Search Results for Construction industry -- Costs SirsiDynix Enterprise http://portal.utm.my/client/en_AU/main/main/qu$003dConstruction$002bindustry$002b--$002bCosts$0026ps$003d300$0026isd$003dtrue?dt=list 2024-06-12T05:03:29Z Project overhead costs allocation in oman's construction industry utilizing Activity - Based Costing ent://SD_ILS/0/SD_ILS:583900 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ammar Mohammed Salim Al-Ojaili<br/>Author&#160;Ammar Mohammed Salim Al-Ojaili<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020999 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Doktor Falsafah (Kejuruteraan Awam)) - Universiti Teknologi Malaysia, 2007<br/> Project overhead costs allocation in oman's construction industry utilizing Activity - Based Costing ent://SD_ILS/0/SD_ILS:267446 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ammar Mohammed Salim Al-Ojaili<br/>Author&#160;Ammar Mohammed Salim Al-Ojaili,&#160;Aminah Md. Yusof, supervisor<br/>Format:&#160;Books<br/>Call Number&#160;HF5686.C8 A55 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Doktor Falsafah (Kejuruteraan Awam)) - Universiti Teknologi Malaysia, 2007<br/> Construction industry ent://SD_ILS/0/SD_ILS:10232 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z Format:&#160;Visual Materials<br/>Call Number&#160;MFL 7832<br/>Publication Date&#160;2020&#160;2019&#160;2018&#160;2017&#160;2016<br/> Kerja-kerja meroboh bangunan; Cara, ke arah membantu, menasihat dan menjamin kejayaan pemborong binaan bumiputra; Kayu sebagai bahan utama dalam binaan rendah di Malaysia; Aspek kontrek dan amali pada peringkat penyelesaian dalam projek pembinaan; Creep settlement in clay; The effect of fiber-reinforcements on the structural properties of concrete-mixes; Industri binaan dalam rancangan pembangunan kerajaan; Industri binaan di Malaysia dahulu dan sekarang ent://SD_ILS/0/SD_ILS:419600 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ramar Subramaniam<br/>Author&#160;Ramar Subramaniam,&#160;Mohd. Shahir Yunus,&#160;Zainab Ahmad,&#160;Lim, Eng Keong,&#160;Rashiddi Hussein<br/>Format:&#160;Books<br/>Call Number&#160;MFL 7068 ra<br/>Publisher&#160;UTM,<br/>Publication Date&#160;2020&#160;2019&#160;2018&#160;2017&#160;2016<br/>Tesis (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1978-&#160;Thesis (Bachelor of Civil Engineering) - Universiti Teknologi Malaysia, 1980-&#160;Tesis (Sarjana Muda Alam Bina) - Universiti Teknologi Malaysia, 1978<br/> Refereed journal : the Australian Institute of Quantity Surveyors ent://SD_ILS/0/SD_ILS:538414 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Australian Institute of Quantity Surveyors<br/>Author&#160;Australian Institute of Quantity Surveyors<br/>Format:&#160;Continuing Resources<br/>Call Number&#160;TH435 R34 ol.1:no.1(1997)<br/>Publisher&#160;The Auatralian Institute of Quantity Surveyors,<br/>Publication Date&#160;2020&#160;2019&#160;2018&#160;2017&#160;2016<br/> Adoption of contour crafting in cost effectiveness for 3D construction printing in Malaysia ent://SD_ILS/0/SD_ILS:883767 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Liew, Jia Ming, 1988-, author<br/>Author&#160;Liew, Jia Ming, 1988-, author,&#160;Eeydzah Aminudin, 1987-, supervisor,&#160;Fakulti Kejuruteraan. Sekolah Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TS171.95 L54 2019 raf<br/>Publication Date&#160;2019<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2019<br/> Adoption of contour crafting in cost effectiveness for 3D construction printing in Malaysia ent://SD_ILS/0/SD_ILS:883768 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Liew, Jia Ming, 1988-, author<br/>Author&#160;Liew, Jia Ming, 1988-, author,&#160;Eeydzah Aminudin, 1987-, supervisor,&#160;Fakulti Kejuruteraan. Sekolah Kejuruteraan Awam<br/>Format:&#160;Electronic Resources<br/>Call Number&#160;CP 083222 ra<br/>Publication Date&#160;2019<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2019<br/> Accounting for Construction : Frameworks, Productivity, Cost and Performance ent://SD_ILS/0/SD_ILS:887642 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Best, Rick, editor<br/>Author&#160;Best, Rick, editor,&#160;Meikle, Jim, editor<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 A234 2019<br/>Publication Date&#160;2019<br/>ISBN&#160;9781138293977<br/> Project Risk and Opportunity Management : An Owner's Perspective ent://SD_ILS/0/SD_ILS:887643 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Johansen, Agnar, author<br/>Author&#160;Johansen, Agnar, author,&#160;Olsson, Nils O. E., author,&#160;Jergeas, George, author,&#160;Rolstadas, Asbjorn, author<br/>Format:&#160;Books<br/>Call Number&#160;HD69.P75 J644 2019<br/>Publication Date&#160;2019<br/>ISBN&#160;9781138365810<br/> Lean quality management system for construction process of steel works in construction ent://SD_ILS/0/SD_ILS:874748 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Iylmiera Che Rosli, 1994-, author<br/>Author&#160;Iylmiera Che Rosli, 1994-, author,&#160;Abdul Kadir Marsono, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH438 I95 2018 raf<br/>Publication Date&#160;2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/> Lean quality management system for construction process of steel works in construction ent://SD_ILS/0/SD_ILS:874750 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Iylmiera Che Rosli, 1994-, author<br/>Author&#160;Iylmiera Che Rosli, 1994-, author<br/>Format:&#160;Books<br/>Call Number&#160;CP 080619 ra<br/>Publication Date&#160;2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/> Cost analysis of construction technology for affordable housing ent://SD_ILS/0/SD_ILS:874809 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Yap, Zhen Shyong, 1993-, author<br/>Author&#160;Yap, Zhen Shyong, 1993-, author,&#160;Aminah Md. Yusof, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.M32 Y38 2018 raf<br/>Publication Date&#160;2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/> Cost analysis of construction technology for affordable housing ent://SD_ILS/0/SD_ILS:874810 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Yap, Zhen Shyong, 1993-, author<br/>Author&#160;Yap, Zhen Shyong, 1993-, author<br/>Format:&#160;Books<br/>Call Number&#160;CP 080650 ra<br/>Publication Date&#160;2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/> Roadmap for implementing value management in the Nigerian construction industry ent://SD_ILS/0/SD_ILS:881906 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Bruno Lot Tanko, 1982-, author<br/>Author&#160;Bruno Lot Tanko, 1982-, author,&#160;Fadhlin Abdullah, supervisor,&#160;Zuhaili Mohamad Ramly, supervisor,&#160;Fakulti Geoinformasi dan Harta Tanah<br/>Format:&#160;Books<br/>Call Number&#160;TS168 B78 2018 raf<br/>Publication Date&#160;2018<br/>Thesis (Doktor Falsafah) - Universiti Teknologi Malaysia, 2018<br/> Roadmap for implementing value management in the Nigerian construction industry ent://SD_ILS/0/SD_ILS:881907 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Bruno Lot Tanko, 1982-, author<br/>Author&#160;Bruno Lot Tanko, 1982-, author,&#160;Fadhlin Abdullah, supervisor,&#160;Zuhaili Mohamad Ramly, supervisor,&#160;Fakulti Geoinformasi dan Harta Tanah<br/>Format:&#160;Electronic Resources<br/>Call Number&#160;CP 082894 ra<br/>Publication Date&#160;2018<br/>Thesis (Doktor Falsafah) - Universiti Teknologi Malaysia, 2018<br/> The cost benefits of building information modeling (BIM) in Malaysian construction industry ent://SD_ILS/0/SD_ILS:869688 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chin, Li Wei, 1991- , author<br/>Author&#160;Chin, Li Wei, 1991- , author,&#160;Chai, Chang Sa'ar, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;XX(869688.1)<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Critical influencing factors to construction cost in planning stage ent://SD_ILS/0/SD_ILS:870692 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lau, Sie Yuong, 1990- , author<br/>Author&#160;Lau, Sie Yuong, 1990- , author<br/>Format:&#160;Books<br/>Call Number&#160;CP 065521 ra<br/>Publication Date&#160;2017<br/>Sarjana Kejuruteraan (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2017<br/> Critical influencing factors to construction cost in planning stage ent://SD_ILS/0/SD_ILS:870684 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lau, Sie Yuong, 1990- , author<br/>Author&#160;Lau, Sie Yuong, 1990- , author,&#160;Aziruddin Ressang, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 L38 2017 raf<br/>Publication Date&#160;2017<br/>Sarjana Kejuruteraan (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2017<br/> The cost benefits of building information modeling (BIM) in Malaysian construction industry ent://SD_ILS/0/SD_ILS:863398 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chin, Li Wei, 1991- author<br/>Author&#160;Chin, Li Wei, 1991- author,&#160;Chai, Chang Sa'ar, 1985- supervisor,&#160;Ahmad Fauzi Ismail, 1966- supervisor,&#160;Md. Maniruzzaman A. Aziz,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;XX(863398.2)<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembangunan)) - Universiti Teknologi Malaysia, 2017<br/> The cost benefits of building information modeling (BIM) in Malaysian construction industry ent://SD_ILS/0/SD_ILS:869690 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chin, Li Wei, 1991- , author<br/>Author&#160;Chin, Li Wei, 1991- , author<br/>Format:&#160;Books<br/>Call Number&#160;CP 065160 ra<br/>Publication Date&#160;2017<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/> Factors influencing project cost estimating for building contractors in Klang Valley, Malaysia ent://SD_ILS/0/SD_ILS:863314 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Toh, Tien Choon, 1983- author<br/>Author&#160;Toh, Tien Choon, 1983- author,&#160;Kherun Nita Ali, supervisor,&#160;Uche Godwin Aliagha, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;XX(863314.2)<br/>Publication Date&#160;2016<br/>Thesis (Ph.D (Ukur Bahan)) - Universiti Teknologi Malaysia, 2016<br/> Delivering Value with BIM : A whole-of-life approach ent://SD_ILS/0/SD_ILS:865368 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Sanchez, Adriana, editor<br/>Author&#160;Sanchez, Adriana, editor,&#160;Hampson, Keith (Keith Douglas), editor,&#160;Vaux, Simon, editor<br/>Format:&#160;Books<br/>Call Number&#160;TH438.13 D45 2016<br/>Publication Date&#160;2016<br/>ISBN&#160;9781138118997<br/> Factors influencing project cost estimating for building contractors in Klang Valley, Malaysia ent://SD_ILS/0/SD_ILS:868230 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Toh, Tien Choon, 1983- author<br/>Author&#160;Toh, Tien Choon, 1983- author,&#160;Kherun Nita Ali, supervisor,&#160;Uche Godwin Aliagha, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;XX(868230.4)<br/>Publication Date&#160;2016<br/>Thesis (Ph.D (Ukur Bahan)) - Universiti Teknologi Malaysia, 2016<br/> The influenced of construction work plan on cost effective in aluminium formwork system ent://SD_ILS/0/SD_ILS:848637 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Maryssa Alwyn Kisil, 1991-, author<br/>Author&#160;Maryssa Alwyn Kisil, 1991-, author,&#160;Rozana Zakaria,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 M373 2015 raf<br/>Publication Date&#160;2015<br/>Project Paper (Sarjana Muda (Kejuruteraan Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2015<br/> The influenced of construction work plan on cost effective in aluminium formwork system ent://SD_ILS/0/SD_ILS:859850 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Maryssa Alwyn Kisil, 1991-, author<br/>Author&#160;Maryssa Alwyn Kisil, 1991-, author<br/>Format:&#160;Books<br/>Call Number&#160;CP 060935 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2015<br/>Project Paper (Sarjana Muda (Kejuruteraan Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2015<br/> Safety budgeting cost for construction project ent://SD_ILS/0/SD_ILS:821438 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Firdaus Abd. Latib 1983-<br/>Author&#160;Firdaus Abd. Latib 1983-,&#160;Abdul Rahim Abdul Hamid,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;HD9715 F57 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Overtime in minimizing construction delay ent://SD_ILS/0/SD_ILS:821915 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Syahmi Saari, 1989-<br/>Author&#160;Syahmi Saari, 1989-,&#160;Aminah Md. Yusof, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TA682.26 S93 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Comparison for components of cost overrun in construction ent://SD_ILS/0/SD_ILS:832707 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Liu, Linbo, 1990- author<br/>Author&#160;Liu, Linbo, 1990- author,&#160;Shaiful Amri Mansur, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;HD9715 L58 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> MEMS cost analysis : from laboratory to industry ent://SD_ILS/0/SD_ILS:833732 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lawes, Ronald A.<br/>Author&#160;Lawes, Ronald A.<br/>Format:&#160;Books<br/>Call Number&#160;TK7875 L39 2014<br/>Publisher&#160;Pan Stanford Publishing,<br/>Publication Date&#160;2014<br/>ISBN&#160;9789814411066<br/> Comparison for components of cost overrun in construction ent://SD_ILS/0/SD_ILS:843709 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Liu, Linbo, 1990- author<br/>Author&#160;Liu, Linbo, 1990- author,&#160;Shaiful Amri Mansur, supervisor<br/>Format:&#160;Books<br/>Call Number&#160;CP 052116 ra<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Safety budgeting cost for construction project ent://SD_ILS/0/SD_ILS:821446 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Firdaus Abd. Latib 1983-<br/>Author&#160;Firdaus Abd. Latib 1983-,&#160;Abdul Rahim Abdul Hamid<br/>Format:&#160;Books<br/>Call Number&#160;CP 050429 ra<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) &ndash;Universiti Teknologi Malaysia, 2014<br/> Overtime in minimizing construction delay ent://SD_ILS/0/SD_ILS:821919 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Syahmi Saari, 1989-<br/>Author&#160;Syahmi Saari, 1989-,&#160;Aminah Md. Yusof<br/>Format:&#160;Books<br/>Call Number&#160;CP 050628 ra<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> Integrated Design and Cost Management for Civil Engineers ent://SD_ILS/0/SD_ILS:837910 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Whyte, Andrew, 1967-<br/>Author&#160;Whyte, Andrew, 1967-<br/>Format:&#160;Books<br/>Call Number&#160;TA177.4 W49 2014<br/>Publication Date&#160;2014<br/>ISBN&#160;9780415809214<br/> Constructive acceleration and cost ent://SD_ILS/0/SD_ILS:842351 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Maslawati Monged, 1976-<br/>Author&#160;Maslawati Monged, 1976-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH435 M37 2014 raf<br/>Publication Date&#160;2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/> An evaluation of effectiveness of approximate quantity method in estimating construction cost ent://SD_ILS/0/SD_ILS:820128 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Siew, Sik Nguong, 1989-<br/>Author&#160;Siew, Sik Nguong, 1989-,&#160;Khairulzan Yahya, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH435 S54 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Spon's architects' and builders' price book ent://SD_ILS/0/SD_ILS:804007 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Langdon, Davis<br/>Author&#160;Langdon, Davis<br/>Format:&#160;Books<br/>Call Number&#160;TH435 S65 2013<br/>Edition&#160;138th ed.<br/>Publisher&#160;Spon Press,<br/>Publication Date&#160;2013<br/>ISBN&#160;9780415680639<br/> Construction cost management : learning from case studies ent://SD_ILS/0/SD_ILS:808638 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Potts, Keith F.<br/>Author&#160;Potts, Keith F.,&#160;Ankrah, Nii<br/>Format:&#160;Books<br/>Call Number&#160;TA682.26 P68 2013<br/>Publication Date&#160;2013<br/>ISBN&#160;9780415629126&#160;9780415629133<br/> Whole life sustainability ent://SD_ILS/0/SD_ILS:809140 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ellingham, Ian<br/>Author&#160;Ellingham, Ian,&#160;Fawcett, William<br/>Format:&#160;Books<br/>Call Number&#160;TH437 E45 2013<br/>Publisher&#160;RIBA Pub.,<br/>Publication Date&#160;2013<br/>ISBN&#160;9781859464502<br/> Estimate in formation of construction contract ent://SD_ILS/0/SD_ILS:818403 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ezatul Sharida Ahmad Termizi, 1988-<br/>Author&#160;Ezatul Sharida Ahmad Termizi, 1988-,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 E93 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> Estimate in formation of construction contract ent://SD_ILS/0/SD_ILS:818418 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ezatul Sharida Ahmad Termizi, 1988-<br/>Author&#160;Ezatul Sharida Ahmad Termizi, 1988-<br/>Format:&#160;Books<br/>Call Number&#160;CP 031772 ra<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/> An evaluation of effectiveness of approximate quantity method in estimating construction cost ent://SD_ILS/0/SD_ILS:821822 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Siew, Sik Nguong, 1989-<br/>Author&#160;Siew, Sik Nguong, 1989-,&#160;Khairulzan Yahya, supervisor,&#160;Fakulti Pengurusan<br/>Format:&#160;Books<br/>Call Number&#160;CP 032676 ra<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) &ndash; Universiti Teknologi Malaysia, 2013<br/> Application of earned value analysis (EVA) in construction project in Malaysia ent://SD_ILS/0/SD_ILS:793714 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Pung, Geik Ying, 1989-<br/>Author&#160;Pung, Geik Ying, 1989-,&#160;Razali Abdul Hamid, supervisor,&#160;Syamsul Hendra Mahmud, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 P86 2013 raf<br/>Publication Date&#160;2013&#160;2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/> Spon's architects' and builders' price book ent://SD_ILS/0/SD_ILS:837320 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Langdon, Davis<br/>Author&#160;Langdon, Davis<br/>Format:&#160;Books<br/>Call Number&#160;TH435 S66 2012 r<br/>Edition&#160;137th ed.<br/>Publisher&#160;Spon Press,<br/>Publication Date&#160;2013<br/>ISBN&#160;9780415680639<br/> Kesan terhadap kos-kos yang terlibat dalam kerja-kerja pencepatan bagi projek pembinaan ent://SD_ILS/0/SD_ILS:793583 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Cheong, Muk Lim, 1990-<br/>Author&#160;Cheong, Muk Lim, 1990-,&#160;Razali Abdul Hamid, supervisor,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA682.26 C44 2012 raf<br/>Publication Date&#160;2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/> Comparing conventional to industrialised building system construction costing a case study of school building projects ent://SD_ILS/0/SD_ILS:778276 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Zuraidah Abdul Aziz, 1985-<br/>Author&#160;Zuraidah Abdul Aziz, 1985-<br/>Format:&#160;Books<br/>Call Number&#160;CP 027486 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2012<br/> Cost control system for construction site ent://SD_ILS/0/SD_ILS:778692 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lim, Yong Khin, 1986-<br/>Author&#160;Lim, Yong Khin, 1986-<br/>Format:&#160;Books<br/>Call Number&#160;CP 027374 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Time and budget overrun in the construction of town houses in Dubai U.A.E ent://SD_ILS/0/SD_ILS:790842 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Abdul Wahab Shaikh, 1971-<br/>Author&#160;Abdul Wahab Shaikh, 1971-,&#160;Bachan Singh, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH435 A23 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Requirement of value management in construction sector at Malaysian Airports Holdings Berhad (MAHB) ent://SD_ILS/0/SD_ILS:791176 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Naim Hamid, 1968-<br/>Author&#160;Mohd. Naim Hamid, 1968-<br/>Format:&#160;Books<br/>Call Number&#160;CP 027991 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Cost comparison between IBS and conventional methods of construction ent://SD_ILS/0/SD_ILS:791412 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Reza Lak Ghasemabadi, 1978-<br/>Author&#160;Reza Lak Ghasemabadi, 1978-<br/>Format:&#160;Books<br/>Call Number&#160;CP 027980 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Comparing conventional to industrialised building system construction costing : a case study of school building projects ent://SD_ILS/0/SD_ILS:775671 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Zuraidah Abdul Aziz, 1985-<br/>Author&#160;Zuraidah Abdul Aziz, 1985-,&#160;Abdul Kadir Marsono,&#160;Masine Md. Tap, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH437 Z87 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Pengawalan kos projek pembinaan oleh kontraktor ent://SD_ILS/0/SD_ILS:775841 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohamad Sofiuddin Abdul Rahman, 1987-<br/>Author&#160;Mohamad Sofiuddin Abdul Rahman, 1987-,&#160;Bachan Singh, supervisor,&#160;Zakaria Mohd. Yusof, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH435 M76 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Cost control system for construction site ent://SD_ILS/0/SD_ILS:775880 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lim, Yong Khin, 1986-<br/>Author&#160;Lim, Yong Khin, 1986-,&#160;Mohamad Ibrahim Mohamad, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH435 L56 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Pengawalan kos projek pembinaan oleh kontraktor ent://SD_ILS/0/SD_ILS:778746 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohamad Sofiuddin Abdul, 1987- Rahman<br/>Author&#160;Mohamad Sofiuddin Abdul, 1987- Rahman<br/>Format:&#160;Books<br/>Call Number&#160;CP 027353 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana) - Universiti Teknologi Malaysia, 2012<br/> Cost comparison between IBS and conventional methods of construction ent://SD_ILS/0/SD_ILS:786404 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Reza Lak Ghasemabadi, 1978-<br/>Author&#160;Reza Lak Ghasemabadi, 1978-,&#160;Ahmad Baharuddin Abd. Rahman,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TA682.26 R49 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Requirement of value management in construction sector at Malaysian Airports Holdings Berhad (MAHB) ent://SD_ILS/0/SD_ILS:790847 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Naim Hamid, 1968-<br/>Author&#160;Mohd. Naim Hamid, 1968-,&#160;Rosli Mohamad Zin, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M644 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> Time and budget overrun in the construction of town houses in Dubai U.A.E ent://SD_ILS/0/SD_ILS:791203 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Abdul Wahab Shaikh, 1971-<br/>Author&#160;Abdul Wahab Shaikh, 1971-<br/>Format:&#160;Books<br/>Call Number&#160;CP 027950 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/> The relationship between construction resource management to costs and profits from the perspective of contractor companies ent://SD_ILS/0/SD_ILS:793715 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Matheson Tuah Anak Norma, 1990-, author<br/>Author&#160;Matheson Tuah Anak Norma, 1990-, author,&#160;Fuziah Ismail, supervisor,&#160;Tantish Kamaruddin, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;HD9715 M38 2012 raf<br/>Publication Date&#160;2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/> The study on impact of project delay to construction cost ent://SD_ILS/0/SD_ILS:802268 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Dimas Maulana, 1984- author<br/>Author&#160;Dimas Maulana, 1984- author,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;CP 029784 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Modern construction : lean project delivery and integrated practices ent://SD_ILS/0/SD_ILS:630873 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Forbes, Lincoln H.<br/>Author&#160;Forbes, Lincoln H.,&#160;Ahmed, Syed M. (Syed Mahmood), 1960-<br/>Format:&#160;Books<br/>Call Number&#160;TH145 F674 2011<br/>Publisher&#160;CRC Press,<br/>Publication Date&#160;2011<br/>ISBN&#160;9781420063127<br/> Jadual kadar harga kerja-kerja kecil dan pembaikan ent://SD_ILS/0/SD_ILS:826291 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Malaysia. Kementerian Kerja Raya. Jabatan Kerja Raya. Bahagian Perolehan dan Khidmat Kos, Cawangan kontrak &amp; ukur bahan<br/>Author&#160;Malaysia. Kementerian Kerja Raya. Jabatan Kerja Raya. Bahagian Perolehan dan Khidmat Kos, Cawangan kontrak &amp; ukur bahan<br/>Format:&#160;Books&#160;Other<br/>Call Number&#160;TA682.26 M35 2011 wr<br/>Publisher&#160;Jabatan Kerja Raya,<br/>Publication Date&#160;2011<br/>ISSN&#160;13940910<br/> Cost control in construction phase in joint operation contractors : a case study of joint operation contractors in Sumatera Indonesia ent://SD_ILS/0/SD_ILS:802211 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Aditya Muhammad Yuwono, 1981-<br/>Author&#160;Aditya Muhammad Yuwono, 1981-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029503 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Analysis of factors affecting the accuracy of early cost estimate in construction projects ent://SD_ILS/0/SD_ILS:802270 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Dodi Ardianto, 1978-<br/>Author&#160;Dodi Ardianto, 1978-<br/>Format:&#160;Books<br/>Call Number&#160;CP 030083 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Cost monitoring for construction works carried out by class F contractors ent://SD_ILS/0/SD_ILS:765185 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ling, Grace Siew Jiuan, 1987-, author<br/>Author&#160;Ling, Grace Siew Jiuan, 1987-, author,&#160;Bachan Singh, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;XX(765185.1)<br/>Publication Date&#160;2011<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Cost monitoring for construction works carried out by class F contractors ent://SD_ILS/0/SD_ILS:767458 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ling, Grace Siew Jiuan, 1987-, author<br/>Author&#160;Ling, Grace Siew Jiuan, 1987-, author<br/>Format:&#160;Books<br/>Call Number&#160;CP 051930 ra<br/>Publication Date&#160;2011<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Pelaksanaan rekabentuk jalan dengan menggunakan pendekatan pengurusan nilai ent://SD_ILS/0/SD_ILS:772874 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lim, Keat Eng, 1967-<br/>Author&#160;Lim, Keat Eng, 1967-,&#160;Hishamuddin Mohd. Ali, supervisor,&#160;Fakulti Geoinformasi dan Harta Tanah<br/>Format:&#160;Books<br/>Call Number&#160;TH438 L565 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Aset dan Pengurusan Fasiliti)) - Universiti Teknologi Malaysia, 2011<br/> Analysis of factors affecting the accuracy of early cost estimate in construction projects ent://SD_ILS/0/SD_ILS:775235 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Dodi Ardianto, 1978-<br/>Author&#160;Dodi Ardianto, 1978-,&#160;Razali Abdul Hamid, supervisor,&#160;Ahmad Rosdan Razak, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH437 D63 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Cost control in construction phase in joint operation contractors : a case study of joint operation contractors in Sumatera Indonesia ent://SD_ILS/0/SD_ILS:775328 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Aditya Muhammad Yuwono, 1981-<br/>Author&#160;Aditya Muhammad Yuwono, 1981-,&#160;Razali Adul Hamid, supervisor,&#160;Fadhlin Abdullah,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 A357 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Pelaksanaan rekabentuk jalan dengan menggunakan pendekatan pengurusan nilai ent://SD_ILS/0/SD_ILS:772875 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lim, Keat Eng, 1967-<br/>Author&#160;Lim, Keat Eng, 1967-<br/>Format:&#160;Books<br/>Call Number&#160;CP 025161 ra<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Aset dan Pengurusan Fasiliti)) - Universiti Teknologi Malaysia, 2011<br/> The study on impact of project delay to construction cost ent://SD_ILS/0/SD_ILS:775240 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Dimas Maulana, 1984-<br/>Author&#160;Dimas Maulana, 1984-,&#160;Razali Abdul Hamid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA682.26 D56 2011 raf<br/>Publication Date&#160;2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/> Konsep kos kitaran hayat dalam industri pembinaan ent://SD_ILS/0/SD_ILS:777393 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ahmad Safarin Saad, 1988- , author<br/>Author&#160;Ahmad Safarin Saad, 1988- , author,&#160;Wan Yusoff Wan Mahmood, supervisor,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH435 A36 2011 raf<br/>Publication Date&#160;2011<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Lanjutan masa berikutan perubahan cuaca luar biasa ent://SD_ILS/0/SD_ILS:777534 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Muhammad Zulawal Zynuddin, 1989-<br/>Author&#160;Muhammad Zulawal Zynuddin, 1989-,&#160;Nur Emma Mustaffa, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 M84 2011 raf<br/>Publication Date&#160;2011<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/> Pengurusan aliran tunai syarikat pembinaan ent://SD_ILS/0/SD_ILS:780737 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Nur Iman Al Hafiz Mohd. Jamil, 1987-<br/>Author&#160;Mohd. Nur Iman Al Hafiz Mohd. Jamil, 1987-,&#160;Jamaluddin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 M66 2011 raf<br/>Publication Date&#160;2011<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2011<br/> Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker ent://SD_ILS/0/SD_ILS:603224 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Tan, Swee Kok, 1979-<br/>Author&#160;Tan, Swee Kok, 1979-,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 020698 ra<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> The facility management handbook ent://SD_ILS/0/SD_ILS:644307 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Cotts, David G.<br/>Author&#160;Cotts, David G.,&#160;Roper, Kathy O.,&#160;Payant, Richard P.<br/>Format:&#160;Books<br/>Call Number&#160;HD1394 C67 2010<br/>Edition&#160;3rd ed.<br/>Publisher&#160;American Management Association,<br/>Publication Date&#160;2010<br/>ISBN&#160;9780814413807<br/> A green cost allocation model for office and commercial buildings in Malaysia ent://SD_ILS/0/SD_ILS:729952 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Behzad Hamidi, 1986-<br/>Author&#160;Behzad Hamidi, 1986-,&#160;Muhd. Zaimi Abd. Majid, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 B44 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> A green cost allocation model for office and commercial buildings in Malaysia ent://SD_ILS/0/SD_ILS:729953 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Behzad Hamidi, 1986-<br/>Author&#160;Behzad Hamidi, 1986-<br/>Format:&#160;Books<br/>Call Number&#160;CP 023695 ra<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Factor influencing the selection of extension of time and delay analysis in legal cases ent://SD_ILS/0/SD_ILS:769162 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ronnie Aslina Goring, 1983-<br/>Author&#160;Ronnie Aslina Goring, 1983-,&#160;Norazam Othman, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 R66 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Pembiayaan projek secara Islam dikalangan pemaju perumahan ent://SD_ILS/0/SD_ILS:777673 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Noralvina Nazri, 1987-, author<br/>Author&#160;Noralvina Nazri, 1987-, author,&#160;Norazam Othman, supervisor,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 N67 2010 raf<br/>Publication Date&#160;2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/> Factor influencing the selection of extension of time and delay analysis in legal cases ent://SD_ILS/0/SD_ILS:769167 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ronnie Aslina Goring, 1983-<br/>Author&#160;Ronnie Aslina Goring, 1983-<br/>Format:&#160;Books<br/>Call Number&#160;CP 024690 ra<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Impak strategi bangunan hijau ke atas prestasi bangunan di dalam konteks keselesaan penghuni ent://SD_ILS/0/SD_ILS:769631 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Subiah Sulaiman, 1963-<br/>Author&#160;Subiah Sulaiman, 1963-,&#160;Hishamuddin Mohd. Ali, supervisor,&#160;Fakulti Geoinformasi dan Harta Tanah<br/>Format:&#160;Books<br/>Call Number&#160;TH145 S83 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Aset dan Fasiliti)) - Universiti Teknologi Malaysia, 2010<br/> Impak strategi bangunan hijau ke atas prestasi bangunan di dalam konteks keselesaan penghuni ent://SD_ILS/0/SD_ILS:769632 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Subiah Sulaiman, 1963-<br/>Author&#160;Subiah Sulaiman, 1963-<br/>Format:&#160;Books<br/>Call Number&#160;CP 025389 ra<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Aset dan Fasiliti)) - Universiti Teknologi Malaysia, 2010<br/> Tuntutan kerugian terhadap perbelanjaan tambahan ke atas kerja-kerja awalan akibat daripada lanjutan masa ent://SD_ILS/0/SD_ILS:780100 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Siti Nabilah Abdullah, 1980-<br/>Author&#160;Siti Nabilah Abdullah, 1980-,&#160;Mohd. Saidin Misnan,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 S584 2010 raf<br/>Publication Date&#160;2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/> Kajian perlaksanaan projek pembinaan bangunan kediaman yang melibatkan kenaikan kos dan kelewatan siap (MK Land Holdings Berhad) ent://SD_ILS/0/SD_ILS:781566 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Fazli Lajak, 1973-<br/>Author&#160;Mohd. Fazli Lajak, 1973-,&#160;Ahmad Rosdan Razak, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH437 M434 2010 raf<br/>Publication Date&#160;2010<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Kajian kos pemulihan projek perumahan terbengkalai ent://SD_ILS/0/SD_ILS:778346 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Nor Azian Wagiman, 1980-<br/>Author&#160;Nor Azian Wagiman, 1980-,&#160;Mohd. Saidin Misnan,&#160;Maizon Hashim, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA145 N676 2010 raf<br/>Publication Date&#160;2010<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Masalah kewangan pihak pemaju perumahan yang mendorong masalah projek terbengkalai ent://SD_ILS/0/SD_ILS:780378 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ronna Malissa Lo, 1986-<br/>Author&#160;Ronna Malissa Lo, 1986-,&#160;Zuhaili Mohamad Ramly, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA145 R66 2010 raf<br/>Publication Date&#160;2010<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2010<br/> Development of quantitative quality cost matrix for Malaysian construction quality management system ent://SD_ILS/0/SD_ILS:603678 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mukhtar Che Ali, 1958-<br/>Author&#160;Mukhtar Che Ali, 1958-,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 017412 ra<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Development of quantitative quality cost matrix for Malaysian construction quality management system ent://SD_ILS/0/SD_ILS:392349 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mukhtar Che Ali, 1958-<br/>Author&#160;Mukhtar Che Ali, 1958-,&#160;Rosli Mohamad Zin, supervisor,&#160;Zuhairi Abdul Hamid, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;HD62.15 M84 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker ent://SD_ILS/0/SD_ILS:388594 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Tan, Swee Kok, 1979-<br/>Author&#160;Tan, Swee Kok, 1979-,&#160;Rozana Zakaria,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 T367 2010 raf<br/>Publication Date&#160;2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/> A framework for cost assessment of QMS for building contractors based on biological immune system ent://SD_ILS/0/SD_ILS:362087 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Keyvanfar, Ali, 1981-<br/>Author&#160;Keyvanfar, Ali, 1981-,&#160;Abdul Kadir Marsono,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH435 A44 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Kajian kesan kenaikan harga sumber binaan hasil daripada kenaikan harga bahan bakar ent://SD_ILS/0/SD_ILS:378159 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ng, Kah Wai<br/>Author&#160;Ng, Kah Wai,&#160;Ahmad Rosdan Abd. Razak, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 N54 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Kesan peningkatan harga bahan binaan terhadap industri pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:381486 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Wan Liyana Wan Abd. Halim<br/>Author&#160;Wan Liyana Wan Abd. Halim,&#160;Asiah Othman, supervisor,&#160;Fakulti Kejuruteraan dan Sains Geoinformasi<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 W36 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2009<br/> Cost of compliance with safety and health requirements in construction site ent://SD_ILS/0/SD_ILS:602111 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Akmal Wani Sulong, 1985-<br/>Author&#160;Akmal Wani Sulong, 1985-,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 018511 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Financial management and accounting fundamentals for construction ent://SD_ILS/0/SD_ILS:637804 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Halpin, Daniel W.<br/>Author&#160;Halpin, Daniel W.,&#160;Senior, Bolivar A.<br/>Format:&#160;Books<br/>Call Number&#160;TH435 H34 2009<br/>Publisher&#160;Wiley,<br/>Publication Date&#160;2009<br/>ISBN&#160;9780470182710<br/> The commercial real estate revolution : nine transforming keys to lowering costs, cutting waste, and driving change in a broken industry ent://SD_ILS/0/SD_ILS:750323 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Miller, M. Rex, 1955-<br/>Author&#160;Miller, M. Rex, 1955-<br/>Format:&#160;Books<br/>Call Number&#160;HD9715 .U62 C66 2009<br/>Publisher&#160;Wiley,<br/>Publication Date&#160;2009<br/>ISBN&#160;9780470457467<br/> Hubungkait kos kualiti dengan kualiti pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:781631 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Norazlina Ismail<br/>Author&#160;Norazlina Ismail,&#160;Ismail Haron,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA682.26 N67 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/> Mengenalpasti kos penggunaan aluminium composite panel bagi pembinaan bangunan kerajaan ent://SD_ILS/0/SD_ILS:778763 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Sapawi Hussin, 1979-<br/>Author&#160;Mohd. Sapawi Hussin, 1979-,&#160;Jamaludin Yaakob, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA403 M734 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/> Tahap ketetapan anggaran kos pra-tender bagi pembinaan Balai Polis di Malaysia ent://SD_ILS/0/SD_ILS:781618 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Fadzil Mohd. Jali, 1978-<br/>Author&#160;Mohd. Fadzil Mohd. Jali, 1978-,&#160;Sarajul Fikri Mohamed, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA682.26 M43 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/> Sumber rujukan kerja-kerja penyediaan anggaran ent://SD_ILS/0/SD_ILS:781624 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Nur Arnisa Ahmed, 1977-<br/>Author&#160;Nur Arnisa Ahmed, 1977-,&#160;Syamsul Hendra Mahmud, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA682.26 N87 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/> A framework for cost assessment of QMS for building contractors based on biological immune system ent://SD_ILS/0/SD_ILS:597949 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Keyvanfar, Ali, 1981-<br/>Author&#160;Keyvanfar, Ali, 1981-,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 017682 ra<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Construction waste composition and cost of the residental construction project ent://SD_ILS/0/SD_ILS:597095 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lee, Hee Seen<br/>Author&#160;Lee, Hee Seen,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;CP 019168 ra<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Ketepatan penyediaan anggaran kos pembinaan yang disediakan oleh kontraktor untuk projek jambatan ent://SD_ILS/0/SD_ILS:381902 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Sari Murti<br/>Author&#160;Sari Murti,&#160;Zakaria Mohd. Yusof, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA682.26 S27 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/> Kenaikan harga simen dan besi tetulang kepada kontraktor binaan dalam pelaksanaan projek pembinaan ent://SD_ILS/0/SD_ILS:377268 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Nurulhuda Ibrahim<br/>Author&#160;Nurulhuda Ibrahim<br/>Format:&#160;Books<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/> Cost of compliance with safety and health requirements in construction site ent://SD_ILS/0/SD_ILS:379854 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Akmal Wani Sulong, 1985-<br/>Author&#160;Akmal Wani Sulong, 1985-,&#160;Aziruddin Ressang, supervisor,&#160;Ahmad Fauzi Awang,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH443 A35 2009 raf<br/>Publication Date&#160;2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Evaluating contract claims ent://SD_ILS/0/SD_ILS:290068 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Davison, R. Peter<br/>Author&#160;Davison, R. Peter,&#160;Mullen, John, 1959-<br/>Format:&#160;Books<br/>Call Number&#160;TH425 D38 2009<br/>Edition&#160;2nd ed.<br/>Publisher&#160;John Wiley,<br/>Publication Date&#160;2009<br/>ISBN&#160;9781405159203<br/> Impact of cement shortage and methods used by contractors to overcome it ent://SD_ILS/0/SD_ILS:302981 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chua, Simon Soon Hua<br/>Author&#160;Chua, Simon Soon Hua,&#160;Rosli Abdul Rashid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA403.6 C82 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/> Keperluan dan kos peralatan keselamatan bagi kerja-kerja kejuruteraan mekanikal dan elektrikal di tapak bina ent://SD_ILS/0/SD_ILS:303429 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohamad Azhari Zarzali Shah<br/>Author&#160;Mohamad Azhari Zarzali Shah<br/>Format:&#160;Books<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/> Schedule of rate ent://SD_ILS/0/SD_ILS:345354 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Malaysia. Kementerian Kerja Raya. Jabatan Kerja Raya<br/>Author&#160;Malaysia. Kementerian Kerja Raya. Jabatan Kerja Raya<br/>Format:&#160;Books<br/>Call Number&#160;TH435 M35 2009 wr<br/>Publisher&#160;Jabatan Kerja Raya,<br/>Publication Date&#160;2009<br/> Finance and control for construction ent://SD_ILS/0/SD_ILS:331249 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;March, Chris<br/>Author&#160;March, Chris<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 M37 2009<br/>Publisher&#160;Taylor &amp; Francis,<br/>Publication Date&#160;2009<br/>ISBN&#160;9780415371148<br/> The impact of uncertainty in cement prices to construction industry in Malaysia ent://SD_ILS/0/SD_ILS:356878 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Noor Emiwati Abu Hassan<br/>Author&#160;Noor Emiwati Abu Hassan,&#160;Arham Abdullah, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TA682.26 N66 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper Sarjana Muda (Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> The impact of uncertainty in cement prices to construction industry in Malaysia ent://SD_ILS/0/SD_ILS:356881 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Noor Emiwati Abu Hassan<br/>Author&#160;Noor Emiwati Abu Hassan,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;CP 019181 ra<br/>Publication Date&#160;2009<br/>Project Paper Sarjana Muda (Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Construction waste composition and cost of the residental construction project ent://SD_ILS/0/SD_ILS:357661 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lee, Hee Seen<br/>Author&#160;Lee, Hee Seen,&#160;Khairulzan Yahya, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TD897 L44 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/> Permintaan dan penawaran bahan binaan bagi projek perumahan ent://SD_ILS/0/SD_ILS:303248 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Nor Huzaidah Naim<br/>Author&#160;Nor Huzaidah Naim,&#160;Nurshikin Mohamad Shukery, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 N6745 2009 raf<br/>Publication Date&#160;2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/> Pengurusan kos overhead dalam projek pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:234219 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Azamuddin Arsad<br/>Author&#160;Azamuddin Arsad,&#160;Aminah Md. Yusof, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TA682.26 A93 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Kesan diameter dan bilangan barisan bolt ke atas keupayaan momen bagi sambungan plat hujung sejajar ent://SD_ILS/0/SD_ILS:242180 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Saiful Anuar<br/>Author&#160;Mohd. Saiful Anuar,&#160;Arizu Sulaiman, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TA492.B63 M64 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Collaborative usage of ICT DBMS in construction cost control : the post contract perspectives ent://SD_ILS/0/SD_ILS:226451 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Shamsul Hadi Bandi<br/>Author&#160;Shamsul Hadi Bandi<br/>Format:&#160;Books<br/>Call Number&#160;TH437 S526 2008<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Factors determining contractors' profit ent://SD_ILS/0/SD_ILS:247334 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ili Liyana Azman<br/>Author&#160;Ili Liyana Azman,&#160;Fadhlin Abdullah,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TA210 I45 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> The usage of tender price index and building material cost index ent://SD_ILS/0/SD_ILS:247372 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lee, Chee Wey<br/>Author&#160;Lee, Chee Wey,&#160;Fadhlin Abdullah,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 L43 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Analisa kos awalan dan tempoh pulang modal untuk pembekal atau kontraktor bagi projek yang menggunakan sistem acuan terowong ent://SD_ILS/0/SD_ILS:247500 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Md. Wazir Shafiq Mohd. Anuar<br/>Author&#160;Md. Wazir Shafiq Mohd. Anuar,&#160;Ismail Haron,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M82 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Collaborative usage of ICT DBMS in construction cost control : requirements for development and users perception ent://SD_ILS/0/SD_ILS:252822 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Abdul Kadir Marsono<br/>Author&#160;Abdul Kadir Marsono,&#160;Masine Md. Tap,&#160;Shamsul Hadi Bandi,&#160;International Conference on Infrastructure Development (1st : 2008 : Kuala Lumpur)<br/>Format:&#160;Books<br/>Call Number&#160;TH438 A235 2008<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/> Kos kitaran hayat bagi bangunan dewan kuliah ent://SD_ILS/0/SD_ILS:253353 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Roslinda Rosly<br/>Author&#160;Roslinda Rosly,&#160;Razali Adul Hamid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH437 R674 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Delay analysis in construction contracts ent://SD_ILS/0/SD_ILS:259524 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Keane, P. J. (P. John)<br/>Author&#160;Keane, P. J. (P. John),&#160;Caletka, A. F. (Anthony F.)<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 K425 2008<br/>Publisher&#160;Wiley-Blackwell,<br/>Publication Date&#160;2008&#160;2007<br/>ISBN&#160;9781405156547<br/> Collaborative usage of ICT DBMS in construction cost control the post contract perspectives ent://SD_ILS/0/SD_ILS:579985 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Shamsul Hadi Bandi<br/>Author&#160;Shamsul Hadi Bandi<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 015245<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Pengurusan kos overhead dalam projek pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:580570 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Azamuddin Arsad<br/>Author&#160;Azamuddin Arsad,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 023079 ra<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Kesan diameter dan bilangan barisan bolt ke atas keupayaan momen bagi sambungan plat hujung sejajar ent://SD_ILS/0/SD_ILS:581849 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Saiful Anuar<br/>Author&#160;Mohd. Saiful Anuar,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;CP 017734 ra<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Construction cost management : learning from case studies ent://SD_ILS/0/SD_ILS:275973 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Potts, Keith F.<br/>Author&#160;Potts, Keith F.<br/>Format:&#160;Books<br/>Call Number&#160;TA682.26 P67 2008<br/>Publisher&#160;Taylor &amp; Francis,<br/>Publication Date&#160;2008<br/>ISBN&#160;9780415442862<br/> Pengurusan aliran tunai dalam syarikat-syarikat pembinaan ent://SD_ILS/0/SD_ILS:300811 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Nur Iman Al Hafiz Mohd. Jamil<br/>Author&#160;Mohd. Nur Iman Al Hafiz Mohd. Jamil<br/>Format:&#160;Books<br/>Call Number&#160;TH435 N53 2008 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Analisis kos sistem binaan berindustri sistem konvensional ent://SD_ILS/0/SD_ILS:224006 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Norazrina Mohd Salleh<br/>Author&#160;Norazrina Mohd Salleh,&#160;Razali Adul Hamid, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 N62 2007 raf<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda (Ukur Bahan)) -Universiti Teknologi Malaysia, 2007<br/> Kajian ke atas masalah-masalah kehilangan dan kerosakan bahan binaan ditapak bina ent://SD_ILS/0/SD_ILS:230403 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Sa'edah Hassan<br/>Author&#160;Sa'edah Hassan<br/>Format:&#160;Books<br/>Call Number&#160;TA403 S23 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Pembangunan dan penggunaan pengkalan data kos dan masa bagi maklumat pra pembinaan projek ent://SD_ILS/0/SD_ILS:11372 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Afiza Atan<br/>Author&#160;Afiza Atan<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13904<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Pembangunan model ramalan kos pembinaan projek bangunan di Malaysia ent://SD_ILS/0/SD_ILS:148483 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Yap, Hui Chee<br/>Author&#160;Yap, Hui Chee<br/>Format:&#160;Books<br/>Call Number&#160;TH435 Y36 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Faktor-faktor utama yang mempengaruhi lebihan kos dan kelewatan dalam pembinaan ent://SD_ILS/0/SD_ILS:149735 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Wong, Chee Foong<br/>Author&#160;Wong, Chee Foong<br/>Format:&#160;Books<br/>Call Number&#160;TH435 W665 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Keadaan dimana kontraktor adalah layak untuk menuntut kos pencepatan ent://SD_ILS/0/SD_ILS:150260 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Tan, Elmund Chung Ten<br/>Author&#160;Tan, Elmund Chung Ten<br/>Format:&#160;Books<br/>Call Number&#160;TA210 T366 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Pembangunan dan penggunaan pengkalan data kos dan masa bagi maklumat pra pembinaan projek ent://SD_ILS/0/SD_ILS:147179 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Afiza Atan<br/>Author&#160;Afiza Atan<br/>Format:&#160;Books<br/>Call Number&#160;T58.6 A34 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Perbandingan perkhidmatan perunding kos dan kontrak binaan pelbagai negara di dunia ent://SD_ILS/0/SD_ILS:150746 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Rahayu Abdullah, 1984-<br/>Author&#160;Rahayu Abdullah, 1984-<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 R33 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Kesan kenaikan harga minyak terhadap kontraktor pembinaan di negeri Selangor ent://SD_ILS/0/SD_ILS:151347 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Phang, Chen Loong<br/>Author&#160;Phang, Chen Loong<br/>Format:&#160;Books<br/>Call Number&#160;TH435 P52 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Kos pembuangan sisa bangunan tinggi dan implikasi terhadap kos preliminaries ent://SD_ILS/0/SD_ILS:151570 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Armiza Abd. Rashid<br/>Author&#160;Armiza Abd. Rashid<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 A75 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> The framework for minimizing construction time and cost overruns in Padang and Pekanbaru, Indonesia ent://SD_ILS/0/SD_ILS:155543 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Harisaweni<br/>Author&#160;Harisaweni<br/>Format:&#160;Books<br/>Call Number&#160;TH 425 .I48 H37 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=48871">Preview</a><br/>Thesis (Sarjana Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Ganti rugi tertentu dan ditetapkan serta kerugian majikan ent://SD_ILS/0/SD_ILS:119952 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;P.Vickraman Prosothman<br/>Author&#160;P.Vickraman Prosothman<br/>Format:&#160;Books<br/>Call Number&#160;TH432 P84 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/> Metric construction cost data ent://SD_ILS/0/SD_ILS:244240 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chiang, John H.<br/>Author&#160;Chiang, John H.<br/>Format:&#160;Books<br/>Call Number&#160;TH435 M47 2007<br/>Edition&#160;66th annual ed.<br/>Publisher&#160;RSMeans,<br/>Publication Date&#160;2007<br/>ISBN&#160;9780876290491<br/> Hanscomb Yardsticks for Costing : cost Data for the Canadian Construction Industry ent://SD_ILS/0/SD_ILS:244258 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z Format:&#160;Books<br/>Call Number&#160;TH435 H364 2007<br/>Publisher&#160;RSMeans,<br/>Publication Date&#160;2007<br/>ISBN&#160;9780876298756<br/> Persepsi pihak majikan terhadap graduan wanita di dalam kerjaya ukur bahan ent://SD_ILS/0/SD_ILS:14062 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13873<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Project Paper (Sarjana Muda Perancangan Bandar dan Wilayah) - Universiti Teknologi Malaysia, 2007<br/> Pembayaran kepada sub-kontraktor ent://SD_ILS/0/SD_ILS:123609 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Zainul Falah Jamil<br/>Author&#160;Zainul Falah Jamil<br/>Format:&#160;Books<br/>Call Number&#160;TH435 Z35 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> Penilaian terhadap prestasi campuran stone mastic asphalt menggunakan serat kelapa sawit ent://SD_ILS/0/SD_ILS:9110 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Intan Salwani Abdul Kadir<br/>Author&#160;Intan Salwani Abdul Kadir<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13656<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/> Pembayaran interim hak-hak kontraktor ent://SD_ILS/0/SD_ILS:9142 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Estelle, Liew Swee Ling<br/>Author&#160;Estelle, Liew Swee Ling<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13572<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> Kajian kemungkinan dalam pembangunan projek perumahan ent://SD_ILS/0/SD_ILS:9156 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Cheong, Soo Lin<br/>Author&#160;Cheong, Soo Lin<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13575<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> Aplikasi GIS memproses kelulusan lokasi tapak kuari granit berdasarkan syarat-syarat yang telah ditentukan, dengan bantuan digital terrain modeling (DTM) ent://SD_ILS/0/SD_ILS:9222 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Muhamad Ihsan Sabri Romli<br/>Author&#160;Muhamad Ihsan Sabri Romli<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13645<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Sains Geoinformatik) - Universiti Teknologi Malaysia, 2006<br/> Kesan orientasi susunan bata terhadap kekuatan mampatan kerja bata ent://SD_ILS/0/SD_ILS:10324 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Juraemi Mohd. Yusak<br/>Author&#160;Juraemi Mohd. Yusak<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13732<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/> Procurement in the construction industry : the impact and cost of alternative market and supply processes ent://SD_ILS/0/SD_ILS:91865 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Hughes, Will<br/>Author&#160;Hughes, Will<br/>Format:&#160;Books<br/>Call Number&#160;TH435 P764 2006<br/>Publisher&#160;Taylor &amp; Francis,<br/>Publication Date&#160;2006<br/>ISBN&#160;9780415395601<br/> Value and risk management : a guide to best practice ent://SD_ILS/0/SD_ILS:128416 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Dallas, Michael<br/>Author&#160;Dallas, Michael<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 D34 2006<br/>Publisher&#160;Blackwell Publishing,<br/>Publication Date&#160;2006<br/>ISBN&#160;9781405120692<br/> Pemantauan kos diperingkat pembinaan ent://SD_ILS/0/SD_ILS:121320 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lim, Mei Li<br/>Author&#160;Lim, Mei Li<br/>Format:&#160;Books<br/>Call Number&#160;TH437 L554 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/> Kesan kenaikan dan penurunan harga keluli terhadap industri pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:620211 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Wan Nor Aishah Meor Hussain<br/>Author&#160;Wan Nor Aishah Meor Hussain<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 7716<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2006<br/> Value management in construction industry ent://SD_ILS/0/SD_ILS:621618 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ng, Kim Lai<br/>Author&#160;Ng, Kim Lai<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 7430<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/> Kesesuaian bahan yang diperuntukan dalam peruntukan perubahan harga bahan binaan ent://SD_ILS/0/SD_ILS:470150 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Maria Yusof<br/>Author&#160;Maria Yusof<br/>Format:&#160;Books<br/>Call Number&#160;TH435 M37 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> Pembayaran terus kepada subkontraktor domestik ent://SD_ILS/0/SD_ILS:472035 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Syed Saiful Nizam Syed Mubarat<br/>Author&#160;Syed Saiful Nizam Syed Mubarat<br/>Format:&#160;Books<br/>Call Number&#160;TH435 S93 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> Julat ketetapan anggaran kos rumah teres dua tingkat ent://SD_ILS/0/SD_ILS:470140 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Goh, Pei See<br/>Author&#160;Goh, Pei See<br/>Format:&#160;Books<br/>Call Number&#160;TH435 G63 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> Pembiayaan kontraktor binaan ent://SD_ILS/0/SD_ILS:477036 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Salena Muhammad<br/>Author&#160;Salena Muhammad<br/>Format:&#160;Books<br/>Call Number&#160;TH435 S24 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2006<br/> Profil projek pembinaan terbengkalai di negeri Sabah ent://SD_ILS/0/SD_ILS:9154 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Asniah Abidin<br/>Author&#160;Asniah Abidin<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13631<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> Pengaruh jenama terhadap pemilihan bahan binaan dan kelengkapan dalam projek pembinaan ent://SD_ILS/0/SD_ILS:14064 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Haslinda Esahak<br/>Author&#160;Haslinda Esahak<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13889<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> Kesan kenaikan dan penurunan harga keluli terhadap industri pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:483607 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Wan Nor Aishah Meor Hussain<br/>Author&#160;Wan Nor Aishah Meor Hussain<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 W56 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2006<br/> Value management in construction industry ent://SD_ILS/0/SD_ILS:489302 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ng, Kim Lai<br/>Author&#160;Ng, Kim Lai<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.M32 N44 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/> Korelasi regresi antara hasil parameter ujian pemadatan tanah dan had atterberg ent://SD_ILS/0/SD_ILS:7034 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Ruslan Che Ghani<br/>Author&#160;Mohd. Ruslan Che Ghani<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13402<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/> Simulasi curahan -air larian di kawasan tadahan Sg. Kelantan menggunakan HEC-HMS ent://SD_ILS/0/SD_ILS:7981 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Azhar Mat Zain<br/>Author&#160;Azhar Mat Zain<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13504<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/> Perbandingan kesan larutan serakan pada tanah baki terhadap taburan saiz zarah tanah ent://SD_ILS/0/SD_ILS:8226 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Masyitah Md. Nujid<br/>Author&#160;Masyitah Md. Nujid<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13380<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/> Pengurusan pembelian dan penghantaran bahan binaan oleh pihak kontraktor ent://SD_ILS/0/SD_ILS:8348 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ahmad Tazri Aziz<br/>Author&#160;Ahmad Tazri Aziz<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13409<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Sains (Bangunan) - Universiti Teknologi Malaysia, 2005<br/> Sistem pemantauan dan penyenggaraan cerun ent://SD_ILS/0/SD_ILS:9582 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Abdul Aziz Mamat<br/>Author&#160;Abdul Aziz Mamat<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13716<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/> Anggaran kadar kos yang diperuntukkan dalam program keselamatan ent://SD_ILS/0/SD_ILS:609399 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Mujahid Mohd<br/>Author&#160;Mohd. Mujahid Mohd<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 6328<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam - (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> Analisa implikasi arahan perubahan kerja terhadap kos perbezaan antara kaedah tradisional dengan reka dan bina ent://SD_ILS/0/SD_ILS:614237 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ahmad Firdaus Mohamad<br/>Author&#160;Ahmad Firdaus Mohamad<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 7690<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> Pengukuran kemajuan kerja melalui kos, kuantiti dan masa : satu perbandingan ent://SD_ILS/0/SD_ILS:810925 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Durrah Munierahhanies Azizan<br/>Author&#160;Durrah Munierahhanies Azizan,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;CP 033262 ra<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/> Hubungan antara faktor - faktor yang mempengaruhi produktiviti dengan kos projek pembinaan ent://SD_ILS/0/SD_ILS:607064 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Norazah Abd. Aziz<br/>Author&#160;Norazah Abd. Aziz<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 5992<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/> Modal kerja kontraktor projek pembinaan ent://SD_ILS/0/SD_ILS:610019 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lai, Woon Fatt<br/>Author&#160;Lai, Woon Fatt<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 6303<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam - Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2005<br/> Cost control in construction project of the site ent://SD_ILS/0/SD_ILS:610269 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Koh, Wee Liang<br/>Author&#160;Koh, Wee Liang<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 6255<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam - (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> Unplanned schedule compression methods and the impact on project cost ent://SD_ILS/0/SD_ILS:612040 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Sea, Ee Nak<br/>Author&#160;Sea, Ee Nak<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 7744<br/>Publisher&#160;Universiti Teknologi Malaysia<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/> Hubungan antara faktor - faktor yang mempengaruhi produktiviti dengan kos projek pembinaan ent://SD_ILS/0/SD_ILS:425463 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Norazah Abd. Aziz<br/>Author&#160;Norazah Abd. Aziz<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 N39 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=64228">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/> Modal kerja kontraktor projek pembinaan ent://SD_ILS/0/SD_ILS:421164 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lai, Woon Fatt<br/>Author&#160;Lai, Woon Fatt<br/>Format:&#160;Books<br/>Call Number&#160;TA210 L34 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=66367">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> Cost control in construction project of the site ent://SD_ILS/0/SD_ILS:422350 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Koh, Wee Liang<br/>Author&#160;Koh, Wee Liang<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 K63 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=66053">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam - (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> Anggaran kadar kos yang diperuntukkan dalam program keselamatan ent://SD_ILS/0/SD_ILS:427450 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Mujahid Mohd<br/>Author&#160;Mohd. Mujahid Mohd<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 M58 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam - (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> Implikasi kos penyediaan tapak kepada kos projek bagi projek perumahan di Malaysia ent://SD_ILS/0/SD_ILS:447560 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Lokmal Md. Hussein<br/>Author&#160;Mohd. Lokmal Md. Hussein<br/>Format:&#160;Books<br/>Call Number&#160;TH375 M56 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2005<br/> Masalah -masalah yang mungkin berlaku dalam pelaksanaan teknik kos pusingan Hayat di Malaysia ent://SD_ILS/0/SD_ILS:447554 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Yee, Han June<br/>Author&#160;Yee, Han June<br/>Format:&#160;Books<br/>Call Number&#160;TH435 Y43 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2005<br/> Analisa implikasi arahan perubahan kerja terhadap kos : perbezaan antara kaedah tradisional dengan reka dan bina ent://SD_ILS/0/SD_ILS:457658 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ahmad Firdaus Mohamad<br/>Author&#160;Ahmad Firdaus Mohamad<br/>Format:&#160;Books<br/>Call Number&#160;TH438 A37 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=68510">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> Pengukuran kemajuan kerja melalui kos, kuantiti dan masa : satu perbandingan ent://SD_ILS/0/SD_ILS:420765 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Durrah Munierahhanies Azizan<br/>Author&#160;Durrah Munierahhanies Azizan<br/>Format:&#160;Books<br/>Call Number&#160;TH438 D87 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/> Kemahiran yang diperlukan oleh seseorang fasilitator pengurusan nilai ent://SD_ILS/0/SD_ILS:450959 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Leong, Yuet Lin<br/>Author&#160;Leong, Yuet Lin<br/>Format:&#160;Books<br/>Call Number&#160;TH438 L46 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper ( Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> Unplanned schedule compression methods and the impact on project cost ent://SD_ILS/0/SD_ILS:451446 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Sea, Ee Nak<br/>Author&#160;Sea, Ee Nak<br/>Format:&#160;Books<br/>Call Number&#160;TH438.4 S42 2005<br/>Publisher&#160;Universiti Teknologi Malaysia ,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/> Cost control in construction project of the site ent://SD_ILS/0/SD_ILS:7977 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Koh, Wee Liang<br/>Author&#160;Koh, Wee Liang<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13424<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam - (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2005<br/> Modal kerja kontraktor projek pembinaan ent://SD_ILS/0/SD_ILS:8039 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lai, Woon Fatt<br/>Author&#160;Lai, Woon Fatt<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13513<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam - Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2005<br/> Cadangan pembangunan Taman Lagenda Puteri Gunung Ledang Jasin, Melaka ent://SD_ILS/0/SD_ILS:8562 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Hanita Yusof<br/>Author&#160;Hanita Yusof<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13406<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Senibina Landskap) - Universiti Teknologi Malaysia, 2005<br/> Pengawasan projek pembinaan dengan menggunakan kaedah earned value : satu kajian kes ent://SD_ILS/0/SD_ILS:8598 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Annie, Koh<br/>Author&#160;Annie, Koh<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13574<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Sains (Pembinaan) - Universiti Teknologi Malaysia, 2005<br/> Analisa implikasi arahan perubahan kerja terhadap kos : perbezaan antara kaedah tradisional dengan reka dan bina ent://SD_ILS/0/SD_ILS:8990 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ahmad Firdaus Mohamad<br/>Author&#160;Ahmad Firdaus Mohamad<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13621<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2005<br/> Peranan tanggungjawab dan liabiliti arkitek di bawah borang kontrak PAM 1998 dan pegawai penguasa di bawah borang kontrak JKR 203A satu perbandingan ent://SD_ILS/0/SD_ILS:7068 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chan, Catherine Hui Lan<br/>Author&#160;Chan, Catherine Hui Lan<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12614<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2004<br/> Faktor-faktor yang mempengaruhi kelewatan penyiapan pembinaan projek sekolah ent://SD_ILS/0/SD_ILS:7112 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lailatul Akhmar Zainuddin<br/>Author&#160;Lailatul Akhmar Zainuddin<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12612<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2004<br/> Perbandingan di antara teori fasa-fasa rancangan kerja pengurusan nilai dengan amalannya : kajian kes landasan Kuala Lumpur International Airport (KLIA) ent://SD_ILS/0/SD_ILS:372440 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Nita Azilah Azmi<br/>Author&#160;Nita Azilah Azmi<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.M32 K82 2004<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2004<br/> Information management to integrate cost and schedule for infrastructure projects ent://SD_ILS/0/SD_ILS:603938 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chung, Keat Wei<br/>Author&#160;Chung, Keat Wei<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 10449<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2004<br/> Cost studies of buildings ent://SD_ILS/0/SD_ILS:430534 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ashworth, A. (Allan)<br/>Author&#160;Ashworth, A. (Allan)<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 A85 2004<br/>Edition&#160;4th ed.<br/>Publisher&#160;Pearson/Prentice Hall,<br/>Publication Date&#160;2004<br/>ISBN&#160;9780131453227<br/> Information management to integrate cost and schedule for infrastructure projects ent://SD_ILS/0/SD_ILS:395874 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chung, Keat Wei<br/>Author&#160;Chung, Keat Wei<br/>Format:&#160;Books<br/>Call Number&#160;TH438 C484 2004<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2004<br/> Value management of construction projects ent://SD_ILS/0/SD_ILS:405099 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Kelly, John, 1947 June 4-<br/>Author&#160;Kelly, John, 1947 June 4-,&#160;Male, Steven,&#160;Graham, Drummond<br/>Format:&#160;Books<br/>Call Number&#160;TH438 K44 2004<br/>Publisher&#160;Blackwell Science,<br/>Publication Date&#160;2004<br/>ISBN&#160;9780632051434<br/> Critical factors that influence the success of implementing value management in Malaysian construction industry ent://SD_ILS/0/SD_ILS:359566 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chua, Tee Khoon @ Chua Yong Peng<br/>Author&#160;Chua, Tee Khoon @ Chua Yong Peng,&#160;Chua, Yong Peng<br/>Format:&#160;Books<br/>Call Number&#160;TH438 C48 2003<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004&#160;2003<br/>Thesis (Master of Science (Construction Management)) - Universiti Teknologi Malaysia, 2004<br/> Faktor-faktor kritikal kejayaan sesebuah projek pembinaan berdasarkan objektif projek yang berlainan ent://SD_ILS/0/SD_ILS:372454 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lim, Beng Li<br/>Author&#160;Lim, Beng Li<br/>Format:&#160;Books<br/>Call Number&#160;TH438 L554 2004<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2004<br/> The practice of cost segregation analysis : maximizing tax benefits for building acquisitions and construction ent://SD_ILS/0/SD_ILS:239817 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Desrosiers, Bruce A.<br/>Author&#160;Desrosiers, Bruce A.,&#160;DelPico, Wayne J.,&#160;R.S. Means Company<br/>Format:&#160;Books<br/>Call Number&#160;KF6495.C6 D47 2004<br/>Publisher&#160;RSMeans,<br/>Publication Date&#160;2004<br/>ISBN&#160;9780876297445<br/> Critical factors that influence the success of implementing value management in Malaysian construction industry ent://SD_ILS/0/SD_ILS:8220 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chua, Tee Khoon @ Chua Yong Peng<br/>Author&#160;Chua, Tee Khoon @ Chua Yong Peng<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13442<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2004<br/> Pelaksanaan dan keberkesanan manual prosedur ISO 9002 ent://SD_ILS/0/SD_ILS:7050 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohamad Nasarudin Mokhtar<br/>Author&#160;Mohamad Nasarudin Mokhtar<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12577<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Kaedah pemantauan kerja di tapak bina oleh kontraktor ent://SD_ILS/0/SD_ILS:7096 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Abdul Khalid Yaacob<br/>Author&#160;Abdul Khalid Yaacob<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12599<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2003<br/> Sistem pengurusan sisa bagi Makmal Kejuruteraan Awam, Universiti Teknologi Malaysia ent://SD_ILS/0/SD_ILS:21375 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Leong, Siew Chee<br/>Author&#160;Leong, Siew Chee<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12347<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Kerja asas cerucuk dan garis panduan bagi pembinaan di Tanah Tinggi ent://SD_ILS/0/SD_ILS:21699 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Azman Jaffar<br/>Author&#160;Azman Jaffar<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12568<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Kajian ke atas nisbah kos bahan, buruh, peralatan / jentera untuk kerja jalanraya ent://SD_ILS/0/SD_ILS:354356 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Zamri Shariff<br/>Author&#160;Zamri Shariff<br/>Format:&#160;Books<br/>Call Number&#160;HD9717.5.R6 Z35 2003<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2003<br/> Kajian kos pengurusan dan perancangan keselamatan tapak bina bagi kerja-kerja kejuruteraan awam ent://SD_ILS/0/SD_ILS:367776 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Saidin Misnan, 1971-<br/>Author&#160;Mohd. Saidin Misnan, 1971-,&#160;Wan Yusoff Wan Mahmood,&#160;Norizan Mansor<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 M72 2003<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/> Kajian kos kontraktor semasa pembinaan ent://SD_ILS/0/SD_ILS:599047 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Zuraidah Mohamad Yasin<br/>Author&#160;Zuraidah Mohamad Yasin<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 3085<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Perunding dalam projek pembinaan : kajian penentuan kadar bayaran fi professional ent://SD_ILS/0/SD_ILS:347792 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohamad Hafiz Hassan<br/>Author&#160;Mohamad Hafiz Hassan<br/>Format:&#160;Books<br/>Call Number&#160;TH159 M42 2003<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Kajian kos kontraktor semasa pembinaan ent://SD_ILS/0/SD_ILS:366088 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Zuraidah Mohamad Yasin<br/>Author&#160;Zuraidah Mohamad Yasin<br/>Format:&#160;Books<br/>Call Number&#160;TA210 Z87 2003<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=63245">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Pemantauan kos projek kajian kes : kompleks rumah alumni Universiti Teknologi Malaysia, Skudai, Johor Darul Takzim ent://SD_ILS/0/SD_ILS:346416 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ana Rozaininaida Abd. Rahman<br/>Author&#160;Ana Rozaininaida Abd. Rahman<br/>Format:&#160;Books<br/>Call Number&#160;TH437 A52 2003<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Kaedah pemantauan kerja di tapak bina oleh kontraktor ent://SD_ILS/0/SD_ILS:335960 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Abdul Khalid Yaacob<br/>Author&#160;Abdul Khalid Yaacob<br/>Format:&#160;Books<br/>Call Number&#160;TH438 A33 2003<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2003<br/> Quantifying and managing disruption claims ent://SD_ILS/0/SD_ILS:338294 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lal, Hamish<br/>Author&#160;Lal, Hamish<br/>Format:&#160;Books<br/>Call Number&#160;TH437 L344 2002<br/>Publisher&#160;Thomas Telford ,<br/>Publication Date&#160;2003<br/>ISBN&#160;9780727731654<br/> Penganggaran kebisingan dari tapak bina ent://SD_ILS/0/SD_ILS:21024 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Afisah Abdul Aziz<br/>Author&#160;Afisah Abdul Aziz<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12135<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Aturcara perlaksanaan tender di Indonesia ent://SD_ILS/0/SD_ILS:7035 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Andewa Dody Suryanto<br/>Author&#160;Andewa Dody Suryanto<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12358<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Projek Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2002<br/> Kajian kos pembinaan landasan kereta api di Malaysia ent://SD_ILS/0/SD_ILS:7045 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Hisham Bakar<br/>Author&#160;Hisham Bakar<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12360<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2002<br/> Penggunaan Microsoft Project 2000 dalam pengurusan kos projek ent://SD_ILS/0/SD_ILS:15610 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Izwan Misni<br/>Author&#160;Izwan Misni<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11524<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Pengawalan kos dalam aspek pengurusan projek pembinaan ent://SD_ILS/0/SD_ILS:17228 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chee, Weng Keong<br/>Author&#160;Chee, Weng Keong<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11495<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Perbandingan antara tembok penahan tanah jenis 'flexsoil' dengan tembok-tembok jenis lain ent://SD_ILS/0/SD_ILS:17240 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Abdul Halim Samah<br/>Author&#160;Abdul Halim Samah<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11487<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Kajian keberkesanan bentuk masukan pembentung terhadap ciri aliran ent://SD_ILS/0/SD_ILS:20814 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ezrul Azzim Wahid<br/>Author&#160;Ezrul Azzim Wahid<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12116<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Rock-socketed bored pile, soil retaining system and management of confined site ent://SD_ILS/0/SD_ILS:21362 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Amir Khan Suwandi<br/>Author&#160;Amir Khan Suwandi<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12162<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Thesis (Master of Civil Engineering) - Universiti Teknologi Malaysia, 2002<br/> Penyelenggaraan sistem LRT Putra ent://SD_ILS/0/SD_ILS:21724 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Azury Kamaruddin<br/>Author&#160;Azury Kamaruddin<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12359<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Projek Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2002<br/> Pengukuran hasil pembakaran gabungan tempurung dan sabut kelapa sawit ent://SD_ILS/0/SD_ILS:21853 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Tuan Mohd. Azizi Raja Yusoff<br/>Author&#160;Tuan Mohd. Azizi Raja Yusoff<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12641<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan (Mekanikal)) - Universiti Teknologi Malaysia, 2002<br/> Pengurusan projek perumahan kos rendah Negeri Melaka ent://SD_ILS/0/SD_ILS:347268 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Azam Tompang<br/>Author&#160;Mohd. Azam Tompang<br/>Format:&#160;Books<br/>Call Number&#160;TH437 M39 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Perancangan dan pengawalan kos dalam sektor pembangunan ent://SD_ILS/0/SD_ILS:307026 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Yusni Hamid<br/>Author&#160;Yusni Hamid<br/>Format:&#160;Books<br/>Call Number&#160;TH435 Y87 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Best value in construction ent://SD_ILS/0/SD_ILS:308939 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Kelly, John (John P.)<br/>Author&#160;Kelly, John (John P.),&#160;Morledge, Roy,&#160;Wilkinson, Sara<br/>Format:&#160;Books<br/>Call Number&#160;TH438 B47 2002<br/>Publisher&#160;Blackwell Science,<br/>Publication Date&#160;2002<br/>ISBN&#160;9780632056118<br/> Life cycle costing : multi-storey residential buildings ent://SD_ILS/0/SD_ILS:315638 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Dang Anom Md. Zin<br/>Author&#160;Dang Anom Md. Zin,&#160;Siti Hamisah Tapsir, 1961-,&#160;Zubaidah Ramli,&#160;Persidangan Kebangsaan Kejuruteraan Awam (ke-2 : 2002 : Pulau Pinang)<br/>Format:&#160;Books<br/>Call Number&#160;TH438 D36 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/> VEWA : value engineering web-based application ent://SD_ILS/0/SD_ILS:328735 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Che Wan Fadhil Che Wan Putra<br/>Author&#160;Che Wan Fadhil Che Wan Putra,&#160;Ho, Boon Kit,&#160;International Workshop on Construction Information Technology in Education (2002 : Slovenia)<br/>Format:&#160;Books<br/>Call Number&#160;TH437 C83 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/> Value engineering (VE) process modelling for integrating design and construction ent://SD_ILS/0/SD_ILS:321680 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Che Wan Fadhil Che Wan Putra<br/>Author&#160;Che Wan Fadhil Che Wan Putra,&#160;Ho, Boon Kit,&#160;National Conference on Computer Graphics and Multimedia (2002 : Melaka)<br/>Format:&#160;Books<br/>Call Number&#160;TS168 C92 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/> Pemantauan kemajuan kerja menggunakan kaedah ukuran kos ent://SD_ILS/0/SD_ILS:325562 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Norsadin Samshuddin<br/>Author&#160;Norsadin Samshuddin<br/>Format:&#160;Books<br/>Call Number&#160;TH437 N73 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> The importance of overhead costs among construction industries ent://SD_ILS/0/SD_ILS:326667 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Faidzulaini Muhammad<br/>Author&#160;Faidzulaini Muhammad,&#160;Che Zuriana Muhammad Jamil<br/>Format:&#160;Books<br/>Call Number&#160;TH438.15 F34 2002<br/>Publisher&#160;School of Accountancy, Universiti Utara Malaysia,<br/>Publication Date&#160;2002<br/> Pengawalan kos dalam aspek pengurusan projek pembinaan ent://SD_ILS/0/SD_ILS:306663 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chee, Weng Keong<br/>Author&#160;Chee, Weng Keong<br/>Format:&#160;Books<br/>Call Number&#160;TH435 C44 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Penggunaan Microsoft Project 2000 dalam pengurusan kos projek ent://SD_ILS/0/SD_ILS:307180 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Izwan Misni<br/>Author&#160;Izwan Misni<br/>Format:&#160;Books<br/>Call Number&#160;TH437 I98 2002 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Analisa kos bagi projek sekolah secara reka dan bina ent://SD_ILS/0/SD_ILS:307995 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Wahida Abd. Rahman<br/>Author&#160;Wahida Abd. Rahman<br/>Format:&#160;Books<br/>Call Number&#160;TH435 W334 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Tesis (Sarjana Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2002<br/> Life cycle cost analysis on corrosion remedial measures for concrete bridges ent://SD_ILS/0/SD_ILS:15917 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ho, Jin How<br/>Author&#160;Ho, Jin How<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11890<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Thesis (Master of Engineering (Civil)) - Universiti Teknologi Malaysia, 2002<br/> Analisis dan rekabentuk papak rata dengan bantuan komputer ent://SD_ILS/0/SD_ILS:17247 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Choy, Kim Loong<br/>Author&#160;Choy, Kim Loong<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11490<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Kajian terhadap kepuasan pengguna Blok M46-M49 (UTM) dengan menggunakan kaedah QFD ent://SD_ILS/0/SD_ILS:20564 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Arniza Israwati Sehab<br/>Author&#160;Arniza Israwati Sehab<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11997<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Construction scheduling, cost optimization and management : a new model based on neurocomputing and object technologies ent://SD_ILS/0/SD_ILS:164371 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Adeli, Hojjat<br/>Author&#160;Adeli, Hojjat,&#160;Karim, Asim<br/>Format:&#160;Books<br/>Call Number&#160;TH438.4 A33 2001<br/>Publisher&#160;Spon Press,<br/>Publication Date&#160;2001<br/>ISBN&#160;9780415244176<br/> Kesan projek terbengkalai terhadap industri pembangunan ent://SD_ILS/0/SD_ILS:16080 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Gan, Seng Kian<br/>Author&#160;Gan, Seng Kian<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11019<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Masalah keretakan dan kualiti plaster bagi rumah kos sederhana ent://SD_ILS/0/SD_ILS:16531 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lee, Foong Kheong<br/>Author&#160;Lee, Foong Kheong<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11046<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Kesan beban seismik ke atas perumahan di Malaysia ent://SD_ILS/0/SD_ILS:17055 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Bahiah Baharudin<br/>Author&#160;Bahiah Baharudin<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10913<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Penyediaan carta kalibrasi ujian tanpa musnah (NDT) untuk konkrit berkekuatan tinggi ent://SD_ILS/0/SD_ILS:17080 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Hazli Husin<br/>Author&#160;Hazli Husin<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10914<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Pembinaan elektronik (E-Pembinaan) : pengalaman daripada industri-industri lain ent://SD_ILS/0/SD_ILS:21048 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Aminuddin Ibrahim<br/>Author&#160;Aminuddin Ibrahim<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11759<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2001<br/> Kejuruteraan nilai di dalam industri pembinaan Malaysia ent://SD_ILS/0/SD_ILS:162585 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ong, Chin Khen<br/>Author&#160;Ong, Chin Khen<br/>Format:&#160;Books<br/>Call Number&#160;TH437 O54 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Sistem pemantauan kos dan informasi projek pembinaan ent://SD_ILS/0/SD_ILS:162783 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Nirmala Rathakrishnan<br/>Author&#160;Nirmala Rathakrishnan<br/>Format:&#160;Books<br/>Call Number&#160;TH437 N58 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Pembiayaan pembangunan projek perumahan : perbandingan perspektif Islam dan konvensional ent://SD_ILS/0/SD_ILS:163045 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Wan Afnizan Wan Mohamed<br/>Author&#160;Wan Afnizan Wan Mohamed<br/>Format:&#160;Books<br/>Call Number&#160;TH4815.8 W33 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Modelling the application of value engineering (VE) in design and construction ent://SD_ILS/0/SD_ILS:298012 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Che Wan Fadhil Che Wan Putra<br/>Author&#160;Che Wan Fadhil Che Wan Putra,&#160;Ho, Boon Kit,&#160;Malaysian Science and Technology Congress (2001 : Melaka)<br/>Format:&#160;Books<br/>Call Number&#160;TH437 C82 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/> Penggunaan blok premix untuk penyelenggaraan jalan : analisa kos dan masa ent://SD_ILS/0/SD_ILS:300602 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Sharul Nizam Abdul Aziz<br/>Author&#160;Sharul Nizam Abdul Aziz<br/>Format:&#160;Books<br/>Call Number&#160;HD9717.5.R6 S53 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Kajian ke atas perkhidmatan pembersihan dalam pelbagai jenis bangunan ent://SD_ILS/0/SD_ILS:15905 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Angelia Perpetua Melkin Spencer<br/>Author&#160;Angelia Perpetua Melkin Spencer<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11752<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2001<br/> Penilaian keberkesanan penggunaan perisian komputer &quot;JDE job cost system&quot; di dalam pengawalan kos projek binaan ent://SD_ILS/0/SD_ILS:101590 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Zalela Jaafar<br/>Author&#160;Zalela Jaafar<br/>Format:&#160;Books<br/>Call Number&#160;TA210 Z344 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/> Kajian terhadap aplikasi teknik optimasi kos binaan di firma ukur bahan ... [et al.] ent://SD_ILS/0/SD_ILS:13907 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Goh, Chong Ming<br/>Author&#160;Goh, Chong Ming,&#160;Masliana Mis'an,&#160;Teow, Leng Boon,&#160;Wong, Kok Ching,&#160;Yusharima Yusoff<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10290<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas Projek (Sarjana Muda Senibina) - Universiti Teknologi Malaysia, 2000<br/> Kesan pemilihan kaedah pembinaan ke atas tempoh siap dan kos projek ent://SD_ILS/0/SD_ILS:16413 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Adlan Rafhan Burahan<br/>Author&#160;Adlan Rafhan Burahan<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10400<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Dinding blok &quot;autoclaved lightweight concrete&quot; untuk projek perumahan ent://SD_ILS/0/SD_ILS:16485 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Awang Muhamad Jambol<br/>Author&#160;Awang Muhamad Jambol<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10282<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Projek Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/> Kajian potensi bahanapi yang sedia ada bagi kegunaan enjin diesel ent://SD_ILS/0/SD_ILS:17075 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Syahrul Manap<br/>Author&#160;Syahrul Manap<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10559<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Mekanikal) - Universiti Teknologi Malaysia, 2000<br/> Pengubahsuaian, pencirian dan penggunaan zeolit asli sebagai bahan penjerap terhadap bahan pencelup sintetik bes ent://SD_ILS/0/SD_ILS:18622 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chai, Mee Kin<br/>Author&#160;Chai, Mee Kin<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12155<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Tesis (Sarjana Sains (Kimia)) - Universiti Teknologi Malaysia, 2000<br/> Kawalan kos semasa pembinaan : kajian kes ent://SD_ILS/0/SD_ILS:156189 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Yee, Chee Sam<br/>Author&#160;Yee, Chee Sam<br/>Format:&#160;Books<br/>Call Number&#160;TH437 Y43 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Kaedah penyediaan kadarharga yang dilaksanakan di dalam industri pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:165478 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Maimunah Mansor<br/>Author&#160;Maimunah Mansor<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.M3 M35 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/> Kesan pemilihan kaedah pembinaan ke atas tempoh siap dan kos projek ent://SD_ILS/0/SD_ILS:145853 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Norazizi Mukhibat<br/>Author&#160;Norazizi Mukhibat<br/>Format:&#160;Books<br/>Call Number&#160;TA183 N67 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Sistem pengurusan projek pembinaan di Jabatan Kerja Raya Daerah Johor Bahru ent://SD_ILS/0/SD_ILS:148746 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Noorlizam Mohd. Monzai<br/>Author&#160;Mohd. Noorlizam Mohd. Monzai<br/>Format:&#160;Books<br/>Call Number&#160;HD69.P75 M666 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Sains Komputer) - Universiti Teknologi Malaysia, 2000<br/> Reviewing the project delivery systems used in Malaysia Construction Industry : focus on the conventional method and the design and build method ent://SD_ILS/0/SD_ILS:149183 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Tee, Beng Hock<br/>Author&#160;Tee, Beng Hock<br/>Format:&#160;Books<br/>Call Number&#160;TH113.M3 T43 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Thesis (Master of Science (Construction Management)) - Universiti Teknologi Malaysia, 2000<br/> Kajian ke atas kontraktor binaan di dalam memenuhi keperluan pemaju untuk projek kompleks perniagaan ent://SD_ILS/0/SD_ILS:131212 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Lau, Lai Siong<br/>Author&#160;Lau, Lai Siong<br/>Format:&#160;Books<br/>Call Number&#160;TH4311 L38 2000 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas Projek (Sarjana Muda Senibina) - Universiti Teknologi Malaysia, 2000<br/> Perbandingan penggunaan &quot;metal formwork system&quot; dengan sistem acuan kayu : satu kajian kes ent://SD_ILS/0/SD_ILS:131296 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Wong, Kok Ching<br/>Author&#160;Wong, Kok Ching<br/>Format:&#160;Books<br/>Call Number&#160;TA682.44 W66 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas Projek (Sarjana Muda Senibina) - Universiti Teknologi Malaysia, 2000<br/> Kesan pemilihan kaedah pembinaan ke atas tempoh siap dan kos projek ent://SD_ILS/0/SD_ILS:144322 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Adlan Rafhan Burahan<br/>Author&#160;Adlan Rafhan Burahan<br/>Format:&#160;Books<br/>Call Number&#160;TH438 A34 2000 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> The role of cost saving and innovation in PFI projects ent://SD_ILS/0/SD_ILS:313205 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Construction Industry Council (Great Britain)<br/>Author&#160;Construction Industry Council (Great Britain)<br/>Format:&#160;Books<br/>Call Number&#160;TH438 R64 2000<br/>Publisher&#160;Thomas Telford,<br/>Publication Date&#160;2000<br/>ISBN&#160;9780727728791<br/> Kajian terhadap aplikasi teknik optimasi kos binaan di firma ukur bahan ent://SD_ILS/0/SD_ILS:131186 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Goh, Chong Ming<br/>Author&#160;Goh, Chong Ming<br/>Format:&#160;Books<br/>Call Number&#160;TH438 G63 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas Projek (Sarjana Muda Senibina) - Universiti Teknologi Malaysia, 2000<br/> Best practices for multi-project management in the construction industry ent://SD_ILS/0/SD_ILS:141354 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Aminatuzuhariah Megat Abdullah<br/>Author&#160;Aminatuzuhariah Megat Abdullah<br/>Format:&#160;Books<br/>Call Number&#160;TH438 A44 2000<br/>Publisher&#160;University of Manchester Institute of Science and Technology,<br/>Publication Date&#160;2000<br/>Thesis (PhD) - University of Manchester Institute of Science and Technology, 2000<br/> Sistem pengurusan projek pembinaan di Jabatan Kerja Raya Daerah Johor Bahru ... [et al.] ent://SD_ILS/0/SD_ILS:13938 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Noorlizam Mohd. Monzai<br/>Author&#160;Mohd. Noorlizam Mohd. Monzai<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10624<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas Projek (Sarjana Muda Sains Komputer) - Universiti Teknologi Malaysia, 2000<br/> Implikasi kaedah pemberian kontrak bagi projek pembaikan dan penyenggaraan sekolah-sekolah di Sarawak ent://SD_ILS/0/SD_ILS:16803 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Affindi Jahari<br/>Author&#160;Affindi Jahari<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10280<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Senibina) - Universiti Teknologi Malaysia, 2000<br/> Best practices for multi-project management in the construction industry ent://SD_ILS/0/SD_ILS:17306 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Aminatuzuhariah Megat Abdullah<br/>Author&#160;Aminatuzuhariah Megat Abdullah<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11328<br/>Publisher&#160;University of Manchester Institute of Science and Technology,<br/>Publication Date&#160;2000<br/>Thesis (Ph.D.) - University of Manchester Institute of Science and Technology, 2000<br/> Penyediaan senarai kuantiti bagi kerja paip air ent://SD_ILS/0/SD_ILS:20419 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ahmad Ismail<br/>Author&#160;Ahmad Ismail<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11754<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/> Merekabentuk penguji kestabilan bangunan tinggi pada keadaan persekitaran ent://SD_ILS/0/SD_ILS:20494 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Azihan Ismail<br/>Author&#160;Azihan Ismail<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10555<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Mekanikal (Aeronautik)) - Universiti Teknologi Malaysia, 2000<br/> Pembangunan perisian analisis dan rekabentuk menara simpanan air menggunakan visual basic ent://SD_ILS/0/SD_ILS:21011 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Hong, Chin Yee<br/>Author&#160;Hong, Chin Yee<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12131<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Generation of velocity profile of solid particle conveying in pneumatic conveyor using optical sensor via cross correlation technique ent://SD_ILS/0/SD_ILS:21044 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Herlina Abdul Rahim, 1973-<br/>Author&#160;Herlina Abdul Rahim, 1973-<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12051<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Thesis (Sarjana Kejuruteraan (Elektrik)) - Universiti Teknologi Malaysia, 2000<br/> Tawaran secara rundingan : kesan masa dan kos projek berbanding tawaran secara terbuka ent://SD_ILS/0/SD_ILS:107172 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Nazli Mohamad<br/>Author&#160;Nazli Mohamad<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.A2 N394 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/> Peranan pengurusan projek dalam menangani masalah pengawalan masa dan kos dalam sektor pembinaan ent://SD_ILS/0/SD_ILS:98053 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Hazri Moh Khambali<br/>Author&#160;Mohd. Hazri Moh Khambali<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M63 1999 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 1999<br/> Perbezaan anggaran kos awal dengan kos pembinaan muktamad bagi projek sekolah ... [et al.] ent://SD_ILS/0/SD_ILS:13076 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Haliza Ishak<br/>Author&#160;Haliza Ishak,&#160;Jamaliah Salbi,&#160;Salmawati Mansor,&#160;Saw, Leng Aik,&#160;Sharina Farihah Hasan<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 9373<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas Projek (Sarjana Muda Bangunan) - Universiti Teknologi Malaysia, 1999<br/> Mempertingkat sistem bekalan air di daerah Kluang, Johor ent://SD_ILS/0/SD_ILS:16434 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Hamran Tukiman<br/>Author&#160;Hamran Tukiman<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10806<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Kriteria bangunan bestari ... [et al.] ent://SD_ILS/0/SD_ILS:163616 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Kamari Hashim<br/>Author&#160;Mohd. Kamari Hashim,&#160;Mohd. Nasroon Ab. Aziz,&#160;Mohd. Teguh Suria Mohd. Nordin,&#160;Nooryuzila Yusop,&#160;Nor Azian Hashim<br/>Format:&#160;Books<br/>Call Number&#160;MFL 9372 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas Projek (Sarjana Muda Bangunan) - Universiti Teknologi Malaysia, 1999<br/> Peningkatan kos keatas projek pembinaan jalan di kawasan Sumatera Barat, Indonesia ent://SD_ILS/0/SD_ILS:148378 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Radam<br/>Author&#160;Radam<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.I48 R33 1999 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Tesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 1999<br/> Pemantauan air bumi di Pulau Tioman ent://SD_ILS/0/SD_ILS:118784 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ahmad Nadzri Abdul Majid<br/>Author&#160;Ahmad Nadzri Abdul Majid<br/>Format:&#160;Books<br/>Call Number&#160;TD313.M3 A46 1999 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Pengurusan kualiti dalam pembinaan ent://SD_ILS/0/SD_ILS:131589 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Hanizan Md. Ishak<br/>Author&#160;Hanizan Md. Ishak<br/>Format:&#160;Books<br/>Call Number&#160;TA153 H36 1999<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> The challenges and potential of value management in local construction industry ent://SD_ILS/0/SD_ILS:588857 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Mohd. Mazlan Che Mat<br/>Author&#160;Mohd. Mazlan Che Mat<br/>Format:&#160;Computer file<br/>Publication Date&#160;1999<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=19686">Full text</a><br/> Cost of chaos ent://SD_ILS/0/SD_ILS:398508 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z Format:&#160;Books<br/>Call Number&#160;FLM 1530.01<br/>Publisher&#160;M &amp; M Audio Visual,<br/>Publication Date&#160;1999&#160;1998&#160;1997&#160;1996&#160;1995<br/> Rangkaian kawalan lalu lintas (ATC) berkomputer dalam pengurusan kejuruteraan lalu lintas ... [et al.] ent://SD_ILS/0/SD_ILS:8617 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Juliana Abd. Jalil<br/>Author&#160;Juliana Abd. Jalil,&#160;Amran Hamzah,&#160;Mohd. Hazri Moh Khambali,&#160;Mohd. Izuha Mohamed,&#160;Chong, Lip Hien<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 9450<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Cost of chaos ent://SD_ILS/0/SD_ILS:9856 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z Format:&#160;Visual Materials<br/>Call Number&#160;KVD 717.01<br/>Publisher&#160;M &amp; M Audio Visual,<br/>Publication Date&#160;1999&#160;1998&#160;1997&#160;1996&#160;1995<br/> Kajian terhadap kos membaikpulih kecacatan bangunan perumahan ... [et al. ] ent://SD_ILS/0/SD_ILS:13125 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Maslipah Idris<br/>Author&#160;Maslipah Idris,&#160;Mohamed Nizam Yusof,&#160;Rozaimah Mohd Jidin,&#160;Roziha Che Haron,&#160;Rozilah Talib<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 9358 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1999<br/> Keberkesanan rekabentuk dan teknik pembinaan terhadap kos pembinaan ... [et al.] ent://SD_ILS/0/SD_ILS:13130 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Jayaselvi R. Periasamy<br/>Author&#160;Jayaselvi R. Periasamy,&#160;Lee, Wei Koon,&#160;Norlida Mamad @ Samad,&#160;Nurulhuda Azizan<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 9306<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 1999<br/> Kajian potensi penggunaan 'Aerated Concrete Panel' tempatan untuk projek perumahan kos rendah ... [et al.] ent://SD_ILS/0/SD_ILS:13407 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Azhar Ab. Aziz<br/>Author&#160;Azhar Ab. Aziz,&#160;Hafizah Md. Halid,&#160;Ningkan Sampek,&#160;Noor Azlila Amir Sutan,&#160;Nornirahayu Tahir<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 9356<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1999<br/> Peranan juruukur bahan dalam pelaksanaan projek binaan di Indonesia ... [et al.] ent://SD_ILS/0/SD_ILS:13657 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Martalius Peli<br/>Author&#160;Martalius Peli,&#160;M. Taufik Malano,&#160;Putri Lynna A. Luthan,&#160;Radam,&#160;Zulfiatno<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10489<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Tesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 1999<br/> Proses-proses pembinaan dan anggaran kos menara tangki air ent://SD_ILS/0/SD_ILS:16335 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Adnan Abd. Ghani<br/>Author&#160;Adnan Abd. Ghani<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10204<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Penyediaan manual gulung-gulung dengan menggunakan keratan saluran bebibir ent://SD_ILS/0/SD_ILS:17129 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Chin, Chee Moon<br/>Author&#160;Chin, Chee Moon<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11036<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Pengurusan firma kontraktor binaan di dalam kegawatan ekonomi ent://SD_ILS/0/SD_ILS:108595 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Nor Azian Hashim<br/>Author&#160;Nor Azian Hashim<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.M3 N67 1999 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas Projek (Sarjana Muda Bangunan) - Universiti Teknologi Malaysia, 1999<br/> Perbezaan anggaran kos awal dengan kos pembinaan muktamad bagi projek sekolah ent://SD_ILS/0/SD_ILS:108711 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Haliza Ishak<br/>Author&#160;Haliza Ishak<br/>Format:&#160;Books<br/>Call Number&#160;LB3222 H34 1999 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1999<br/> Kajian keatas kelewatan pembayaran kemajuan ent://SD_ILS/0/SD_ILS:97129 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Abd. Latif Ismail<br/>Author&#160;Abd. Latif Ismail<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.M3 A22 1998 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1998<br/> Pembaziran bahan binaan untuk pembinaan jambatan : kes kajian : lintasan kedua Malaysia - Singapura ... [et al.] ent://SD_ILS/0/SD_ILS:13070 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Kang, Cheng Lai<br/>Author&#160;Kang, Cheng Lai,&#160;Md. Nizam Mutalip,&#160;Normila Ahmad,&#160;Rahim Abdul Rahman<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 9192<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Bangunan) - Universiti Teknologi Malaysia, 1998<br/> Kajian kualiti keselamatan struktur sementara di tapak bina ... [et al.] ent://SD_ILS/0/SD_ILS:13078 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Ahmad Dzia'uddin Mohamed, 1972-<br/>Author&#160;Ahmad Dzia'uddin Mohamed, 1972-,&#160;Nor Irwan Nordin,&#160;Norman Effendy Md. Mastur,&#160;Salina Che Ali,&#160;Wahida Abd. Rahman<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 9204<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1998<br/> Kajian terhadap kesesuaian graduan lepasan ijazah ukur bahan dari universiti tempatan dengan kehendak majikan firma ukur bahan ... [et al.] ent://SD_ILS/0/SD_ILS:13085 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Kartina Alaudin<br/>Author&#160;Kartina Alaudin,&#160;Khairil Nisaak Osman,&#160;Rafidah Mokhtar,&#160;Wong, Wei Yin,&#160;Yee, Chin Moi<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 9188<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1998<br/> Kajian ekonomi sistem penyejukan wilayah dengan kuasa haba storan ... [et al.] ent://SD_ILS/0/SD_ILS:13118 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Kasivishvanathan Muniandy<br/>Author&#160;Kasivishvanathan Muniandy,&#160;Normah Ali,&#160;Roziah Bujang,&#160;Wan Abd. Aziz Wan Muda,&#160;Zabidi Hashim<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 9314 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1998<br/> Mengurus pengawalan kos projek ent://SD_ILS/0/SD_ILS:131525 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Faridah Khamis<br/>Author&#160;Faridah Khamis<br/>Format:&#160;Books<br/>Call Number&#160;TH438 F38 1998<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Pembaziran bahan binaan untuk pembinaan jambatan : kes kajian : Lintasan Kedua Malaysia - Singapura ent://SD_ILS/0/SD_ILS:474212 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Kang, Cheng Lai<br/>Author&#160;Kang, Cheng Lai<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.M3 K36 1998 raf<br/>Publisher&#160;UTM,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Bangunan) - Universiti Teknologi Malaysia, 1998<br/> Kajian mengenai penggunaan kaedah perolehan kontrak pengurusan (management contracting) di industri binaan Malaysia ent://SD_ILS/0/SD_ILS:473459 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Yee, Chin Moi<br/>Author&#160;Yee, Chin Moi<br/>Format:&#160;Books<br/>Call Number&#160;TH425 Y43 1998 raf<br/>Publisher&#160;UTM,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1998<br/> Kajian terhadap implikasi lokasi projek pembinaan di kawasan bandar ke atas kos dan masa penyiapan ent://SD_ILS/0/SD_ILS:473951 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Normila Ahmad<br/>Author&#160;Normila Ahmad<br/>Format:&#160;Books<br/>Call Number&#160;TH435 N67 1998 raf<br/>Publisher&#160;UTM,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Bangunan) - Universiti Teknologi Malaysia, 1998<br/> Anggaran tuntutan kerugian dan perbelanjaan (loss and expenses) pihak kontraktor (tuntutan disebabkan oleh lanjutan tarikh penyiapan projek) ... [et al.] ent://SD_ILS/0/SD_ILS:307759 2024-06-12T05:03:29Z 2024-06-12T05:03:29Z by&#160;Abdul Halim Othman<br/>Author&#160;Abdul Halim Othman,&#160;Khairusy Syakirin Has-Yun Hashim,&#160;Shamala Ramasamy,&#160;Zainurin Zainul,&#160;Zaniroh Mat Saad @ Jaafar<br/>Format:&#160;Books<br/>Call Number&#160;MFL 9186<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1998<br/>