160;Aziruddin Ressang, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TA210 M37 2016 raf<br/>Publication Date&#160;2016<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2016<br/> Keberkesanan penilaian tender di Kementerian Kemajuan Luar Bandar Dan Wilayah Cawangan Negeri Sabah ent://SD_ILS/0/SD_ILS:868966 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Marlinah Aya, 1980-, author<br/>Author&#160;Marlinah Aya, 1980-, author<br/>Format:&#160;Books<br/>Call Number&#160;CP 064842 ra<br/>Publication Date&#160;2016<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2016<br/> Limitation period in latent defects ent://SD_ILS/0/SD_ILS:858189 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mazuan Lin, 1981-, author<br/>Author&#160;Mazuan Lin, 1981-, author,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;XX(858189.1)<br/>Publication Date&#160;2016<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2016<br/> Claims for additional preliminaries costs due to project prolongation ent://SD_ILS/0/SD_ILS:844329 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Aminuddin Saidin, 1986-<br/>Author&#160;Aminuddin Saidin, 1986-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KD1641 A65 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Application of good faith as necessary limits in exercising the termination for convenience clause ent://SD_ILS/0/SD_ILS:844455 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nik Abdul Hafiz Nik Abdullah, 1977- author<br/>Author&#160;Nik Abdul Hafiz Nik Abdullah, 1977- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 N55 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Contractor's implied duty to warn design defects ent://SD_ILS/0/SD_ILS:847352 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Gan, Gilbert Siang Yang, 1989-<br/>Author&#160;Gan, Gilbert Siang Yang, 1989-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 G36 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2015<br/> FIDIC quick reference guide : silver book ent://SD_ILS/0/SD_ILS:839386 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Barr, Brian (Brian Samuel), author<br/>Author&#160;Barr, Brian (Brian Samuel), author,&#160;Grutters, Leo, author,&#160;Institution of Civil Engineers (Great Britain)<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 B377 2015 rf<br/>Publisher&#160;ICE Publishing,<br/>Publication Date&#160;2015<br/>ISBN&#160;9780727760388<br/> FIDIC quick reference guide : yellow book ent://SD_ILS/0/SD_ILS:839390 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Barr, Brian (Brian Samuel), author<br/>Author&#160;Barr, Brian (Brian Samuel), author,&#160;Grutters, Leo, author,&#160;Institution of Civil Engineers (Great Britain)<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 B376 2015 rf<br/>Publisher&#160;ICE Publishing,<br/>Publication Date&#160;2015<br/>ISBN&#160;9780727760463<br/> Mutual termination agreement ent://SD_ILS/0/SD_ILS:844451 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Roqiyah Nur Mohd. Sharifuddin, 1977- author<br/>Author&#160;Roqiyah Nur Mohd. Sharifuddin, 1977- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 R67 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Common approach used by the industry in assessing the contractor entitlement for extention of time in the event of concurrent delay ent://SD_ILS/0/SD_ILS:844454 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohammad Irfan Ahmad Zaki, 1981-<br/>Author&#160;Mohammad Irfan Ahmad Zaki, 1981-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M648 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Claims for additional preliminaries costs due to project prolongation ent://SD_ILS/0/SD_ILS:847358 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Aminuddin Saidin, 1986-<br/>Author&#160;Aminuddin Saidin, 1986-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053103 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> The prevailing practice in deciding the practical completion of construction work ent://SD_ILS/0/SD_ILS:847361 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohammad Harith Mohd. Yunos, 1982- author<br/>Author&#160;Mohammad Harith Mohd. Yunos, 1982- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M649 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> The prevailing practice in deciding the practical completion of construction work ent://SD_ILS/0/SD_ILS:847362 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohammad Harith Mohd. Yunod, 1982- author<br/>Author&#160;Mohammad Harith Mohd. Yunod, 1982- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053141 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Mutual termination agreement ent://SD_ILS/0/SD_ILS:847378 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Roqiyah Nur Mohd. Sharifuddin, 1977- author<br/>Author&#160;Roqiyah Nur Mohd. Sharifuddin, 1977- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053137 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Common approach used by the industry in assessing the contractor entitlement for extention of time in the event of concurrent delay ent://SD_ILS/0/SD_ILS:847379 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohammad Irfan Ahmad Zaki, 1981-<br/>Author&#160;Mohammad Irfan Ahmad Zaki, 1981-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053110 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Recovery of head office overheads due to prolongation of time ent://SD_ILS/0/SD_ILS:847380 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ramli Ismail, 1975-, author<br/>Author&#160;Ramli Ismail, 1975-, author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438.4 R36 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Recovery of head office overheads due to prolongation of time ent://SD_ILS/0/SD_ILS:847383 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ramli Ismail, 1975-, author<br/>Author&#160;Ramli Ismail, 1975-, author<br/>Format:&#160;Books<br/>Call Number&#160;CP 053136 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Assessing loss and expenses claim by prolongation cost ent://SD_ILS/0/SD_ILS:847384 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Raiha Azene Ramli, 1980- author<br/>Author&#160;Raiha Azene Ramli, 1980- author,&#160;Maizon Hashim,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KD1641 R35 2015 raf<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Assessing loss and expenses claim by prolongation cost ent://SD_ILS/0/SD_ILS:847387 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Raiha Azene Ramli, 1980- author<br/>Author&#160;Raiha Azene Ramli, 1980- author,&#160;Maizon Hashim,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053135 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> Application of good faith as necessary limits in exercising the termination for convenience clause ent://SD_ILS/0/SD_ILS:847388 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nik Abdul Hafiz Nik Abdullah, 1977- author<br/>Author&#160;Nik Abdul Hafiz Nik Abdullah, 1977- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053114 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/> FIDIC quick reference guide : pink book ent://SD_ILS/0/SD_ILS:839354 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Barr, Brian (Brian Samuel), author<br/>Author&#160;Barr, Brian (Brian Samuel), author,&#160;Grutters, Leo, author,&#160;Institution of Civil Engineers (Great Britain)<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 B374 2015 rf<br/>Publisher&#160;ICE Publishing,<br/>Publication Date&#160;2015<br/>ISBN&#160;9780727760425<br/> Contractor's implied duty to warn design defects ent://SD_ILS/0/SD_ILS:847355 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Gan, Gilbert Siang Yang, 1989-<br/>Author&#160;Gan, Gilbert Siang Yang, 1989-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053102 ra<br/>Publication Date&#160;2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2015<br/> FIDIC users&rsquo; guide : a practical guide to the Red, Yellow, MDB harmonised and Subcontract books ent://SD_ILS/0/SD_ILS:811144 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Barr, Brian<br/>Author&#160;Barr, Brian,&#160;Grutters, Leo,&#160;Owen, Gwyn<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 B37 2014<br/>Edition&#160;3rd ed.<br/>Publisher&#160;ICE Publishing,<br/>Publication Date&#160;2014<br/>ISBN&#160;9780727758569<br/> The FIDIC contracts: obligations of the parties ent://SD_ILS/0/SD_ILS:833546 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Hewitt, Andrew, author<br/>Author&#160;Hewitt, Andrew, author<br/>Format:&#160;Electronic Resources<br/>Call Number&#160;K891.B8 H494 2014<br/>Publisher&#160;Wiley Blackwell,<br/>Publication Date&#160;2014<br/>ISBN&#160;9781118291801&#160;9781118291788<br/>Online version restricted to NUS staff and students only through NUSNET.<br/> Construction dispute research : conceptualisation, avoidance and resolution ent://SD_ILS/0/SD_ILS:834382 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Cheung, Sai On, editor.<br/>Author&#160;Cheung, Sai On, editor.<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 C664 2014<br/>Publisher&#160;Springer,<br/>Publication Date&#160;2014<br/>ISBN&#160;9783319044286<br/> Ethical behaviors in E-Tendering based construction procurement process in Malaysia ent://SD_ILS/0/SD_ILS:843717 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Zhi Kwong, 1990-<br/>Author&#160;Lee, Zhi Kwong, 1990-,&#160;Rozana Zakaria,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;CP 052119 ra<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Sistem pengurusan kualiti : amalan terbaik proses tuntutan pembayaran dari pihak kontraktor kepada pihak klien ent://SD_ILS/0/SD_ILS:843885 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Azlin Farhana Ramli, 1987- author<br/>Author&#160;Azlin Farhana Ramli, 1987- author,&#160;Mat Naim Abdullah @ Mohd. Asmoni,&#160;Fakulti Geoinformasi dan Harta Tanah<br/>Format:&#160;Books<br/>Call Number&#160;TH425 A956 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Pengurusan Aset dan Fasiliti) - Universiti Teknologi Malaysia, 2014<br/> Sistem pengurusan kualiti : amalan terbaik proses tuntutan pembayaran dari pihak kontraktor kepada pihak klien ent://SD_ILS/0/SD_ILS:843909 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Azlin Farhana Ramli, 1987- author<br/>Author&#160;Azlin Farhana Ramli, 1987- author,&#160;Mat Naim Abdullah @ Mohd. Asmoni,&#160;Fakulti Geoinformasi Dan Harta Tanah<br/>Format:&#160;Books<br/>Call Number&#160;CP 052284 ra<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Pengurusan Aset dan Fasiliti) - Universiti Teknologi Malaysia, 2014<br/> Basis in ascertaining the amount of liquidated damages ent://SD_ILS/0/SD_ILS:847174 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ili Liyana Azman, 1986- author<br/>Author&#160;Ili Liyana Azman, 1986- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 053037 ra<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Ethical behaviors in E-Tendering based construction procurement process in Malaysia ent://SD_ILS/0/SD_ILS:832739 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Zhi Kwong, 1990-<br/>Author&#160;Lee, Zhi Kwong, 1990-,&#160;Rozana Zakaria,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH425 L443 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Application of estoppel and waiver in the non-fulfillment of conditions precedent ent://SD_ILS/0/SD_ILS:828055 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nur 'Izzati Hidzir, 1988-<br/>Author&#160;Nur 'Izzati Hidzir, 1988-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KD130 N87 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Defects in construction and the temporary disconformity principle ent://SD_ILS/0/SD_ILS:828123 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ahmad Abd. Jalil, 1985-<br/>Author&#160;Ahmad Abd. Jalil, 1985-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 A56 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Defects in construction and the temporary disconformity principle ent://SD_ILS/0/SD_ILS:828125 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ahmad Abd. Jalil, 1985-<br/>Author&#160;Ahmad Abd. Jalil, 1985-,&#160;Jamaluddin Yaakob, supervisor<br/>Format:&#160;Books<br/>Call Number&#160;CP 050391 ra<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> International construction arbitration law ent://SD_ILS/0/SD_ILS:829981 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Jenkins, Jane, author<br/>Author&#160;Jenkins, Jane, author<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 J46 2014<br/>Edition&#160;2nd ed.<br/>Publisher&#160;Kluwer Law International,<br/>Publication Date&#160;2014<br/>ISBN&#160;9789041149855<br/> International contracting : contract management in complex construction projects ent://SD_ILS/0/SD_ILS:834484 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Puil, John van der, author<br/>Author&#160;Puil, John van der, author,&#160;Weele, Arjan van, author<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 P85 2014<br/>Publisher&#160;Imperial College Press,<br/>Publication Date&#160;2014<br/>ISBN&#160;9781908979506&#160;9781908979513<br/> NEC3. Guidance notes &amp; flow charts ent://SD_ILS/0/SD_ILS:837666 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Institution of Civil Engineers (Great Britain)<br/>Author&#160;Institution of Civil Engineers (Great Britain)<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 N43 2014 rf v.1<br/>Publisher&#160;NEC,<br/>Publication Date&#160;2014<br/>ISBN&#160;9780727760302&#160;9781909761100&#160;9780727760272&#160;9780727758910&#160;9780727758934<br/> Basis in ascertaining the amount of liquidated damages ent://SD_ILS/0/SD_ILS:841719 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ili Liyana Azman, 1986- author<br/>Author&#160;Ili Liyana Azman, 1986- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 I45 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Variation order in lump sum contract ent://SD_ILS/0/SD_ILS:841483 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Noor Amalina Mohayidin, 1988- author<br/>Author&#160;Noor Amalina Mohayidin, 1988- author,&#160;Maizon Hashim,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N668 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Valid and invalid variation omission of works ent://SD_ILS/0/SD_ILS:846694 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mothilal Muniandy, 1988- author<br/>Author&#160;Mothilal Muniandy, 1988- author,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 M68 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Variation order in lump sum contract ent://SD_ILS/0/SD_ILS:847036 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Noor Amalina Mohayidin, 1988- author<br/>Author&#160;Noor Amalina Mohayidin, 1988- author,&#160;Maizon Hashim,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 052983 ra<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Profile of construction contractual claims ent://SD_ILS/0/SD_ILS:847062 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nur Jazlianna Samsudin, 1990- author<br/>Author&#160;Nur Jazlianna Samsudin, 1990- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 N53 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2014<br/> Profile of construction contractual claims ent://SD_ILS/0/SD_ILS:847064 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nur Jazlianna Samsudin, 1990- author<br/>Author&#160;Nur Jazlianna Samsudin, 1990- author,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 052996 ra<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2014<br/> Employer's implied obligation in construction contract ent://SD_ILS/0/SD_ILS:799884 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nurulain Tazol Arrief, 1989-<br/>Author&#160;Nurulain Tazol Arrief, 1989-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N873 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Doctrine of privity and its application in relation to sub-contractitor;s pay ent://SD_ILS/0/SD_ILS:800011 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nor Aida Mohd Amin, 1976-<br/>Author&#160;Nor Aida Mohd Amin, 1976-<br/>Format:&#160;Books<br/>Call Number&#160;CP 030615 ra<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Employer's implied obligation in construction contract ent://SD_ILS/0/SD_ILS:800021 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nurulain Tazol Arrief, 1989-<br/>Author&#160;Nurulain Tazol Arrief, 1989-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029311 ra<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> The exclusion clause in government standard form of construction contracts ent://SD_ILS/0/SD_ILS:800039 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Saiful Azhar Abd. Hamid, 1977-<br/>Author&#160;Saiful Azhar Abd. Hamid, 1977-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029315 ra<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Procedure in negotiation amounts in construction project disputes ent://SD_ILS/0/SD_ILS:801415 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Suhaili Sa'adon, 1984-<br/>Author&#160;Suhaili Sa'adon, 1984-,&#160;Aziruddin Ressang, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S85 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Procedure in negotiation amounts in construction project disputes ent://SD_ILS/0/SD_ILS:802140 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Suhaili Sa'adon, 1984-<br/>Author&#160;Suhaili Sa'adon, 1984-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029439 ra<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> The implementation of electronic tendering system in Malaysia from contractors' perspective ent://SD_ILS/0/SD_ILS:809566 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Muhammad Nor Aliffuddin Bani, 1989-<br/>Author&#160;Muhammad Nor Aliffuddin Bani, 1989-<br/>Format:&#160;Books<br/>Call Number&#160;CP 031308 ra<br/>Publication Date&#160;2013<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2013<br/> The implementation of electronic tendering system in Malaysia from contractors' perspective ent://SD_ILS/0/SD_ILS:814263 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Muhammad Nor Aliffuddin Bani, 1989-<br/>Author&#160;Muhammad Nor Aliffuddin Bani, 1989-,&#160;Rozana Zakaria,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TA180 M84 2013 raf<br/>Publication Date&#160;2013<br/>Project Paper (Sarjana Muda (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Doctrine of privity and its application in relation to sub-contractitor's pay ent://SD_ILS/0/SD_ILS:799903 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nor Aida Mohd Amin, 1976-<br/>Author&#160;Nor Aida Mohd Amin, 1976-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 N676 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> The exclusion clause in government standard form of construction contracts ent://SD_ILS/0/SD_ILS:799953 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Saiful Azhar Abd. Hamid, 1977-<br/>Author&#160;Saiful Azhar Abd. Hamid, 1977-,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 S25 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Contract administration problem ent://SD_ILS/0/SD_ILS:800778 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Bakori Ahmad, 1969-<br/>Author&#160;Bakori Ahmad, 1969-,&#160;Mohamad Ibrahim Mohamad, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH425 B35 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Contract administration problem ent://SD_ILS/0/SD_ILS:801765 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Bakori Ahmad, 1969-<br/>Author&#160;Bakori Ahmad, 1969-,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;CP 029261 ra<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> An employer's and engineer's guide to the FIDIC conditions of contract ent://SD_ILS/0/SD_ILS:810558 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Robinson, Michael D.<br/>Author&#160;Robinson, Michael D.<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 R63 2013<br/>Publisher&#160;Wiley-Blackwell,<br/>Publication Date&#160;2013<br/>ISBN&#160;9781118385609<br/> International construction contracts : a handbook : with commentary on the FIDIC design-build forms ent://SD_ILS/0/SD_ILS:810741 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Godwin, William, 1923-<br/>Author&#160;Godwin, William, 1923-<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 G63 2013<br/>Publisher&#160;Wiley,<br/>Publication Date&#160;2013<br/>ISBN&#160;9780470655726<br/> Comparison of collateral warranty and indemnity in construction contract ent://SD_ILS/0/SD_ILS:818429 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nurshafeeqah Mohd. Zin, 1987-<br/>Author&#160;Nurshafeeqah Mohd. Zin, 1987-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N879 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Comparison of collateral warranty and indemnity in construction contract ent://SD_ILS/0/SD_ILS:818431 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nurshafeeqah Mohd. Zin, 1987-<br/>Author&#160;Nurshafeeqah Mohd. Zin, 1987-<br/>Format:&#160;Books<br/>Call Number&#160;CP 031773 ra<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Unconscionable call of performance bond ent://SD_ILS/0/SD_ILS:818433 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Wan Noor Solehha Wan Nik, 1985-<br/>Author&#160;Wan Noor Solehha Wan Nik, 1985-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 W36 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Unconscionable call of performance bond ent://SD_ILS/0/SD_ILS:818438 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Wan Noor Solehha Wan Nik, 1985-<br/>Author&#160;Wan Noor Solehha Wan Nik, 1985-<br/>Format:&#160;Books<br/>Call Number&#160;CP 031837 ra<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Sustainable performance of formwork system in Malaysia ent://SD_ILS/0/SD_ILS:820768 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Rozana Zakaria, author<br/>Author&#160;Rozana Zakaria, author,&#160;Mohd. Affendi Ismail, 1987-, author,&#160;Mohammed Taher Alashwal, 1976-, author,&#160;Rosli Mohamad Zin, author<br/>Format:&#160;Books<br/>Call Number&#160;MAK 18655<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2013&#160;2007<br/> Dokumen Kontrak : perkhidmatan penyenggaraan landskap dan pembersihan kawasan di Kampus UTM Johor Baharu, Johor (Zon 2) ent://SD_ILS/0/SD_ILS:825371 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;Aremes (M) Sdn. Bhd<br/>Format:&#160;Books<br/>Call Number&#160;DK 0151<br/>Publication Date&#160;2013<br/> Dokumen Kontrak : perkhidmatan penyenggaraan landskap dan pembersihan kawasan di Kampus UTM Johor Baharu, Johor (Zon 9) ent://SD_ILS/0/SD_ILS:825373 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;Kontraktor Asas<br/>Format:&#160;Books<br/>Call Number&#160;DK 0157<br/>Publication Date&#160;2013<br/> Dokumen Kontrak : perkhidmatan penyenggaraan landskap dan pembersihan kawasan di Kampus UTM Johor Baharu, Johor (Zon 7) ent://SD_ILS/0/SD_ILS:825359 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;TKT Berkat<br/>Format:&#160;Books<br/>Call Number&#160;DK 0156 ra<br/>Publication Date&#160;2013<br/> Dokumen Kontrak : perkhidmatan penyenggaraan landskap dan pembersihan kawasan di Kampus UTM Johor Baharu, Johor (Zon 3) ent://SD_ILS/0/SD_ILS:825375 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;Pengurusan Shah<br/>Format:&#160;Books<br/>Call Number&#160;DK 0152<br/>Publication Date&#160;2013<br/> Dokumen Kontrak : perkhidmatan penyenggaraan landskap dan pembersihan kawasan di Kampus UTM Johor Baharu, Johor (Zon 1) ent://SD_ILS/0/SD_ILS:825362 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;Tashable Enterprise<br/>Format:&#160;Books<br/>Call Number&#160;DK 0150<br/>Publication Date&#160;2013<br/> Dokumen Kontrak : perkhidmatan penyenggaraan landskap dan pembersihan kawasan di Kampus UTM Johor Baharu, Johor (Zon 6) ent://SD_ILS/0/SD_ILS:825365 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;Hegira Engineering Sdn. Bhd<br/>Format:&#160;Books<br/>Call Number&#160;DK 0155<br/>Publication Date&#160;2013<br/> How to use BIM with NEC3 contracts : an NEC document April 2013 ent://SD_ILS/0/SD_ILS:837653 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z Format:&#160;Books<br/>Call Number&#160;KD1641 H69 2013 f<br/>Publisher&#160;NEC/ Thomas Telford Ltd.,<br/>Publication Date&#160;2013<br/>ISBN&#160;9780727759719<br/> Termination of contract : abandonment of work ent://SD_ILS/0/SD_ILS:799727 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd. Nur Iman Al Hafiz Mohd. Jamil, 1987-<br/>Author&#160;Mohd. Nur Iman Al Hafiz Mohd. Jamil, 1987-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M643 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012&#160;Thesis (Sarjana) - Universiti Teknologi Malaysia, 2012<br/> Summary judgement : triable issues as a defence ent://SD_ILS/0/SD_ILS:799731 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Norhazren Izatie Mohd., 1988-<br/>Author&#160;Norhazren Izatie Mohd., 1988-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N679 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Principle methods of assessing concurrent delays in construction ent://SD_ILS/0/SD_ILS:799739 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Purnomo, 1984-<br/>Author&#160;Purnomo, 1984-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 P87 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Summary judgement : triable issues as a defence ent://SD_ILS/0/SD_ILS:799763 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Norhazren Izatie Mohd., 1988-<br/>Author&#160;Norhazren Izatie Mohd., 1988-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029147 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Termination of contract abandonment of work ent://SD_ILS/0/SD_ILS:799777 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd Nur Iman Al Hafiz, 1987-<br/>Author&#160;Mohd Nur Iman Al Hafiz, 1987-<br/>Format:&#160;Books<br/>Call Number&#160;CP 030463 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Principle methods of assessing concurrent delays in construction ent://SD_ILS/0/SD_ILS:799796 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Purnomo, 1984- author<br/>Author&#160;Purnomo, 1984- author,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 029182 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Extension of time in commencement of arbitration proceedings ent://SD_ILS/0/SD_ILS:800009 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Noor Halwani Mokhtar, 1988-<br/>Author&#160;Noor Halwani Mokhtar, 1988-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029325 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> 'Best endeavours' for granting extension of time in construction contract ent://SD_ILS/0/SD_ILS:800012 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nur Farah Farhana Rasid, 1990-<br/>Author&#160;Nur Farah Farhana Rasid, 1990-<br/>Format:&#160;Books<br/>Call Number&#160;CP 032522 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> The irrelevancy of claim for set-off in the existence of provisions in standard forms of contract ent://SD_ILS/0/SD_ILS:800218 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohamad Safuan Mohd. Nazam, 1989-<br/>Author&#160;Mohamad Safuan Mohd. Nazam, 1989-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M647 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Harbans' engineering and construction contracts management : pre-contract award practice ent://SD_ILS/0/SD_ILS:830214 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Harbans Singh K. S.<br/>Author&#160;Harbans Singh K. S.<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 H374 2012<br/>Edition&#160;2nd ed.<br/>Publisher&#160;LexisNexis,<br/>Publication Date&#160;2012<br/>ISBN&#160;9789674001117<br/> Construing contract clause : the literal rule ent://SD_ILS/0/SD_ILS:799594 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chai, Siaw Hiong, 1988-<br/>Author&#160;Chai, Siaw Hiong, 1988-,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 C435 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains ( Pengurusan Pembinaan Kontrak)) - Universiti Teknologi Malaysia, 2012<br/> The restraints of performance bond claims in construction industry ent://SD_ILS/0/SD_ILS:799634 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Poh, Grace Chieng Ling, 1988-<br/>Author&#160;Poh, Grace Chieng Ling, 1988-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029162 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> The restraints of performance bond claims in construction industry ent://SD_ILS/0/SD_ILS:799615 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Poh, Grace Chieng Ling, 1988-<br/>Author&#160;Poh, Grace Chieng Ling, 1988-,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA210 P64 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Construing contract clause : the literal rule ent://SD_ILS/0/SD_ILS:799656 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chai, Siaw Hiong, 1988-<br/>Author&#160;Chai, Siaw Hiong, 1988-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029742 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan Kontrak)) - Universiti Teknologi Malaysia, 2012<br/> Termination of construction contracts by employer ent://SD_ILS/0/SD_ILS:799738 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohammad Mahdi Hosseini, 1984-<br/>Author&#160;Mohammad Mahdi Hosseini, 1984-,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M648 2013 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Termination of construction contracts by employer ent://SD_ILS/0/SD_ILS:799761 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohammad Mahdi Hosseini, 1984-<br/>Author&#160;Mohammad Mahdi Hosseini, 1984-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029118 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Extension of time in commencement of arbitration proceedings ent://SD_ILS/0/SD_ILS:799905 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Noor Halwani Mokhtar, 1988-<br/>Author&#160;Noor Halwani Mokhtar, 1988-,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K840 N66 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Contractor's standard of duty for design in traditional contract ent://SD_ILS/0/SD_ILS:802558 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohammad Firdaus Abdullah<br/>Author&#160;Mohammad Firdaus Abdullah<br/>Format:&#160;Books<br/>Call Number&#160;CP 030485 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Payment of architects' fees on termination of services ent://SD_ILS/0/SD_ILS:802591 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nurul Hayani Abu Siroh, 1988-<br/>Author&#160;Nurul Hayani Abu Siroh, 1988-<br/>Format:&#160;Books<br/>Call Number&#160;CP 031024 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Tendering and estimating process in the contractors' organization ent://SD_ILS/0/SD_ILS:808518 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Teo, Peck Hui, 1988-<br/>Author&#160;Teo, Peck Hui, 1988-,&#160;Bachan Singh, supervisor<br/>Format:&#160;Books<br/>Call Number&#160;CP 051056 ra<br/>Publication Date&#160;2012<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam))- Universiti Teknologi Malaysia, 2012<br/> Dokumen Kontrak : Membekal, memasang dan mengujiterima water cooled modular chiller di Bangunan Perpustakaan Sultanah Zanariah Universiti Teknologi Malaysia Johor Baharu, Johor ent://SD_ILS/0/SD_ILS:822380 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;Ran Air Engineering Sdn. Bhd<br/>Format:&#160;Books<br/>Call Number&#160;DK 0148<br/>Publication Date&#160;2012<br/> The challenges in implementing incentive based contract in Jabatan Kerja Raya project ent://SD_ILS/0/SD_ILS:778528 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nurrul Hudha Haryati Amzah, 1974-<br/>Author&#160;Nurrul Hudha Haryati Amzah, 1974-<br/>Format:&#160;Books<br/>Call Number&#160;CP 027242 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Payment of architects' fees on termination of services ent://SD_ILS/0/SD_ILS:782906 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nurul Hayani Abu Siroh, 1988-<br/>Author&#160;Nurul Hayani Abu Siroh, 1988-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N877 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Contractor's standard of duty for design in traditional contract ent://SD_ILS/0/SD_ILS:783236 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohammad Firdaus Abdullah<br/>Author&#160;Mohammad Firdaus Abdullah,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M64 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Time and budget overrun in the construction of town houses in Dubai U.A.E ent://SD_ILS/0/SD_ILS:790842 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Abdul Wahab Shaikh, 1971-<br/>Author&#160;Abdul Wahab Shaikh, 1971-,&#160;Bachan Singh, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH435 A23 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> 'Best endeavours' for granting extension of time in construction contract ent://SD_ILS/0/SD_ILS:798424 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nur Farah Farhana Rasid, 1990-<br/>Author&#160;Nur Farah Farhana Rasid, 1990-,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N878 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> The restraints of performance bond claims in construction industry ent://SD_ILS/0/SD_ILS:798431 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Poh, Grace Chieng Ling, 1988-<br/>Author&#160;Poh, Grace Chieng Ling, 1988-,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA210 P64 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Toward Islamisation of construction contract system in Malaysia ent://SD_ILS/0/SD_ILS:775698 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Siti Zuraidah Zulkifly, 1987-<br/>Author&#160;Siti Zuraidah Zulkifly, 1987-,&#160;Mohamad Ibrahim Mohamad, supervisor,&#160;Arieff Salleh Rosman,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S586 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> The challenges in implementing incentive based contract in Jabatan Kerja Raya project ent://SD_ILS/0/SD_ILS:775719 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nurrul Hudha Haryati Amzah, 1974-<br/>Author&#160;Nurrul Hudha Haryati Amzah, 1974-,&#160;Aziruddin Ressang, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH438.4 N877 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Toward islamisation of construction contract system in Malaysia ent://SD_ILS/0/SD_ILS:778739 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Siti Zuraidah Zulkifly, 1987-<br/>Author&#160;Siti Zuraidah Zulkifly, 1987-<br/>Format:&#160;Books<br/>Call Number&#160;CP 027463 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Time and budget overrun in the construction of town houses in Dubai U.A.E ent://SD_ILS/0/SD_ILS:791203 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Abdul Wahab Shaikh, 1971-<br/>Author&#160;Abdul Wahab Shaikh, 1971-<br/>Format:&#160;Books<br/>Call Number&#160;CP 027950 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> A contractor's guide to the FIDIC conditions of contract ent://SD_ILS/0/SD_ILS:642418 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Robinson, Michael D., consulting engineer<br/>Author&#160;Robinson, Michael D., consulting engineer<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 R635 2011<br/>Publisher&#160;Wiley-Blackwell,<br/>Publication Date&#160;2011<br/>ISBN&#160;9780470657645<br/> Negotiation for disputes settlement in construction claim : a case study on Air Lakitan sub-project-stage 1, Indonesia ent://SD_ILS/0/SD_ILS:802452 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Dewi Rozamurtina, 1976- author<br/>Author&#160;Dewi Rozamurtina, 1976- author,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 029516 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Disputes in design and build construction contract ent://SD_ILS/0/SD_ILS:802683 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Siti Aishah Aqilah Jasri<br/>Author&#160;Siti Aishah Aqilah Jasri<br/>Format:&#160;Books<br/>Call Number&#160;CP 031022 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Risk in construction contractual term and condition ent://SD_ILS/0/SD_ILS:802684 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Siti Huda Kamaruzaman, 1987-<br/>Author&#160;Siti Huda Kamaruzaman, 1987-<br/>Format:&#160;Books<br/>Call Number&#160;CP 030051 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Guide to IC11 : JCT intermediate building contract (IC), JCT intermediate building contract with contractor's design (ICD) ent://SD_ILS/0/SD_ILS:810401 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lupton, Sarah<br/>Author&#160;Lupton, Sarah<br/>Format:&#160;Books<br/>Call Number&#160;KD1641 L875 2011<br/>Publisher&#160;RIBA Publishing,<br/>Publication Date&#160;2011<br/>ISBN&#160;9781859463901<br/> Guide to MW11 : JCT minor works building contract (MW), minor works building contract with contractor's design (MWD) ent://SD_ILS/0/SD_ILS:810403 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lupton, Sarah<br/>Author&#160;Lupton, Sarah<br/>Format:&#160;Books<br/>Call Number&#160;KD1641 L878 2011<br/>Publisher&#160;RIBA Publishing,<br/>Publication Date&#160;2011<br/>ISBN&#160;9781859463895<br/> Construction claims &amp; responses : effective writing &amp; presentation ent://SD_ILS/0/SD_ILS:810736 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Hewitt, Andrew<br/>Author&#160;Hewitt, Andrew<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 H49 2011<br/>Publisher&#160;John Wiley,<br/>Publication Date&#160;2011<br/>ISBN&#160;9780470654811<br/> Harbans' engineering and construction contracts management : law and principles ent://SD_ILS/0/SD_ILS:830216 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Harbans Singh K. S.<br/>Author&#160;Harbans Singh K. S.<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 H373 2011<br/>Edition&#160;2nd ed.<br/>Publisher&#160;LexisNexis,<br/>Publication Date&#160;2011<br/>ISBN&#160;9789674000462<br/> Comparison between the standard forms of building contract used in Nigeria and Malaysia ent://SD_ILS/0/SD_ILS:802254 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Bawa Mustapha<br/>Author&#160;Bawa Mustapha<br/>Format:&#160;Books<br/>Call Number&#160;CP 030084 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Wrongful termination of contract in construction industry ent://SD_ILS/0/SD_ILS:802257 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chong, Oi Siang, 1987-<br/>Author&#160;Chong, Oi Siang, 1987-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029677 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Use of discretion by contract principle ent://SD_ILS/0/SD_ILS:802548 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd. Zaidi Tuah, 1968-<br/>Author&#160;Mohd. Zaidi Tuah, 1968-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029987 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Soft skills of mediator ent://SD_ILS/0/SD_ILS:802557 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd. Sofian Makhtar, 1985-<br/>Author&#160;Mohd. Sofian Makhtar, 1985-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029551 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Service of notice for determination in construction contract ent://SD_ILS/0/SD_ILS:802585 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Wan Mohd. Izuddin Wan Ibrahim, 1963-<br/>Author&#160;Wan Mohd. Izuddin Wan Ibrahim, 1963-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029990 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Quantum meriut in construction contracts ent://SD_ILS/0/SD_ILS:802589 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Zairra Mat Jusoh, 1982-<br/>Author&#160;Zairra Mat Jusoh, 1982-<br/>Format:&#160;Books<br/>Call Number&#160;CP 030238 ra<br/>Publication Date&#160;2011<br/>Thesis (Master of Science (Construction Contact Management)) - Universiti Teknologi Malaysia, 2011<br/> Guide to SBC11 ent://SD_ILS/0/SD_ILS:810405 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lupton, Sarah<br/>Author&#160;Lupton, Sarah<br/>Format:&#160;Books<br/>Call Number&#160;KD1641 L874 2011<br/>Publisher&#160;RIBA Publishing,<br/>Publication Date&#160;2011<br/>ISBN&#160;9781859463871<br/> The application of Selva's and Sakinas's cases in the context of LAD to the Malaysian construction industry ent://SD_ILS/0/SD_ILS:769505 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nur Shidah Maidin, 1982-<br/>Author&#160;Nur Shidah Maidin, 1982-,&#160;Nuremma Mustaffa, supervisor,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 N74 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> The application of Selva's and Sakinas's cases in the context of LAD to the Malaysian construction industry ent://SD_ILS/0/SD_ILS:769509 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nur Shidah Maidin, 1982-<br/>Author&#160;Nur Shidah Maidin, 1982-<br/>Format:&#160;Books<br/>Call Number&#160;CP 024464 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Negotiation for disputes settlement in construction claim : a case study on Air Lakitan sub-project-stage 1, Indonesia ent://SD_ILS/0/SD_ILS:775420 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Dewi Rozamurtina, 1976-<br/>Author&#160;Dewi Rozamurtina, 1976-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 D49 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Comparison between the standard forms of building contract used in Nigeria and Malaysia ent://SD_ILS/0/SD_ILS:775423 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Bawa Mustapha<br/>Author&#160;Bawa Mustapha,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 B39 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Disputes in design and build construction contract ent://SD_ILS/0/SD_ILS:775482 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Siti Aishah Aqilah Jasri<br/>Author&#160;Siti Aishah Aqilah Jasri,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S584 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Tahap kefahaman dan penerimaan kontraktor terhadap adjudikasi dalam industri pembinaan ent://SD_ILS/0/SD_ILS:777301 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Wong, Siew Na, 1988-<br/>Author&#160;Wong, Siew Na, 1988-,&#160;Razali Adul Hamid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KD1641 W664 2011 raf<br/>Publication Date&#160;2011<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2011<br/> Responsibilities of contractors in engineering procurement constructions (EPC) contract ent://SD_ILS/0/SD_ILS:768778 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd. Syafei Ahmad, 1976-<br/>Author&#160;Mohd. Syafei Ahmad, 1976-,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M79 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Responsibilities of contractors in engineering procurement constructions (EPC) contract ent://SD_ILS/0/SD_ILS:769340 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd. Syafei Ahmad, 1976-<br/>Author&#160;Mohd. Syafei Ahmad, 1976-<br/>Format:&#160;Books<br/>Call Number&#160;CP 022392 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Tendering contract : breach by the employer ent://SD_ILS/0/SD_ILS:769398 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Suziana Abdul Hamid, 1978-<br/>Author&#160;Suziana Abdul Hamid, 1978-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S89 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Tendering contract : breach by the employer ent://SD_ILS/0/SD_ILS:769401 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Suziana Abdul Hamid, 1978-<br/>Author&#160;Suziana Abdul Hamid, 1978-<br/>Format:&#160;Books<br/>Call Number&#160;CP 022391 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Wrongful termination of contract in construction industry ent://SD_ILS/0/SD_ILS:775308 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chong, Oi Siang, 1987-<br/>Author&#160;Chong, Oi Siang, 1987-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 C564 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Quantum meriut in construction contracts ent://SD_ILS/0/SD_ILS:775411 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Zairra Mat Jusoh, 1982-<br/>Author&#160;Zairra Mat Jusoh, 1982-,&#160;Jamaluddin Yaakob, supervisor,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 Z35 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Service of notice for determination in construction contracts ent://SD_ILS/0/SD_ILS:775468 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Wan Mohd. Izuddin Wan Ibrahim, 1963-<br/>Author&#160;Wan Mohd. Izuddin Wan Ibrahim, 1963-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 W55 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Use of discretion by contract principle ent://SD_ILS/0/SD_ILS:775473 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd. Zaidi Tuah, 1968-<br/>Author&#160;Mohd. Zaidi Tuah, 1968-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M93 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Risk in construction contractual term and condition ent://SD_ILS/0/SD_ILS:775475 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Siti Huda Kamaruzaman, 1987-<br/>Author&#160;Siti Huda Kamaruzaman, 1987-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S585 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Notice condition precedent to claim liquidated ascertained damages (LAD) ent://SD_ILS/0/SD_ILS:775619 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nur Syaimasyaza Mansor, 1987-<br/>Author&#160;Nur Syaimasyaza Mansor, 1987-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Soft skills of mediator ent://SD_ILS/0/SD_ILS:775735 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd. Sofian Makhtar, 1985-<br/>Author&#160;Mohd. Sofian Makhtar, 1985-,&#160;Norazam Othman, supervisor,&#160;Rosli Abdul Rashid, supervisor<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 M74 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Adequacy of contract provision in managing construction failure ent://SD_ILS/0/SD_ILS:729901 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Naadira Che Kamaruddin, 1985-<br/>Author&#160;Naadira Che Kamaruddin, 1985-,&#160;Mohamad Ibrahim Mohamad, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 N33 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Sikap-sikap positif yang harus dimiliki oleh kontraktor untuk memahami sesebuah dokumen kontrak ent://SD_ILS/0/SD_ILS:748544 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Muhammad Hasif Isnin<br/>Author&#160;Muhammad Hasif Isnin,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH428 M84 2010 raf<br/>Publication Date&#160;2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/> Uberrimae fidei in construction insurance ent://SD_ILS/0/SD_ILS:766209 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mas Hafizah Jamil<br/>Author&#160;Mas Hafizah Jamil,&#160;Nur Emma Mustaffa, supervisor,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M378 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan))- Universiti Teknologi Malaysia, 2010<br/> Construction insurance ent://SD_ILS/0/SD_ILS:802502 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lim, Wan Wei, 1986-<br/>Author&#160;Lim, Wan Wei, 1986-<br/>Format:&#160;Books<br/>Call Number&#160;CP 030242 ra<br/>Publication Date&#160;2010<br/>Thesis (Master of Science (Construction Contract Management)) - Universiti Teknologi Malaysia, 2010<br/> Adequacy of contract provision in managing construction failure ent://SD_ILS/0/SD_ILS:729906 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Naadira Che Kamaruddin, 1985-<br/>Author&#160;Naadira Che Kamaruddin, 1985-,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;CP 023588 ra<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Criteria in ascertaining professional negligence ent://SD_ILS/0/SD_ILS:802250 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Abu Bakar Hassan, 1986-<br/>Author&#160;Abu Bakar Hassan, 1986-<br/>Format:&#160;Books<br/>Call Number&#160;CP 030589 ra<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Recovery of interest / financing charges due to prolongation in construction contract ent://SD_ILS/0/SD_ILS:802566 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ng, Chee Kuang<br/>Author&#160;Ng, Chee Kuang<br/>Format:&#160;Books<br/>Call Number&#160;CP 029554 ra<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> E-dispute resolution model on contractual variations ent://SD_ILS/0/SD_ILS:756206 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chong, Heap Yih, 1983-<br/>Author&#160;Chong, Heap Yih, 1983-<br/>Format:&#160;Books<br/>Call Number&#160;CP 023722 ra<br/>Publication Date&#160;2010<br/>Thesis (Ph.D (Kejuruteraan Awam)) - Universiti Teknologi Malaysia, 2010<br/> E-dispute resolution model on contractual variations ent://SD_ILS/0/SD_ILS:756205 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chong, Heap Yih, 1983-<br/>Author&#160;Chong, Heap Yih, 1983-,&#160;Rosli Mohamad Zin, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 C46 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Ph.D (Kejuruteraan Awam)) - Universiti Teknologi Malaysia, 2010<br/> Construction insurance ent://SD_ILS/0/SD_ILS:758767 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lim, Wan Wei, 1986-<br/>Author&#160;Lim, Wan Wei, 1986-,&#160;Jamaluddin Yaakob, supervisor,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 L564 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Criteria in ascertaining professional negligence ent://SD_ILS/0/SD_ILS:758988 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Abu Bakar Hassan, 1986-<br/>Author&#160;Abu Bakar Hassan, 1986-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KD2978 A28 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> The degree of performance in construction contract ent://SD_ILS/0/SD_ILS:766156 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ahmad Aza @ Azhar Amir<br/>Author&#160;Ahmad Aza @ Azhar Amir,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 A36 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Valuation of interim payment : contract terms and statutes ent://SD_ILS/0/SD_ILS:766668 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Roselan Nayan<br/>Author&#160;Roselan Nayan,&#160;Jamaluddin Yaakob, supervisor,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 R677 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> The degree of performance in construction contract ent://SD_ILS/0/SD_ILS:769124 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ahmad Aza @ Azhar Amir<br/>Author&#160;Ahmad Aza @ Azhar Amir<br/>Format:&#160;Books<br/>Call Number&#160;CP 024356 ra<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Project administration for design-build contracts : a primer for owners, engineers, and contractors ent://SD_ILS/0/SD_ILS:756006 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Koch, James Edward<br/>Author&#160;Koch, James Edward,&#160;Gransberg, Douglas D.,&#160;Molenaar, Keith R. (Keith Robert)<br/>Format:&#160;Books<br/>Call Number&#160;TH438 K63 2010<br/>Publisher&#160;ASCE Press/American Society of Civil Engineers,<br/>Publication Date&#160;2010<br/>ISBN&#160;9780784410752<br/> The implication of express provision for termination of contract due to nonpayment by employer ent://SD_ILS/0/SD_ILS:758870 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Samaila Adamu, 1969-<br/>Author&#160;Samaila Adamu, 1969-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S26 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Employer's right of set-off in construction contracts ent://SD_ILS/0/SD_ILS:758912 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chin, Kean Voon<br/>Author&#160;Chin, Kean Voon,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2010<br/> Recovery of interest / financing charges due to prolongation in construction contract ent://SD_ILS/0/SD_ILS:768775 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ng, Chee Kuang<br/>Author&#160;Ng, Chee Kuang,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N43 2011 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Uberrimae fidei in construction insurance ent://SD_ILS/0/SD_ILS:768893 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mas Hafizah Jamil<br/>Author&#160;Mas Hafizah Jamil<br/>Format:&#160;Books<br/>Call Number&#160;CP 024364 ra<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2010<br/> Valuation of interim payment-contract terms and statutes ent://SD_ILS/0/SD_ILS:769143 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Roselan Nayan<br/>Author&#160;Roselan Nayan<br/>Format:&#160;Books<br/>Call Number&#160;CP 024358 ra<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2010<br/> Standard of proof on fraud in civil proceedings and voidable construction contract ent://SD_ILS/0/SD_ILS:771167 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Azman Hamzah, 1984-<br/>Author&#160;Azman Hamzah, 1984-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 A96 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2010<br/> Instrumen yang digunakan kontraktor dalam menentukan tuntutan bayaran interim ent://SD_ILS/0/SD_ILS:781502 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Muhammad Izzat Mirza Julaihi, 1986-<br/>Author&#160;Muhammad Izzat Mirza Julaihi, 1986-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M84 2010 taf<br/>Publication Date&#160;2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/> Tender evaluation using &quot;cut-off&quot; method ent://SD_ILS/0/SD_ILS:380718 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Noorida Haswardani Nordin, 1982-<br/>Author&#160;Noorida Haswardani Nordin, 1982-,&#160;Wan Zulkifli Wan Yusuf, supervisor,&#160;Bachan Singh, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N425 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Tender evaluation using &quot;cut-off&quot; method ent://SD_ILS/0/SD_ILS:602218 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Noorida Haswardani Nordin, 1982-<br/>Author&#160;Noorida Haswardani Nordin, 1982-,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 019258 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Breaches of contract in construction industry ent://SD_ILS/0/SD_ILS:604330 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Yap, Lawrence Sie Kiong, 1985-<br/>Author&#160;Yap, Lawrence Sie Kiong, 1985-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020798 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Fair and reasonable assessment in granting extension of time ent://SD_ILS/0/SD_ILS:604334 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nor Azizan Muhamed, 1970-<br/>Author&#160;Nor Azizan Muhamed, 1970-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020790 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Extent of contractor's obligation to provide information and permitting access to his own records ent://SD_ILS/0/SD_ILS:604338 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Enegbuma Wallace Imoudu<br/>Author&#160;Enegbuma Wallace Imoudu,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020970 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Claim due to discrepancies in contract documents ent://SD_ILS/0/SD_ILS:604342 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Wan Azlina Ibrahim<br/>Author&#160;Wan Azlina Ibrahim,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 022338 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan Kontrak)) - Universiti Teknologi Malaysia, 2009<br/> The legal issues relating to retention money ent://SD_ILS/0/SD_ILS:604346 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Wee, Chiew Ang, 1975<br/>Author&#160;Wee, Chiew Ang, 1975,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 022999 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The legal status of construction work programme in the construction industry ent://SD_ILS/0/SD_ILS:604347 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Siti Fairus Othman, 1976-<br/>Author&#160;Siti Fairus Othman, 1976-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 021544 ra<br/>Publication Date&#160;2009<br/> Judicial interpretations of the term 'lump sum' in construction contract ent://SD_ILS/0/SD_ILS:604356 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Norwati Mohamad Ali, 1977-<br/>Author&#160;Norwati Mohamad Ali, 1977-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 019954 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> An approach to a fair and reasonable extension of time assessment ent://SD_ILS/0/SD_ILS:604368 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Kah Chuong<br/>Author&#160;Lee, Kah Chuong<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 024270 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The profile of construction contract termination cases ent://SD_ILS/0/SD_ILS:604371 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Roslinda Rosly<br/>Author&#160;Roslinda Rosly,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 023006 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Contractor's rights in the event employer's insolvency ent://SD_ILS/0/SD_ILS:604372 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Olivia Anak Rayeg<br/>Author&#160;Olivia Anak Rayeg,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 023118 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2009<br/> Legal effect of breach of warranty in construction insurance in Malaysia ent://SD_ILS/0/SD_ILS:604751 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mahmoud Sodangi, 1979-<br/>Author&#160;Mahmoud Sodangi, 1979-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020796 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Recoveries of differing site conditions in construction contracts ent://SD_ILS/0/SD_ILS:604733 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ong, Kuan Yuen, 1981-<br/>Author&#160;Ong, Kuan Yuen, 1981-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;TH425 O53 2008 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The application of &quot;pay when pay&quot; provisions in construction sub contract ent://SD_ILS/0/SD_ILS:604741 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nasyira Ibrahim, 1986-<br/>Author&#160;Nasyira Ibrahim, 1986-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 021532 ra<br/>Publication Date&#160;2009<br/> Contractors's application of extension of time in PAM 1998 ent://SD_ILS/0/SD_ILS:628363 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Afisza Irfan Azmi<br/>Author&#160;Afisza Irfan Azmi,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH153 A35 2009 raf<br/>Publication Date&#160;2009<br/>Thesis Sarjana Sains (Pengurusan Kontrak Pembinaan)-Universiti Teknologi Malaysia,2009<br/> Contractors's application of extension of time in PAM 1998 ent://SD_ILS/0/SD_ILS:628440 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Afisza Irfan Azmi<br/>Author&#160;Afisza Irfan Azmi,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 026213 ra<br/>Publication Date&#160;2009<br/>Thesis Sarjana Sains (Pengurusan Konrak Pembinaan)-Universiti Teknologi Malaysia,2009<br/> Dokumen Kontrak: kerja-kerja membekal, mengahantar, memasang, menguji dan mentuliah untuk pemasangan sistem lift bagi cadangan membina dan menyiapkan bangunan tambahan Fakulti Kejuruteraan Awam (RMKe-9) di Universiti Teknologi Malaysia, Skudai Johor Darul Takzim ent://SD_ILS/0/SD_ILS:807135 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;GLR Builders Sdn. Bhd,&#160;TK LIF &amp; Eskalator Sdn. Bhd<br/>Format:&#160;Books<br/>Call Number&#160;DK 0143<br/>Publication Date&#160;2009<br/> Dokumen Kontrak : kerja-kerja membekal, menghantar, memasang, menguji dan mentauliah untuk pemasangan sistem pencegah kebakaran bagi cadangan membina dan menyiapkan bangunan tambahan Fakulti Kejuruteraan Awam (RMKe-9) di Universiti Teknologi Malaysia, Skudai, Johor Darul Takzim. ent://SD_ILS/0/SD_ILS:807155 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;GLR Builders Sdn. Bhd.,&#160;KCJ Engineering Sdn. Bhd<br/>Format:&#160;Books<br/>Call Number&#160;DK 0145<br/>Publication Date&#160;2009<br/> Dokumen Kontrak: kerja-kerja membekal, menghantar, memasang, menguji dan mentauliah untuk pemasangan sistem teknologi maklumat (IT) bagi cadangan membina dan menyiapkan bangunan tambahan Fakulti Kejuruteraan Awam (RMKe-9) di Universiti Teknologi Malaysia, Skudai, Johor Darul Takzim ent://SD_ILS/0/SD_ILS:807141 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;GLR Builders Sdn. Bhd,&#160;Kemtronik Sales &amp; Service<br/>Format:&#160;Books<br/>Call Number&#160;DK 0146<br/>Publication Date&#160;2009<br/> Dokumen Kontrak : kerja-kerja membekal, menghantar, memasang, menguji dan mentauliah untuk pemasangan sistem penghawa dingin dan pengudaraan bagi cadangan membina dan menyiapkan bangunan tambahan Fakulti Kejuruteraan Awam (RMKe-9) di Universiti Teknologi Malaysia, Skudai, Johor Darul Takzim. ent://SD_ILS/0/SD_ILS:807156 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;GLR Builders Sdn. Bhd.,&#160;Kejuruteraan KMK Sdn. Bhd.<br/>Format:&#160;Books<br/>Call Number&#160;DK 0144<br/>Publication Date&#160;2009<br/> The power and authority to issue VS. to approve variation order : the legal perspective ent://SD_ILS/0/SD_ILS:758975 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Destilla Mohamad Azami, 1973-<br/>Author&#160;Destilla Mohamad Azami, 1973-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 D47 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Variation orders in design and build contracts ent://SD_ILS/0/SD_ILS:768650 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Heng, Robert Wei Kiong, 1973-<br/>Author&#160;Heng, Robert Wei Kiong, 1973-,&#160;Rosli Abdul Rashid, supervisor,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 H46 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The importance of condition of contract in contract document ent://SD_ILS/0/SD_ILS:771164 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nurulhuda Ahamad<br/>Author&#160;Nurulhuda Ahamad,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N876 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Kelewatan bayaran interim kepada kontraktor ent://SD_ILS/0/SD_ILS:780082 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Rita Minsi, 1982-<br/>Author&#160;Rita Minsi, 1982-,&#160;Rosli Abd. Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 R58 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/> Recoveries of differing site conditions in construction contracts ent://SD_ILS/0/SD_ILS:782262 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ong, Kuan Yuen, 1981-<br/>Author&#160;Ong, Kuan Yuen, 1981-,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 023085 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Dispute management in construction industry ent://SD_ILS/0/SD_ILS:597946 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chai, Chang Sa'ar<br/>Author&#160;Chai, Chang Sa'ar,&#160;Aminah Md Yusof, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 026229 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The enforceability of liquidated and ascertained damages in construction contract ent://SD_ILS/0/SD_ILS:604389 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chia, Eunice Mei Ling, 1985-<br/>Author&#160;Chia, Eunice Mei Ling, 1985-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020802 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Notice of loss and / or expense claim in PAM 2006 ent://SD_ILS/0/SD_ILS:604377 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Titus, Olalekan Olaolu, 1979-<br/>Author&#160;Titus, Olalekan Olaolu, 1979-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020680 ra<br/>Publication Date&#160;2009<br/> Letter of acceptance award as an unqualified acceptance ent://SD_ILS/0/SD_ILS:604453 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Yow, Li Ping, 1983-<br/>Author&#160;Yow, Li Ping, 1983-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;TH42 Y684 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Contractor's right to claim for extra works ent://SD_ILS/0/SD_ILS:604469 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Yap, Chiaw Guan, 1985-<br/>Author&#160;Yap, Chiaw Guan, 1985-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 019959 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Rescission, variation and waiver of contract ent://SD_ILS/0/SD_ILS:604470 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Zuhaili Mohamad Ramly, 1984-<br/>Author&#160;Zuhaili Mohamad Ramly, 1984-,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 021772 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2009<br/> Fair and reasonable assessment in granting extension of time ent://SD_ILS/0/SD_ILS:399417 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nor Azizan Muhamed, 1970-<br/>Author&#160;Nor Azizan Muhamed, 1970-,&#160;Maizon Hashim, supervisor,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KPG2590.A31994 N39 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Extent of contractor's obligation to provide information and permitting access to his own records ent://SD_ILS/0/SD_ILS:399486 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Enegbuma Wallace Imoudu<br/>Author&#160;Enegbuma Wallace Imoudu,&#160;Norazam Othman, supervisor,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 E534 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Claims due to discrepancies in contract documents ent://SD_ILS/0/SD_ILS:399502 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Wan Azlina Ibrahim<br/>Author&#160;Wan Azlina Ibrahim,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 W364 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The legal issues relating to retention money ent://SD_ILS/0/SD_ILS:399550 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Wee, Chiew Ang, 1975<br/>Author&#160;Wee, Chiew Ang, 1975,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.M35 W44 2009 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The legal status of construction work programme in the construction industry ent://SD_ILS/0/SD_ILS:399552 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Siti Fairus Othman, 1976-<br/>Author&#160;Siti Fairus Othman, 1976-,&#160;Nur Emma Mustaffa, supervisor,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 S42 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2009<br/> An approach to a fair and reasonable extension of time assessment ent://SD_ILS/0/SD_ILS:399654 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Kah Chuong<br/>Author&#160;Lee, Kah Chuong,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;KPG2590.A31994 L33 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The profile of construction contract termination cases ent://SD_ILS/0/SD_ILS:399661 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Roslinda Rosly<br/>Author&#160;Roslinda Rosly,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH435 R674 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Contractor's rights in the event of employer's insolvency ent://SD_ILS/0/SD_ILS:399665 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Olivia Rayeg<br/>Author&#160;Olivia Rayeg,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 O45 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Letter of acceptance award as an unqualified acceptance ent://SD_ILS/0/SD_ILS:400028 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Yow, Li Ping, 1983-<br/>Author&#160;Yow, Li Ping, 1983-,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 023032 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Contractor's right to claim for extra works ent://SD_ILS/0/SD_ILS:400098 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Yap, Chiaw Guan, 1985-<br/>Author&#160;Yap, Chiaw Guan, 1985-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 Y36 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The application of &quot;pay when pay&quot; provisions in construction sub contract ent://SD_ILS/0/SD_ILS:401978 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nasyira Ibrahim, 1986-<br/>Author&#160;Nasyira Ibrahim, 1986-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N37 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Legal effect of breach of warranty in construction insurance in Malaysia ent://SD_ILS/0/SD_ILS:402035 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mahmoud Sodangi, 1979-<br/>Author&#160;Mahmoud Sodangi, 1979-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;HG8053.7 M33 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Time essence and termination in construction contract ent://SD_ILS/0/SD_ILS:402040 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Liew, Li Ming<br/>Author&#160;Liew, Li Ming,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 L53 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Breaches of contract in construction industry ent://SD_ILS/0/SD_ILS:399380 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Yap, Lawrence Sie Kiong, 1985-<br/>Author&#160;Yap, Lawrence Sie Kiong, 1985-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 Y364 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Judicial interpretations of the term 'lump sum' in construction contract ent://SD_ILS/0/SD_ILS:399589 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Norwati Mohamad Ali, 1977-<br/>Author&#160;Norwati Mohamad Ali, 1977-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 N67 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Notice of loss and / or expense claim in PAM 2006 ent://SD_ILS/0/SD_ILS:399680 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Titus, Olalekan Olaolu, 1979-<br/>Author&#160;Titus, Olalekan Olaolu, 1979-,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 T57 2009 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The enforceability of liquidated and ascertained damages in construction contract ent://SD_ILS/0/SD_ILS:399732 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chia, Eunice Mei Ling, 1985-<br/>Author&#160;Chia, Eunice Mei Ling, 1985-,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 C44 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Payment dilemma for sub contractors ent://SD_ILS/0/SD_ILS:399736 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Farihan Mohd. Rafie<br/>Author&#160;Farihan Mohd. Rafie,&#160;Rosli Abdul Rashid, supervisor,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 F376 2009 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2009<br/> Rescission, variation and waiver of contract ent://SD_ILS/0/SD_ILS:400108 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Zuhaili Mohamad Ramly, 1984-<br/>Author&#160;Zuhaili Mohamad Ramly, 1984-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 Z83 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2009<br/> Evaluating contract claims ent://SD_ILS/0/SD_ILS:290068 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Davison, R. Peter<br/>Author&#160;Davison, R. Peter,&#160;Mullen, John, 1959-<br/>Format:&#160;Books<br/>Call Number&#160;TH425 D38 2009<br/>Edition&#160;2nd ed.<br/>Publisher&#160;John Wiley,<br/>Publication Date&#160;2009<br/>ISBN&#160;9781405159203<br/> Tuntutan bayaran oleh kontraktor dalam kerja pembinaan ent://SD_ILS/0/SD_ILS:302986 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ng, Angela Shin Yii<br/>Author&#160;Ng, Angela Shin Yii,&#160;Kherun Nita Ali, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N424 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/> Dispute management in construction industry ent://SD_ILS/0/SD_ILS:362054 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chai, Chang Sa'ar<br/>Author&#160;Chai, Chang Sa'ar,&#160;Aminah Md Yusof, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH425 C434 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan))- Universiti Teknologi Malaysia, 2009<br/> Risiko yang ditanggung oleh kontraktor dalam pelaksanaan kontrak reka dan bina ent://SD_ILS/0/SD_ILS:303238 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Arif Abdullah<br/>Author&#160;Arif Abdullah<br/>Format:&#160;Books<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/> The causes and impact of poor construction documentation in construction organizations ent://SD_ILS/0/SD_ILS:226614 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd. Kamarul Izwan Zainal Abidin, 1980-<br/>Author&#160;Mohd. Kamarul Izwan Zainal Abidin, 1980-,&#160;Rosli Mohamad Zin, supervisor<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 M634 2008<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Causes and steps to minimize variations in construction projects ent://SD_ILS/0/SD_ILS:234249 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ahmad Zaki Ali<br/>Author&#160;Ahmad Zaki Ali<br/>Format:&#160;Books<br/>Call Number&#160;TH438 A924 2008<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Keusahawanan Teknologi Maklumat)) - Universiti Teknologi Malaysia, 2008<br/> The extension of time award in relation to direct loss and or expense claim ent://SD_ILS/0/SD_ILS:249202 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Muhammad Zahid Mardzuki<br/>Author&#160;Muhammad Zahid Mardzuki<br/>Format:&#160;Books<br/>Call Number&#160;K840 M83 2008<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Implikasi lanjutan masa terhadap kontraktor dan klien ent://SD_ILS/0/SD_ILS:253361 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nik Alyatul Aqilah Zahri<br/>Author&#160;Nik Alyatul Aqilah Zahri,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N54 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Kajian ke atas penggunaan harga cut-off dalam sistem penilaian tender Jabatan Kerja Raya ent://SD_ILS/0/SD_ILS:253745 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Siti Norbaya Alias<br/>Author&#160;Siti Norbaya Alias,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S576 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> International form of contract : user guide, the purple book ent://SD_ILS/0/SD_ILS:372619 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Wright, David<br/>Author&#160;Wright, David,&#160;Institution of Chemical Engineers (Great Britain)<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 W75 2008 f<br/>Edition&#160;1st ed.<br/>Publisher&#160;Institution of Chemical Engineers,<br/>Publication Date&#160;2008<br/>ISBN&#160;9780852955178<br/> Dispute boards : procedures and practice ent://SD_ILS/0/SD_ILS:641431 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Owen, Gwyn (Gwyn Peredur), 1951-<br/>Author&#160;Owen, Gwyn (Gwyn Peredur), 1951-,&#160;Totterdill, Brian W.<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 O95 2008<br/>Publisher&#160;Thomas Telford ; Distributors, USA, ASCE Press,<br/>Publication Date&#160;2008<br/>ISBN&#160;9780727735089<br/> The causes and impact of poor construction documentation in construction organizations ent://SD_ILS/0/SD_ILS:580007 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd. Kamarul Izwan Zainal Abidin, 1980-<br/>Author&#160;Mohd. Kamarul Izwan Zainal Abidin, 1980-,&#160;Rosli Mohamad Zin, supervisor<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 015364<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Causes and steps to minimize variations in construction projects ent://SD_ILS/0/SD_ILS:580576 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Ahmad Zaki Ali<br/>Author&#160;Ahmad Zaki Ali<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 015053<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Keusahawanan Teknologi Maklumat)) - Universiti Teknologi Malaysia, 2008<br/> Novation agreement in design and build contracts ent://SD_ILS/0/SD_ILS:590495 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Natasha Sahil<br/>Author&#160;Natasha Sahil,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020899 ra<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Dispute avoidance : a non-confrantational approach to the management of construction contracts ent://SD_ILS/0/SD_ILS:395666 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Morgan, D. Brian<br/>Author&#160;Morgan, D. Brian<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 M67 2008<br/>Publisher&#160;RIBA Enterprises,<br/>Publication Date&#160;2008<br/>ISBN&#160;9781859462973<br/> The law and business of international project finance ent://SD_ILS/0/SD_ILS:387338 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Hoffman, Scott L., 1957-<br/>Author&#160;Hoffman, Scott L., 1957-<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 H63 2008<br/>Edition&#160;3rd ed.<br/>Publisher&#160;Cambridge University Press,<br/>Publication Date&#160;2008<br/>ISBN&#160;9780521882200<br/> Differing site condition ent://SD_ILS/0/SD_ILS:303675 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Faraziera Mohd. Raslim, 1983-<br/>Author&#160;Faraziera Mohd. Raslim, 1983-,&#160;Nur Emma Mustaffa, supervisor,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 F375 2008<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> The unsuccesful reasons of set-off in construction contract ent://SD_ILS/0/SD_ILS:304009 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nor Azlina Ismail, 1983-<br/>Author&#160;Nor Azlina Ismail, 1983-,&#160;Jamaluddin Yaakob, supervisor,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N678 2008<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Main contractor's entitlement to an extension of time due to concurrent delay ent://SD_ILS/0/SD_ILS:304064 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Airennizah Othman, 1985-<br/>Author&#160;Airennizah Othman, 1985-,&#160;Nur Emma Mustaffa, supervisor,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 A374 2008<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Construction delays : extensions of time and prolongation claims ent://SD_ILS/0/SD_ILS:298171 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Gibson, Roger, 1944-<br/>Author&#160;Gibson, Roger, 1944-<br/>Format:&#160;Books<br/>Call Number&#160;TH438.4 G52 2008<br/>Publisher&#160;Routledge,<br/>Publication Date&#160;2008<br/>ISBN&#160;9780415345866<br/> Payment issues of architect's professional fees ent://SD_ILS/0/SD_ILS:303678 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohd. Yusri Mohd. Ripin, 1976-<br/>Author&#160;Mohd. Yusri Mohd. Ripin, 1976-,&#160;Norazam Othman, supervisor,&#160;Maizon Hashim, supervisor<br/>Format:&#160;Books<br/>Call Number&#160;TH425 M98 2008 raf<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Contractor right of action against architect or engineer for negligence ent://SD_ILS/0/SD_ILS:303792 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nur Farahah Che Nu, 1985-<br/>Author&#160;Nur Farahah Che Nu, 1985-,&#160;Rosli Abdul Rashid, supervisor,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N875 2008<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Novation agreement in design and build contracts ent://SD_ILS/0/SD_ILS:251335 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Natasha Sahil<br/>Author&#160;Natasha Sahil,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N37 2008<br/>Publication Date&#160;2008<br/><a href="http://eprints.utm.my/5908">Full text thesis via UTM-IR</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Kesan kelewatan pembayaran terhadap aliran tunai kontraktor ent://SD_ILS/0/SD_ILS:254772 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Siti Haizan Azmi<br/>Author&#160;Siti Haizan Azmi,&#160;Razali Adul Hamid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S575 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Masa yang diperlukan oleh jurukur bahan untuk menyediakan dokumen tender berkuantiti ent://SD_ILS/0/SD_ILS:254784 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Teo, Yiien Yiik<br/>Author&#160;Teo, Yiien Yiik,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH425 T464 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Performance bond : conditional or unconditional ent://SD_ILS/0/SD_ILS:198089 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Azizan Supardi<br/>Author&#160;Azizan Supardi,&#160;Jamaluddin Yaakob,&#160;Nur Emma Mustaffa,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 A94 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Clarity of construction contract ent://SD_ILS/0/SD_ILS:196207 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chong, Heap Yih<br/>Author&#160;Chong, Heap Yih,&#160;Rosli Mohamad Zin, supervisor<br/>Format:&#160;Books<br/>Call Number&#160;TH425 C465 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> The effect to the termination of letter of intent in construction contract ent://SD_ILS/0/SD_ILS:198442 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Mohamad Zaidi Mohamed Saad<br/>Author&#160;Mohamad Zaidi Mohamed Saad<br/>Format:&#160;Books<br/>Call Number&#160;TH 425 M924 2007<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> The legal aspect of procurement system : doctrine of variation order with respect to design and build procurement system ent://SD_ILS/0/SD_ILS:200509 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Masidah Abdul Majid<br/>Author&#160;Masidah Abdul Majid<br/>Format:&#160;Books<br/>Call Number&#160;TH 425 M375 2007 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> The conclusiveness of final certificates ent://SD_ILS/0/SD_ILS:148989 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Tan, Ee Leen<br/>Author&#160;Tan, Ee Leen<br/>Format:&#160;Books<br/>Call Number&#160;TA210 T367 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Letter of intent and standard form of builiding contract ent://SD_ILS/0/SD_ILS:149018 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Hamizah Liyana Tajul Ariffin<br/>Author&#160;Hamizah Liyana Tajul Ariffin<br/>Format:&#160;Books<br/>Call Number&#160;TH153 H35 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Arbitration : challenging the arbitral awards (Certiorari) ent://SD_ILS/0/SD_ILS:149022 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Norhafizah Yusop<br/>Author&#160;Norhafizah Yusop<br/>Format:&#160;Books<br/>Call Number&#160;TA210 N679 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Principles of implied terms in construction contracts ent://SD_ILS/0/SD_ILS:149029 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Cen Ying<br/>Author&#160;Lee, Cen Ying<br/>Format:&#160;Books<br/>Call Number&#160;TH425 L437 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Joinder and consolidation provisions in arbitration ent://SD_ILS/0/SD_ILS:149036 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Yong, Felicia Yan Yan<br/>Author&#160;Yong, Felicia Yan Yan<br/>Format:&#160;Books<br/>Call Number&#160;TA210 Y66 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Construction law and management ent://SD_ILS/0/SD_ILS:162331 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Russell, Victoria<br/>Author&#160;Russell, Victoria,&#160;Gould, Nicholas<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 R87 2007<br/>Publisher&#160;Informa Law,<br/>Publication Date&#160;2007<br/>ISBN&#160;9781843116714<br/> Basics tendering ent://SD_ILS/0/SD_ILS:183651 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Brandt, Tim<br/>Author&#160;Brandt, Tim,&#160;Franssen, Sebastian Th<br/>Format:&#160;Books<br/>Call Number&#160;TH425 B72 2007<br/>Publisher&#160;Birkhauser Verlag,<br/>Publication Date&#160;2007<br/>ISBN&#160;9783764381103<br/> Summary judgement in construction contract ent://SD_ILS/0/SD_ILS:148992 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Zukfli Sapeciay<br/>Author&#160;Zukfli Sapeciay<br/>Format:&#160;Books<br/>Call Number&#160;TH425 Z845 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Kaedah-kaedah analisis kelewatan dan penggunaannya dalam industri pembinaan ent://SD_ILS/0/SD_ILS:149376 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Wan Noor Solehha Wan Nik<br/>Author&#160;Wan Noor Solehha Wan Nik<br/>Format:&#160;Books<br/>Call Number&#160;TH425 W36 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Etika menender : tinjauan terhadap pandangan dan praktis juruukur bahan di Malaysia ent://SD_ILS/0/SD_ILS:149668 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Nurul Atiqah Rosli<br/>Author&#160;Nurul Atiqah Rosli<br/>Format:&#160;Books<br/>Call Number&#160;TH425 N874 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Keupayaan firma juruukur bahan untuk melaksanakan sistem e - tender ent://SD_ILS/0/SD_ILS:149688 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Yip, Kiat Sum<br/>Author&#160;Yip, Kiat Sum<br/>Format:&#160;Books<br/>Call Number&#160;TH425 Y56 2004<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> A repudiatory breach in the construction industry : non-payment ent://SD_ILS/0/SD_ILS:155298 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Shih Yin<br/>Author&#160;Lee, Shih Yin<br/>Format:&#160;Books<br/>Call Number&#160;TH425 L45 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=49122">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Challenges to the adjudicator's decision ent://SD_ILS/0/SD_ILS:155345 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Tan, Sean Git<br/>Author&#160;Tan, Sean Git<br/>Format:&#160;Books<br/>Call Number&#160;TA210 T368 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=48828">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Judicial interpretations on the phrase 'regulary and diligently' in construction industry ent://SD_ILS/0/SD_ILS:155357 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Shiau Mei<br/>Author&#160;Lee, Shiau Mei,&#160;Norazam Othman, supervisor<br/>Format:&#160;Books<br/>Call Number&#160;TH425 L43 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains Construction Contract Management) - Fakulti Alam Bina, Universiti Teknologi Malaysia, 2007<br/> Ganti rugi tertentu dan ditetapkan serta kerugian majikan ent://SD_ILS/0/SD_ILS:119952 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;P.Vickraman Prosothman<br/>Author&#160;P.Vickraman Prosothman<br/>Format:&#160;Books<br/>Call Number&#160;TH432 P84 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Letter of intent and standard form of builiding contract ent://SD_ILS/0/SD_ILS:783114 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Hamizah Liyana Tajul Ariffin<br/>Author&#160;Hamizah Liyana Tajul Ariffin,&#160;Hamizah Liyana Tajul Ariffin,&#160;Fakulti Geoinformasi dan Harta Tanah<br/>Format:&#160;Books<br/>Call Number&#160;MFL 014474 ra<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> A repudiatory breach in the construction industry : non-payment ent://SD_ILS/0/SD_ILS:784690 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Shih Yin<br/>Author&#160;Lee, Shih Yin,&#160;Fakulti Alam Bina<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 014662 ra<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Clarity of construction contract ent://SD_ILS/0/SD_ILS:576529 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chong, Heap Yih<br/>Author&#160;Chong, Heap Yih,&#160;Rosli Mohamad Zin, supervisor<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 015122<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> The conclusiveness of final certificates ent://SD_ILS/0/SD_ILS:567451 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Tan, Ee Leen<br/>Author&#160;Tan, Ee Leen<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 013505<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Summary judgement in construction contract ent://SD_ILS/0/SD_ILS:567453 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Zukfli Sapeciay<br/>Author&#160;Zukfli Sapeciay<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 013465 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Letter of intent and standard form of builiding contract ent://SD_ILS/0/SD_ILS:567458 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Hamizah Liyana Tajul Ariffin<br/>Author&#160;Hamizah Liyana Tajul Ariffin<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 0130123<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Arbitration : challenging the arbitral awards (Certiorari) ent://SD_ILS/0/SD_ILS:567459 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Norhafizah Yusop<br/>Author&#160;Norhafizah Yusop<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 013504<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Principles of implied terms in construction contracts ent://SD_ILS/0/SD_ILS:567460 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Cen Ying<br/>Author&#160;Lee, Cen Ying<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 013514 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Joinder and consolidation provisions in arbitration ent://SD_ILS/0/SD_ILS:567462 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Yong, Felicia Yan Yan<br/>Author&#160;Yong, Felicia Yan Yan<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 013431<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> A repudiatory breach in the construction industry non-payment ent://SD_ILS/0/SD_ILS:568074 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Shih Yin<br/>Author&#160;Lee, Shih Yin<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 013516<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Challenges to the adjudicator's decision ent://SD_ILS/0/SD_ILS:568082 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Tan, Sean Git<br/>Author&#160;Tan, Sean Git<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 015194<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Judicial interpretations on the phrase 'regulary and diligently' in construction industry ent://SD_ILS/0/SD_ILS:568084 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Shiau Mei<br/>Author&#160;Lee, Shiau Mei<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 013447<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Performance bond : conditional or unconditional ent://SD_ILS/0/SD_ILS:576611 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Azizan Supardi<br/>Author&#160;Azizan Supardi,&#160;Jamaluddin Yaakob,&#160;Nur Emma Mustaffa,&#160;Fakulti Alam Bina<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 015027<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> International forms of contract : reimbursable contracts ent://SD_ILS/0/SD_ILS:372613 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Institution of Chemical Engineers<br/>Author&#160;Institution of Chemical Engineers<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 I36 2007 f<br/>Edition&#160;1st ed.<br/>Publisher&#160;Institution of Chemical Engineers,<br/>Publication Date&#160;2007<br/>ISBN&#160;9780852955116<br/> International forms of contract : target cost contracts ent://SD_ILS/0/SD_ILS:372631 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Institution of Chemical Engineers (Great Britain)<br/>Author&#160;Institution of Chemical Engineers (Great Britain)<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 I58 2007 f<br/>Publisher&#160;Institution of Chemical Engineers,<br/>Publication Date&#160;2007<br/>ISBN&#160;9780852955123<br/> Direct loss and expense relating to remoteness of damages ent://SD_ILS/0/SD_ILS:110398 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Xia Sheng<br/>Author&#160;Lee, Xia Sheng<br/>Format:&#160;Books<br/>Call Number&#160;TH425.L436 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=37069">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/> Liquidated and ascertained damage (LAD) and requirements of mitigation ent://SD_ILS/0/SD_ILS:111336 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Yong, Mei Lee<br/>Author&#160;Yong, Mei Lee<br/>Format:&#160;Books<br/>Call Number&#160;KD164.Y66 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=37489">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/> Tahap kecekapan pengurusan kontrak oleh kontraktor bumiputera di Johor ent://SD_ILS/0/SD_ILS:126229 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Siti Nuradlina Abdul Aziz<br/>Author&#160;Siti Nuradlina Abdul Aziz<br/>Format:&#160;Books<br/>Call Number&#160;TH425 S574 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> Pendekatan bagi memastikan kontrak digubal dengan jelas ent://SD_ILS/0/SD_ILS:8558 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Cen Ying<br/>Author&#160;Lee, Cen Ying<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13570<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> Analisis prestasi kontraktor penyenggaraan telekomunikasi ent://SD_ILS/0/SD_ILS:9129 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Amiruddin Mat Amin<br/>Author&#160;Amiruddin Mat Amin<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13632<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Sains (Bangunan) - Universiti Teknologi Malaysia, 2006<br/> Pembayaran interim hak-hak kontraktor ent://SD_ILS/0/SD_ILS:9142 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Estelle, Liew Swee Ling<br/>Author&#160;Estelle, Liew Swee Ling<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13572<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> FIDIC user's guide : a practical guide to the 1999 red and yellow books ent://SD_ILS/0/SD_ILS:167667 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Totterdill, Brian W.<br/>Author&#160;Totterdill, Brian W.,&#160;International Federation of Consulting Engineers<br/>Format:&#160;Books<br/>Call Number&#160;K891.B8 F54 2006<br/>Publisher&#160;Thomas Telford,<br/>Publication Date&#160;2006<br/>ISBN&#160;9780727734419<br/> Contruction contracts dictionary ent://SD_ILS/0/SD_ILS:151673 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Chow, Fong Kok<br/>Author&#160;Chow, Fong Kok<br/>Format:&#160;Books<br/>Call Number&#160;TH425 C464 2006<br/>Publisher&#160;Sweet and Maxwell Asia,<br/>Publication Date&#160;2006<br/>ISBN&#160;9789810548674<br/> Voidable and void construction contracts ent://SD_ILS/0/SD_ILS:112444 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Yow, Kah Lun<br/>Author&#160;Yow, Kah Lun<br/>Format:&#160;Books<br/>Call Number&#160;KF905 Y68 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=44926">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Binaan))- Universiti Teknologi Malaysia, 2006<br/> Partnering in the construction industry : a code of practice for strategic collaborative working ent://SD_ILS/0/SD_ILS:129813 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Bennett, John, 1936-<br/>Author&#160;Bennett, John, 1936-,&#160;Peace, Sarah,&#160;Chartered Institute of Building (Great Britain)<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 P374 2006 f<br/>Publisher&#160;Butterworth-Heinemann,<br/>Publication Date&#160;2006<br/>ISBN&#160;9780750664981<br/> Direct loss and expense relating to remoteness of damages ent://SD_ILS/0/SD_ILS:562092 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Lee, Xia Sheng<br/>Author&#160;Lee, Xia Sheng<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 012488<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/> Liquidated and ascertained damage (LAD) and requirements of mitigation ent://SD_ILS/0/SD_ILS:562408 2024-05-02T20:30:06Z 2024-05-02T20:30:06Z by&#160;Yong, Mei Lee<br/>Author&#160;Yong, Mei Lee<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 12384<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/>