Search Results for Assembly-line balancing - Narrowed by: Efficiency, Industrial - Industrial productivity SirsiDynix Enterprise http://portal.utm.my/client/en_AU/main/main/qu$003dAssembly-line$002bbalancing$0026qf$003dSUBJECT$002509Subject$002509Efficiency$00252C$002bIndustrial$002509Efficiency$00252C$002bIndustrial$0026qf$003dSUBJECT$002509Subject$002509Industrial$002bproductivity$002509Industrial$002bproductivity$0026ps$003d300?dt=list 2024-06-04T13:59:15Z Productivity improvement through method study and line balancing in an electronic company ent://SD_ILS/0/SD_ILS:417850 2024-06-04T13:59:15Z 2024-06-04T13:59:15Z by&#160;Melissa Menaha Sundram<br/>Author&#160;Melissa Menaha Sundram<br/>Format:&#160;Books<br/>Call Number&#160;T58.8 M44 2004<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Project Paper (Bachelor of Mechanical Engineering (Industrial)) - Universiti Teknologi Malaysia, 2004<br/> Kesan fasa a-AL di dalam aloi AL-SI yang diubahsuai dengan strontium ke atas sifat mekaniknya ent://SD_ILS/0/SD_ILS:7891 2024-06-04T13:59:15Z 2024-06-04T13:59:15Z by&#160;Azlina Ishak<br/>Author&#160;Azlina Ishak<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13209<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Project Paper (Sarjana Muda Kejuruteraan Mekanikal (Bahan)) - Universiti Teknologi Malaysia, 2004<br/> Energy study for a shopping complex ent://SD_ILS/0/SD_ILS:7101 2024-06-04T13:59:15Z 2024-06-04T13:59:15Z by&#160;Wan Mohd Rusdi Wan Abd. Razak<br/>Author&#160;Wan Mohd Rusdi Wan Abd. Razak<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12703<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Bachelor of Mechanical Engineering) - Universiti Teknologi Malaysia, 2003<br/> Productivity improvement in final assembly line by using lean manufacturing concepts ent://SD_ILS/0/SD_ILS:361123 2024-06-04T13:59:15Z 2024-06-04T13:59:15Z by&#160;Rudi Abd. Rasid<br/>Author&#160;Rudi Abd. Rasid<br/>Format:&#160;Books<br/>Call Number&#160;TS178.5 R82 2003<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Bachelor of Mechanical Engineering (Industrial)) - Universiti Teknologi Malaysia, 2003<br/> Productivity improvement through line balancing ent://SD_ILS/0/SD_ILS:345132 2024-06-04T13:59:15Z 2024-06-04T13:59:15Z by&#160;Lim, Chien Koon<br/>Author&#160;Lim, Chien Koon<br/>Format:&#160;Books<br/>Call Number&#160;TS178.5 L55 2003<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Bachelor of Mechanical Engineering) - Universiti Teknologi Malaysia, 2003<br/> Salt water modeling of smoke flow in a typical 2 storey terrace house ent://SD_ILS/0/SD_ILS:7242 2024-06-04T13:59:15Z 2024-06-04T13:59:15Z by&#160;Ng, Chee Sing<br/>Author&#160;Ng, Chee Sing<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12688<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Bachelor of Mechanical Engineering) - Universiti Teknologi Malaysia, 2003<br/> Productivity improvement in a large manufacturing company ent://SD_ILS/0/SD_ILS:479406 2024-06-04T13:59:15Z 2024-06-04T13:59:15Z by&#160;Loh, Khim Lang<br/>Author&#160;Loh, Khim Lang<br/>Format:&#160;Books<br/>Call Number&#160;TS178.5 L63 1998 raf<br/>Publisher&#160;UTM,<br/>Publication Date&#160;1998<br/>Project Paper (Bachelor of Mechanical Engineering) - Universiti Teknologi Malaysia, 1998<br/> Sistem kualiti di kilang elektronik kearah piawaian ISO 9002 : satu pengenalan ... [et al.] ent://SD_ILS/0/SD_ILS:7900 2024-06-04T13:59:15Z 2024-06-04T13:59:15Z by&#160;Ahmad Kamil Harun<br/>Author&#160;Ahmad Kamil Harun,&#160;Loh, Khim Lang,&#160;Lau, Chun Siang,&#160;Rulhassan Salleh,&#160;Hamimah Mamat<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 9628 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1997<br/>Kertas projek (Sarjana Muda Kejuruteraan Mekanikal) - Universiti Teknologi Malaysia, 1997<br/> A study on productivity improvement for a manufacturing factory : case study at Lucas Automotive Sdn Bhd ent://SD_ILS/0/SD_ILS:162318 2024-06-04T13:59:15Z 2024-06-04T13:59:15Z by&#160;Ng, Tyan Yong<br/>Author&#160;Ng, Tyan Yong<br/>Format:&#160;Books<br/>Call Number&#160;TS178.5.N79 1993 raf<br/>Publisher&#160;UTM,<br/>Publication Date&#160;1993<br/>Project paper (Bachelor of Mechanical Engineering) - Universiti Teknologi Malaysia, 1993<br/> A study of productivity improvement for a manufacturing factory : case study at Lucas Automotive Sdn Bhd ; Computer aided nesting for sheet metal work ; Development of postprocessing for CNC machine tools ; The integration of design and manufacturing functions using design-with-features approach for rotational machined components ; The feature recognition approach for prismatic machined components ent://SD_ILS/0/SD_ILS:14884 2024-06-04T13:59:15Z 2024-06-04T13:59:15Z by&#160;Ng, Tyan Yong<br/>Author&#160;Ng, Tyan Yong,&#160;Ooi, Tsin-Tsung,&#160;Tan, Kim Thin,&#160;Wong, Sau Hoong,&#160;Yeoh, Hin Seng<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 8243 ra<br/>Publisher&#160;UTM,<br/>Publication Date&#160;1993<br/>Project paper (Bachelor of Mechanical Engineering) - Universiti Teknologi Malaysia, 1993<br/>