Search Results for Buildings -- Cost of construction - Narrowed by: Closed Access Thesis SirsiDynix Enterprise http://portal.utm.my/client/en_AU/main/main/qu$003dBuildings$002b--$002bCost$002bof$002bconstruction$0026qf$003dITYPE$002509Material$002bType$0025091$00253ACLS_THESIS$002509Closed$002bAccess$002bThesis$0026ic$003dtrue$0026ps$003d300$0026isd$003dtrue?dt=list 2024-06-18T12:22:45Z Cost benefit analysis of implementing the green roof at Straits View 18 apartment ent://SD_ILS/0/SD_ILS:885311 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Irfah Zulaikha Ismail, 1996-, author<br/>Author&#160;Irfah Zulaikha Ismail, 1996-, author,&#160;Shazmin Shareena Ab. Azis, supervisor,&#160;Fakulti Alam Bina dan Ukur<br/>Format:&#160;Books<br/>Call Number&#160;TH880 I74 2019 raf<br/>Publication Date&#160;2019<br/>Thesis (Sarjana Muda Sains (Pengurusan Harta Tanah)) - Universiti Teknologi Malaysia, 2019<br/> The cost benefits of building information modeling (BIM) in Malaysian construction industry ent://SD_ILS/0/SD_ILS:869688 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Chin, Li Wei, 1991- , author<br/>Author&#160;Chin, Li Wei, 1991- , author,&#160;Chai, Chang Sa'ar, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;XX(869688.1)<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> The awareness of post-tension slab implementation for building construction at Malaysia northern region ent://SD_ILS/0/SD_ILS:862326 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Yeoh Gim Heng, 1976-<br/>Author&#160;Yeoh Gim Heng, 1976-,&#160;Nazri Ali, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;XX(862326.1)<br/>Publication Date&#160;2016<br/>Thesis (Sarjana Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2017<br/> Assessment of factors affecting the contractor cost overrun of building construction projects ent://SD_ILS/0/SD_ILS:821566 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Abdulrahman Haruna, 1985-<br/>Author&#160;Abdulrahman Haruna, 1985-,&#160;Bachan Singh, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 A23 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Post-tensioned infills effect on lateral resistance of industrialized building system ent://SD_ILS/0/SD_ILS:821466 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Bashar Hassen Mohammed, 1976-<br/>Author&#160;Bashar Hassen Mohammed, 1976-,&#160;Abdul Kadir Marsono,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH1000 B37 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Struktur)) - Universiti Teknologi Malaysia, 2014<br/>This title is Classified as an Open Access starting from 16/7/2019<br/> Time and cost overrun of construction projects in Malaysia ent://SD_ILS/0/SD_ILS:800915 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Mehdi Hassaniavarzaman, 1987-<br/>Author&#160;Mehdi Hassaniavarzaman, 1987-,&#160;Abdul Kadir Marsono,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 M44 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> An evaluation of effectiveness of approximate quantity method in estimating construction cost ent://SD_ILS/0/SD_ILS:820128 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Siew, Sik Nguong, 1989-<br/>Author&#160;Siew, Sik Nguong, 1989-,&#160;Khairulzan Yahya, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH435 S54 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> The cost overruns in green building development : case study Ministry of Public Works new green building project Republic of Indonesia ent://SD_ILS/0/SD_ILS:799676 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Anggoro Putro, 1983-<br/>Author&#160;Anggoro Putro, 1983-,&#160;Zakaria Yusoff, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH880 A544 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Comparing conventional to industrialised building system construction costing : a case study of school building projects ent://SD_ILS/0/SD_ILS:775671 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Zuraidah Abdul Aziz, 1985-<br/>Author&#160;Zuraidah Abdul Aziz, 1985-,&#160;Abdul Kadir Marsono,&#160;Masine Md. Tap, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH437 Z87 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Ultimate strength of post-tension hollow IBS slabs ent://SD_ILS/0/SD_ILS:758334 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Armin Ghadiri, 1985-<br/>Author&#160;Armin Ghadiri, 1985-,&#160;Abdul Kadir Marsono,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TA683.5.S4 A76 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Kejuruteraan (Awam - Struktur)) - Universiti Teknologi Malaysia, 2011<br/> A framework for cost assessment of QMS for building contractors based on biological immune system ent://SD_ILS/0/SD_ILS:362087 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Keyvanfar, Ali, 1981-<br/>Author&#160;Keyvanfar, Ali, 1981-,&#160;Abdul Kadir Marsono,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH435 A44 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Impact of cement shortage and methods used by contractors to overcome it ent://SD_ILS/0/SD_ILS:302981 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Chua, Simon Soon Hua<br/>Author&#160;Chua, Simon Soon Hua,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA403.6 C82 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/> Maintenance costs of mosque ent://SD_ILS/0/SD_ILS:240704 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Khairatunnisa Mokhtar<br/>Author&#160;Khairatunnisa Mokhtar,&#160;Shaiful Amri Mansur, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH3351 K435 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2008<br/> The usage of tender price index and building material cost index ent://SD_ILS/0/SD_ILS:247372 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Lee, Chee Wey<br/>Author&#160;Lee, Chee Wey,&#160;Fadhlin Abdullah,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 L43 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Kos kitaran hayat bagi bangunan dewan kuliah ent://SD_ILS/0/SD_ILS:253353 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Roslinda Rosly<br/>Author&#160;Roslinda Rosly,&#160;Razali Adul Hamid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH437 R674 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Kriteria penentuan kos dan item-item kos signifikan bagi pemasaran lif penumpang pada bangunan pejabat ent://SD_ILS/0/SD_ILS:194823 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Al Nurzira Johari<br/>Author&#160;Al Nurzira Johari<br/>Format:&#160;Books<br/>Call Number&#160;TJ1372 A46 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Significant usage of slab and wall from technique in industrialised building system (IBS) for low cost high - rise apartments construction ent://SD_ILS/0/SD_ILS:106569 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Redzuan Ab. Rahman<br/>Author&#160;Redzuan Ab. Rahman<br/>Format:&#160;Books<br/>Call Number&#160;TH1000 R42 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=36750">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/> Possibilities of using void to improve natural cross ventilation in high-rise low-cost residential building ent://SD_ILS/0/SD_ILS:387056 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Abdul Razak Sapian<br/>Author&#160;Abdul Razak Sapian<br/>Format:&#160;Books<br/>Call Number&#160;TH4811 A72 2004<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=49747">Preview</a><br/>Thesis (Ph.D.) - Universiti Teknologi Malaysia, 2004<br/> An analysis of the commonwealth courts decisions on liabilities of construction professionals with special reference to post-completion claims ent://SD_ILS/0/SD_ILS:454150 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Wan Azlan Wan Ahmad<br/>Author&#160;Wan Azlan Wan Ahmad<br/>Format:&#160;Books<br/>Call Number&#160;TH428 W39 1996 raf<br/>Publisher&#160;UTM,<br/>Publication Date&#160;1996<br/>Thesis (Master of Science (Quantity Surveying)) - Universiti Teknologi Malaysia, 1996<br/> Kos pusingan hayat bagi sistem lif bangunan ent://SD_ILS/0/SD_ILS:367774 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Huzairi Abdul Hadi<br/>Author&#160;Huzairi Abdul Hadi<br/>Format:&#160;Books<br/>Call Number&#160;TJ1372.H89 1995 raf<br/>Publisher&#160;UTM,<br/>Publication Date&#160;1995<br/>Kertas projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1995<br/> Kajian item kos signifikan untuk bangunan hospital ent://SD_ILS/0/SD_ILS:333119 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Zalini Mat Zain<br/>Author&#160;Zalini Mat Zain<br/>Format:&#160;Books<br/>Call Number&#160;TH4661.Z24 1994 raf<br/>Publisher&#160;UTM,<br/>Publication Date&#160;1994<br/>Kertas Projek (Sarjana Muda Ukur Bahan)--Universiti Teknologi Malaysia, 1994.<br/> Methods of preparing building maintenance budget ent://SD_ILS/0/SD_ILS:289620 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Hasnan Abdullah<br/>Author&#160;Hasnan Abdullah,&#160;Heriot-Watt University<br/>Format:&#160;Books<br/>Call Number&#160;TH3361 H27 1989 raf<br/>Publication Date&#160;1989<br/>Thesis (M.Sc) - Heriot-Watt University, 1989<br/> Pembentukan model kos pemasangan lif untuk bangunan-bangunan tinggi pejabat ent://SD_ILS/0/SD_ILS:342687 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Ahmad Zaidi Hashim<br/>Author&#160;Ahmad Zaidi Hashim<br/>Format:&#160;Books<br/>Call Number&#160;TJ1372.A55 1987 raf<br/>Publisher&#160;UTM,<br/>Publication Date&#160;1987<br/>Dissertasi (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1987<br/> Ruang letak kereta : analisa kos dan implikasinya ke atas kos pembinaan bangunan ent://SD_ILS/0/SD_ILS:106557 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Azrin Mohd. Din<br/>Author&#160;Azrin Mohd. Din<br/>Format:&#160;Books<br/>Call Number&#160;TL175.A98 1985 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1985<br/>Tesis (Ijazah Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1985<br/> Kemasan dinding luar dan implikasinya terhadap kos sesebuah rumah ent://SD_ILS/0/SD_ILS:467512 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Haridan Abd. Kadir<br/>Author&#160;Haridan Abd. Kadir<br/>Format:&#160;Books<br/>Call Number&#160;TH2235 .H37 1985 raf<br/>Publication Date&#160;1984<br/>Tesis (Ijazah Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1984<br/> Quantification and cost of scaffolding ent://SD_ILS/0/SD_ILS:860129 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Ten, Yuen Her, 1991-, author<br/>Author&#160;Ten, Yuen Her, 1991-, author,&#160;Muzani Mustapa, supervisor,&#160;Norazam Othman, 1963-, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH435 T46 2015 raf<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2015<br/> Variability and consistency of pre-tender cost estimates ent://SD_ILS/0/SD_ILS:860070 2024-06-18T12:22:45Z 2024-06-18T12:22:45Z by&#160;Zafira Nadia Maaz, 1992-, author<br/>Author&#160;Zafira Nadia Maaz, 1992-, author,&#160;Fadhlin Abdullah, supervisor,&#160;Razali Abdul Hamid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH434 Z34 2015 raf<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2015<br/>