Search Results for Construction industry -- CostsSirsiDynix Enterprisehttp://portal.utm.my/client/en_AU/main/main/qu$003dConstruction$002bindustry$002b--$002bCosts$0026ps$003d300$0026isd$003dtrue?dt=list2024-06-12T05:03:29ZProject overhead costs allocation in oman's construction industry utilizing Activity - Based Costingent://SD_ILS/0/SD_ILS:5839002024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ammar Mohammed Salim Al-Ojaili<br/>Author Ammar Mohammed Salim Al-Ojaili<br/>Format: Computer file<br/>Call Number CP 020999 ra<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Thesis (Doktor Falsafah (Kejuruteraan Awam)) - Universiti Teknologi Malaysia, 2007<br/>Project overhead costs allocation in oman's construction industry utilizing Activity - Based Costingent://SD_ILS/0/SD_ILS:2674462024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ammar Mohammed Salim Al-Ojaili<br/>Author Ammar Mohammed Salim Al-Ojaili, Aminah Md. Yusof, supervisor<br/>Format: Books<br/>Call Number HF5686.C8 A55 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Thesis (Doktor Falsafah (Kejuruteraan Awam)) - Universiti Teknologi Malaysia, 2007<br/>Construction industryent://SD_ILS/0/SD_ILS:102322024-06-12T05:03:29Z2024-06-12T05:03:29ZFormat: Visual Materials<br/>Call Number MFL 7832<br/>Publication Date 2020 2019 2018 2017 2016<br/>Kerja-kerja meroboh bangunan; Cara, ke arah membantu, menasihat dan menjamin kejayaan pemborong binaan bumiputra; Kayu sebagai bahan utama dalam binaan rendah di Malaysia; Aspek kontrek dan amali pada peringkat penyelesaian dalam projek pembinaan; Creep settlement in clay; The effect of fiber-reinforcements on the structural properties of concrete-mixes; Industri binaan dalam rancangan pembangunan kerajaan; Industri binaan di Malaysia dahulu dan sekarangent://SD_ILS/0/SD_ILS:4196002024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ramar Subramaniam<br/>Author Ramar Subramaniam, Mohd. Shahir Yunus, Zainab Ahmad, Lim, Eng Keong, Rashiddi Hussein<br/>Format: Books<br/>Call Number MFL 7068 ra<br/>Publisher UTM,<br/>Publication Date 2020 2019 2018 2017 2016<br/>Tesis (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1978- Thesis (Bachelor of Civil Engineering) - Universiti Teknologi Malaysia, 1980- Tesis (Sarjana Muda Alam Bina) - Universiti Teknologi Malaysia, 1978<br/>Refereed journal : the Australian Institute of Quantity Surveyorsent://SD_ILS/0/SD_ILS:5384142024-06-12T05:03:29Z2024-06-12T05:03:29Zby Australian Institute of Quantity Surveyors<br/>Author Australian Institute of Quantity Surveyors<br/>Format: Continuing Resources<br/>Call Number TH435 R34 ol.1:no.1(1997)<br/>Publisher The Auatralian Institute of Quantity Surveyors,<br/>Publication Date 2020 2019 2018 2017 2016<br/>Adoption of contour crafting in cost effectiveness for 3D construction printing in Malaysiaent://SD_ILS/0/SD_ILS:8837672024-06-12T05:03:29Z2024-06-12T05:03:29Zby Liew, Jia Ming, 1988-, author<br/>Author Liew, Jia Ming, 1988-, author, Eeydzah Aminudin, 1987-, supervisor, Fakulti Kejuruteraan. Sekolah Kejuruteraan Awam<br/>Format: Books<br/>Call Number TS171.95 L54 2019 raf<br/>Publication Date 2019<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2019<br/>Adoption of contour crafting in cost effectiveness for 3D construction printing in Malaysiaent://SD_ILS/0/SD_ILS:8837682024-06-12T05:03:29Z2024-06-12T05:03:29Zby Liew, Jia Ming, 1988-, author<br/>Author Liew, Jia Ming, 1988-, author, Eeydzah Aminudin, 1987-, supervisor, Fakulti Kejuruteraan. Sekolah Kejuruteraan Awam<br/>Format: Electronic Resources<br/>Call Number CP 083222 ra<br/>Publication Date 2019<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2019<br/>Accounting for Construction : Frameworks, Productivity, Cost and Performanceent://SD_ILS/0/SD_ILS:8876422024-06-12T05:03:29Z2024-06-12T05:03:29Zby Best, Rick, editor<br/>Author Best, Rick, editor, Meikle, Jim, editor<br/>Format: Books<br/>Call Number TH438.15 A234 2019<br/>Publication Date 2019<br/>ISBN 9781138293977<br/>Project Risk and Opportunity Management : An Owner's Perspectiveent://SD_ILS/0/SD_ILS:8876432024-06-12T05:03:29Z2024-06-12T05:03:29Zby Johansen, Agnar, author<br/>Author Johansen, Agnar, author, Olsson, Nils O. E., author, Jergeas, George, author, Rolstadas, Asbjorn, author<br/>Format: Books<br/>Call Number HD69.P75 J644 2019<br/>Publication Date 2019<br/>ISBN 9781138365810<br/>Lean quality management system for construction process of steel works in constructionent://SD_ILS/0/SD_ILS:8747482024-06-12T05:03:29Z2024-06-12T05:03:29Zby Iylmiera Che Rosli, 1994-, author<br/>Author Iylmiera Che Rosli, 1994-, author, Abdul Kadir Marsono, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 I95 2018 raf<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/>Lean quality management system for construction process of steel works in constructionent://SD_ILS/0/SD_ILS:8747502024-06-12T05:03:29Z2024-06-12T05:03:29Zby Iylmiera Che Rosli, 1994-, author<br/>Author Iylmiera Che Rosli, 1994-, author<br/>Format: Books<br/>Call Number CP 080619 ra<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/>Cost analysis of construction technology for affordable housingent://SD_ILS/0/SD_ILS:8748092024-06-12T05:03:29Z2024-06-12T05:03:29Zby Yap, Zhen Shyong, 1993-, author<br/>Author Yap, Zhen Shyong, 1993-, author, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.M32 Y38 2018 raf<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/>Cost analysis of construction technology for affordable housingent://SD_ILS/0/SD_ILS:8748102024-06-12T05:03:29Z2024-06-12T05:03:29Zby Yap, Zhen Shyong, 1993-, author<br/>Author Yap, Zhen Shyong, 1993-, author<br/>Format: Books<br/>Call Number CP 080650 ra<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/>Roadmap for implementing value management in the Nigerian construction industryent://SD_ILS/0/SD_ILS:8819062024-06-12T05:03:29Z2024-06-12T05:03:29Zby Bruno Lot Tanko, 1982-, author<br/>Author Bruno Lot Tanko, 1982-, author, Fadhlin Abdullah, supervisor, Zuhaili Mohamad Ramly, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number TS168 B78 2018 raf<br/>Publication Date 2018<br/>Thesis (Doktor Falsafah) - Universiti Teknologi Malaysia, 2018<br/>Roadmap for implementing value management in the Nigerian construction industryent://SD_ILS/0/SD_ILS:8819072024-06-12T05:03:29Z2024-06-12T05:03:29Zby Bruno Lot Tanko, 1982-, author<br/>Author Bruno Lot Tanko, 1982-, author, Fadhlin Abdullah, supervisor, Zuhaili Mohamad Ramly, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Electronic Resources<br/>Call Number CP 082894 ra<br/>Publication Date 2018<br/>Thesis (Doktor Falsafah) - Universiti Teknologi Malaysia, 2018<br/>The cost benefits of building information modeling (BIM) in Malaysian construction industryent://SD_ILS/0/SD_ILS:8696882024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chin, Li Wei, 1991- , author<br/>Author Chin, Li Wei, 1991- , author, Chai, Chang Sa'ar, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(869688.1)<br/>Publication Date 2017<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/>Critical influencing factors to construction cost in planning stageent://SD_ILS/0/SD_ILS:8706922024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lau, Sie Yuong, 1990- , author<br/>Author Lau, Sie Yuong, 1990- , author<br/>Format: Books<br/>Call Number CP 065521 ra<br/>Publication Date 2017<br/>Sarjana Kejuruteraan (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2017<br/>Critical influencing factors to construction cost in planning stageent://SD_ILS/0/SD_ILS:8706842024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lau, Sie Yuong, 1990- , author<br/>Author Lau, Sie Yuong, 1990- , author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 L38 2017 raf<br/>Publication Date 2017<br/>Sarjana Kejuruteraan (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2017<br/>The cost benefits of building information modeling (BIM) in Malaysian construction industryent://SD_ILS/0/SD_ILS:8633982024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chin, Li Wei, 1991- author<br/>Author Chin, Li Wei, 1991- author, Chai, Chang Sa'ar, 1985- supervisor, Ahmad Fauzi Ismail, 1966- supervisor, Md. Maniruzzaman A. Aziz, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(863398.2)<br/>Publication Date 2017<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembangunan)) - Universiti Teknologi Malaysia, 2017<br/>The cost benefits of building information modeling (BIM) in Malaysian construction industryent://SD_ILS/0/SD_ILS:8696902024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chin, Li Wei, 1991- , author<br/>Author Chin, Li Wei, 1991- , author<br/>Format: Books<br/>Call Number CP 065160 ra<br/>Publication Date 2017<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2017<br/>Factors influencing project cost estimating for building contractors in Klang Valley, Malaysiaent://SD_ILS/0/SD_ILS:8633142024-06-12T05:03:29Z2024-06-12T05:03:29Zby Toh, Tien Choon, 1983- author<br/>Author Toh, Tien Choon, 1983- author, Kherun Nita Ali, supervisor, Uche Godwin Aliagha, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number XX(863314.2)<br/>Publication Date 2016<br/>Thesis (Ph.D (Ukur Bahan)) - Universiti Teknologi Malaysia, 2016<br/>Delivering Value with BIM : A whole-of-life approachent://SD_ILS/0/SD_ILS:8653682024-06-12T05:03:29Z2024-06-12T05:03:29Zby Sanchez, Adriana, editor<br/>Author Sanchez, Adriana, editor, Hampson, Keith (Keith Douglas), editor, Vaux, Simon, editor<br/>Format: Books<br/>Call Number TH438.13 D45 2016<br/>Publication Date 2016<br/>ISBN 9781138118997<br/>Factors influencing project cost estimating for building contractors in Klang Valley, Malaysiaent://SD_ILS/0/SD_ILS:8682302024-06-12T05:03:29Z2024-06-12T05:03:29Zby Toh, Tien Choon, 1983- author<br/>Author Toh, Tien Choon, 1983- author, Kherun Nita Ali, supervisor, Uche Godwin Aliagha, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number XX(868230.4)<br/>Publication Date 2016<br/>Thesis (Ph.D (Ukur Bahan)) - Universiti Teknologi Malaysia, 2016<br/>The influenced of construction work plan on cost effective in aluminium formwork systement://SD_ILS/0/SD_ILS:8486372024-06-12T05:03:29Z2024-06-12T05:03:29Zby Maryssa Alwyn Kisil, 1991-, author<br/>Author Maryssa Alwyn Kisil, 1991-, author, Rozana Zakaria, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 M373 2015 raf<br/>Publication Date 2015<br/>Project Paper (Sarjana Muda (Kejuruteraan Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2015<br/>The influenced of construction work plan on cost effective in aluminium formwork systement://SD_ILS/0/SD_ILS:8598502024-06-12T05:03:29Z2024-06-12T05:03:29Zby Maryssa Alwyn Kisil, 1991-, author<br/>Author Maryssa Alwyn Kisil, 1991-, author<br/>Format: Books<br/>Call Number CP 060935 ra<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2015<br/>Project Paper (Sarjana Muda (Kejuruteraan Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2015<br/>Safety budgeting cost for construction projectent://SD_ILS/0/SD_ILS:8214382024-06-12T05:03:29Z2024-06-12T05:03:29Zby Firdaus Abd. Latib 1983-<br/>Author Firdaus Abd. Latib 1983-, Abdul Rahim Abdul Hamid, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715 F57 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Overtime in minimizing construction delayent://SD_ILS/0/SD_ILS:8219152024-06-12T05:03:29Z2024-06-12T05:03:29Zby Syahmi Saari, 1989-<br/>Author Syahmi Saari, 1989-, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA682.26 S93 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Comparison for components of cost overrun in constructionent://SD_ILS/0/SD_ILS:8327072024-06-12T05:03:29Z2024-06-12T05:03:29Zby Liu, Linbo, 1990- author<br/>Author Liu, Linbo, 1990- author, Shaiful Amri Mansur, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715 L58 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>MEMS cost analysis : from laboratory to industryent://SD_ILS/0/SD_ILS:8337322024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lawes, Ronald A.<br/>Author Lawes, Ronald A.<br/>Format: Books<br/>Call Number TK7875 L39 2014<br/>Publisher Pan Stanford Publishing,<br/>Publication Date 2014<br/>ISBN 9789814411066<br/>Comparison for components of cost overrun in constructionent://SD_ILS/0/SD_ILS:8437092024-06-12T05:03:29Z2024-06-12T05:03:29Zby Liu, Linbo, 1990- author<br/>Author Liu, Linbo, 1990- author, Shaiful Amri Mansur, supervisor<br/>Format: Books<br/>Call Number CP 052116 ra<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Safety budgeting cost for construction projectent://SD_ILS/0/SD_ILS:8214462024-06-12T05:03:29Z2024-06-12T05:03:29Zby Firdaus Abd. Latib 1983-<br/>Author Firdaus Abd. Latib 1983-, Abdul Rahim Abdul Hamid<br/>Format: Books<br/>Call Number CP 050429 ra<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) –Universiti Teknologi Malaysia, 2014<br/>Overtime in minimizing construction delayent://SD_ILS/0/SD_ILS:8219192024-06-12T05:03:29Z2024-06-12T05:03:29Zby Syahmi Saari, 1989-<br/>Author Syahmi Saari, 1989-, Aminah Md. Yusof<br/>Format: Books<br/>Call Number CP 050628 ra<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Integrated Design and Cost Management for Civil Engineersent://SD_ILS/0/SD_ILS:8379102024-06-12T05:03:29Z2024-06-12T05:03:29Zby Whyte, Andrew, 1967-<br/>Author Whyte, Andrew, 1967-<br/>Format: Books<br/>Call Number TA177.4 W49 2014<br/>Publication Date 2014<br/>ISBN 9780415809214<br/>Constructive acceleration and costent://SD_ILS/0/SD_ILS:8423512024-06-12T05:03:29Z2024-06-12T05:03:29Zby Maslawati Monged, 1976-<br/>Author Maslawati Monged, 1976-, Jamaluddin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH435 M37 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>An evaluation of effectiveness of approximate quantity method in estimating construction costent://SD_ILS/0/SD_ILS:8201282024-06-12T05:03:29Z2024-06-12T05:03:29Zby Siew, Sik Nguong, 1989-<br/>Author Siew, Sik Nguong, 1989-, Khairulzan Yahya, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH435 S54 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Spon's architects' and builders' price bookent://SD_ILS/0/SD_ILS:8040072024-06-12T05:03:29Z2024-06-12T05:03:29Zby Langdon, Davis<br/>Author Langdon, Davis<br/>Format: Books<br/>Call Number TH435 S65 2013<br/>Edition 138th ed.<br/>Publisher Spon Press,<br/>Publication Date 2013<br/>ISBN 9780415680639<br/>Construction cost management : learning from case studiesent://SD_ILS/0/SD_ILS:8086382024-06-12T05:03:29Z2024-06-12T05:03:29Zby Potts, Keith F.<br/>Author Potts, Keith F., Ankrah, Nii<br/>Format: Books<br/>Call Number TA682.26 P68 2013<br/>Publication Date 2013<br/>ISBN 9780415629126 9780415629133<br/>Whole life sustainabilityent://SD_ILS/0/SD_ILS:8091402024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ellingham, Ian<br/>Author Ellingham, Ian, Fawcett, William<br/>Format: Books<br/>Call Number TH437 E45 2013<br/>Publisher RIBA Pub.,<br/>Publication Date 2013<br/>ISBN 9781859464502<br/>Estimate in formation of construction contractent://SD_ILS/0/SD_ILS:8184032024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ezatul Sharida Ahmad Termizi, 1988-<br/>Author Ezatul Sharida Ahmad Termizi, 1988-, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 E93 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Estimate in formation of construction contractent://SD_ILS/0/SD_ILS:8184182024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ezatul Sharida Ahmad Termizi, 1988-<br/>Author Ezatul Sharida Ahmad Termizi, 1988-<br/>Format: Books<br/>Call Number CP 031772 ra<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>An evaluation of effectiveness of approximate quantity method in estimating construction costent://SD_ILS/0/SD_ILS:8218222024-06-12T05:03:29Z2024-06-12T05:03:29Zby Siew, Sik Nguong, 1989-<br/>Author Siew, Sik Nguong, 1989-, Khairulzan Yahya, supervisor, Fakulti Pengurusan<br/>Format: Books<br/>Call Number CP 032676 ra<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) – Universiti Teknologi Malaysia, 2013<br/>Application of earned value analysis (EVA) in construction project in Malaysiaent://SD_ILS/0/SD_ILS:7937142024-06-12T05:03:29Z2024-06-12T05:03:29Zby Pung, Geik Ying, 1989-<br/>Author Pung, Geik Ying, 1989-, Razali Abdul Hamid, supervisor, Syamsul Hendra Mahmud, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 P86 2013 raf<br/>Publication Date 2013 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Spon's architects' and builders' price bookent://SD_ILS/0/SD_ILS:8373202024-06-12T05:03:29Z2024-06-12T05:03:29Zby Langdon, Davis<br/>Author Langdon, Davis<br/>Format: Books<br/>Call Number TH435 S66 2012 r<br/>Edition 137th ed.<br/>Publisher Spon Press,<br/>Publication Date 2013<br/>ISBN 9780415680639<br/>Kesan terhadap kos-kos yang terlibat dalam kerja-kerja pencepatan bagi projek pembinaanent://SD_ILS/0/SD_ILS:7935832024-06-12T05:03:29Z2024-06-12T05:03:29Zby Cheong, Muk Lim, 1990-<br/>Author Cheong, Muk Lim, 1990-, Razali Abdul Hamid, supervisor, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA682.26 C44 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Comparing conventional to industrialised building system construction costing a case study of school building projectsent://SD_ILS/0/SD_ILS:7782762024-06-12T05:03:29Z2024-06-12T05:03:29Zby Zuraidah Abdul Aziz, 1985-<br/>Author Zuraidah Abdul Aziz, 1985-<br/>Format: Books<br/>Call Number CP 027486 ra<br/>Publication Date 2012<br/>Thesis (Sarjana Sains Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2012<br/>Cost control system for construction siteent://SD_ILS/0/SD_ILS:7786922024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lim, Yong Khin, 1986-<br/>Author Lim, Yong Khin, 1986-<br/>Format: Books<br/>Call Number CP 027374 ra<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Time and budget overrun in the construction of town houses in Dubai U.A.Eent://SD_ILS/0/SD_ILS:7908422024-06-12T05:03:29Z2024-06-12T05:03:29Zby Abdul Wahab Shaikh, 1971-<br/>Author Abdul Wahab Shaikh, 1971-, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH435 A23 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Requirement of value management in construction sector at Malaysian Airports Holdings Berhad (MAHB)ent://SD_ILS/0/SD_ILS:7911762024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Naim Hamid, 1968-<br/>Author Mohd. Naim Hamid, 1968-<br/>Format: Books<br/>Call Number CP 027991 ra<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Cost comparison between IBS and conventional methods of constructionent://SD_ILS/0/SD_ILS:7914122024-06-12T05:03:29Z2024-06-12T05:03:29Zby Reza Lak Ghasemabadi, 1978-<br/>Author Reza Lak Ghasemabadi, 1978-<br/>Format: Books<br/>Call Number CP 027980 ra<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Comparing conventional to industrialised building system construction costing : a case study of school building projectsent://SD_ILS/0/SD_ILS:7756712024-06-12T05:03:29Z2024-06-12T05:03:29Zby Zuraidah Abdul Aziz, 1985-<br/>Author Zuraidah Abdul Aziz, 1985-, Abdul Kadir Marsono, Masine Md. Tap, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH437 Z87 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Pengawalan kos projek pembinaan oleh kontraktorent://SD_ILS/0/SD_ILS:7758412024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohamad Sofiuddin Abdul Rahman, 1987-<br/>Author Mohamad Sofiuddin Abdul Rahman, 1987-, Bachan Singh, supervisor, Zakaria Mohd. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH435 M76 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Cost control system for construction siteent://SD_ILS/0/SD_ILS:7758802024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lim, Yong Khin, 1986-<br/>Author Lim, Yong Khin, 1986-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH435 L56 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Pengawalan kos projek pembinaan oleh kontraktorent://SD_ILS/0/SD_ILS:7787462024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohamad Sofiuddin Abdul, 1987- Rahman<br/>Author Mohamad Sofiuddin Abdul, 1987- Rahman<br/>Format: Books<br/>Call Number CP 027353 ra<br/>Publication Date 2012<br/>Thesis (Sarjana) - Universiti Teknologi Malaysia, 2012<br/>Cost comparison between IBS and conventional methods of constructionent://SD_ILS/0/SD_ILS:7864042024-06-12T05:03:29Z2024-06-12T05:03:29Zby Reza Lak Ghasemabadi, 1978-<br/>Author Reza Lak Ghasemabadi, 1978-, Ahmad Baharuddin Abd. Rahman, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA682.26 R49 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Requirement of value management in construction sector at Malaysian Airports Holdings Berhad (MAHB)ent://SD_ILS/0/SD_ILS:7908472024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Naim Hamid, 1968-<br/>Author Mohd. Naim Hamid, 1968-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 M644 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Time and budget overrun in the construction of town houses in Dubai U.A.Eent://SD_ILS/0/SD_ILS:7912032024-06-12T05:03:29Z2024-06-12T05:03:29Zby Abdul Wahab Shaikh, 1971-<br/>Author Abdul Wahab Shaikh, 1971-<br/>Format: Books<br/>Call Number CP 027950 ra<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>The relationship between construction resource management to costs and profits from the perspective of contractor companiesent://SD_ILS/0/SD_ILS:7937152024-06-12T05:03:29Z2024-06-12T05:03:29Zby Matheson Tuah Anak Norma, 1990-, author<br/>Author Matheson Tuah Anak Norma, 1990-, author, Fuziah Ismail, supervisor, Tantish Kamaruddin, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 M38 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>The study on impact of project delay to construction costent://SD_ILS/0/SD_ILS:8022682024-06-12T05:03:29Z2024-06-12T05:03:29Zby Dimas Maulana, 1984- author<br/>Author Dimas Maulana, 1984- author, Fakulti Alam Bina<br/>Format: Books<br/>Call Number CP 029784 ra<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/>Modern construction : lean project delivery and integrated practicesent://SD_ILS/0/SD_ILS:6308732024-06-12T05:03:29Z2024-06-12T05:03:29Zby Forbes, Lincoln H.<br/>Author Forbes, Lincoln H., Ahmed, Syed M. (Syed Mahmood), 1960-<br/>Format: Books<br/>Call Number TH145 F674 2011<br/>Publisher CRC Press,<br/>Publication Date 2011<br/>ISBN 9781420063127<br/>Jadual kadar harga kerja-kerja kecil dan pembaikanent://SD_ILS/0/SD_ILS:8262912024-06-12T05:03:29Z2024-06-12T05:03:29Zby Malaysia. Kementerian Kerja Raya. Jabatan Kerja Raya. Bahagian Perolehan dan Khidmat Kos, Cawangan kontrak & ukur bahan<br/>Author Malaysia. Kementerian Kerja Raya. Jabatan Kerja Raya. Bahagian Perolehan dan Khidmat Kos, Cawangan kontrak & ukur bahan<br/>Format: Books Other<br/>Call Number TA682.26 M35 2011 wr<br/>Publisher Jabatan Kerja Raya,<br/>Publication Date 2011<br/>ISSN 13940910<br/>Cost control in construction phase in joint operation contractors : a case study of joint operation contractors in Sumatera Indonesiaent://SD_ILS/0/SD_ILS:8022112024-06-12T05:03:29Z2024-06-12T05:03:29Zby Aditya Muhammad Yuwono, 1981-<br/>Author Aditya Muhammad Yuwono, 1981-<br/>Format: Books<br/>Call Number CP 029503 ra<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/>Analysis of factors affecting the accuracy of early cost estimate in construction projectsent://SD_ILS/0/SD_ILS:8022702024-06-12T05:03:29Z2024-06-12T05:03:29Zby Dodi Ardianto, 1978-<br/>Author Dodi Ardianto, 1978-<br/>Format: Books<br/>Call Number CP 030083 ra<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/>Cost monitoring for construction works carried out by class F contractorsent://SD_ILS/0/SD_ILS:7651852024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ling, Grace Siew Jiuan, 1987-, author<br/>Author Ling, Grace Siew Jiuan, 1987-, author, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(765185.1)<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Cost monitoring for construction works carried out by class F contractorsent://SD_ILS/0/SD_ILS:7674582024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ling, Grace Siew Jiuan, 1987-, author<br/>Author Ling, Grace Siew Jiuan, 1987-, author<br/>Format: Books<br/>Call Number CP 051930 ra<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Pelaksanaan rekabentuk jalan dengan menggunakan pendekatan pengurusan nilaient://SD_ILS/0/SD_ILS:7728742024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lim, Keat Eng, 1967-<br/>Author Lim, Keat Eng, 1967-, Hishamuddin Mohd. Ali, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number TH438 L565 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Aset dan Pengurusan Fasiliti)) - Universiti Teknologi Malaysia, 2011<br/>Analysis of factors affecting the accuracy of early cost estimate in construction projectsent://SD_ILS/0/SD_ILS:7752352024-06-12T05:03:29Z2024-06-12T05:03:29Zby Dodi Ardianto, 1978-<br/>Author Dodi Ardianto, 1978-, Razali Abdul Hamid, supervisor, Ahmad Rosdan Razak, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH437 D63 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/>Cost control in construction phase in joint operation contractors : a case study of joint operation contractors in Sumatera Indonesiaent://SD_ILS/0/SD_ILS:7753282024-06-12T05:03:29Z2024-06-12T05:03:29Zby Aditya Muhammad Yuwono, 1981-<br/>Author Aditya Muhammad Yuwono, 1981-, Razali Adul Hamid, supervisor, Fadhlin Abdullah, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 A357 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/>Pelaksanaan rekabentuk jalan dengan menggunakan pendekatan pengurusan nilaient://SD_ILS/0/SD_ILS:7728752024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lim, Keat Eng, 1967-<br/>Author Lim, Keat Eng, 1967-<br/>Format: Books<br/>Call Number CP 025161 ra<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Aset dan Pengurusan Fasiliti)) - Universiti Teknologi Malaysia, 2011<br/>The study on impact of project delay to construction costent://SD_ILS/0/SD_ILS:7752402024-06-12T05:03:29Z2024-06-12T05:03:29Zby Dimas Maulana, 1984-<br/>Author Dimas Maulana, 1984-, Razali Abdul Hamid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA682.26 D56 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/>Konsep kos kitaran hayat dalam industri pembinaanent://SD_ILS/0/SD_ILS:7773932024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ahmad Safarin Saad, 1988- , author<br/>Author Ahmad Safarin Saad, 1988- , author, Wan Yusoff Wan Mahmood, supervisor, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH435 A36 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Lanjutan masa berikutan perubahan cuaca luar biasaent://SD_ILS/0/SD_ILS:7775342024-06-12T05:03:29Z2024-06-12T05:03:29Zby Muhammad Zulawal Zynuddin, 1989-<br/>Author Muhammad Zulawal Zynuddin, 1989-, Nur Emma Mustaffa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 M84 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Pengurusan aliran tunai syarikat pembinaanent://SD_ILS/0/SD_ILS:7807372024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Nur Iman Al Hafiz Mohd. Jamil, 1987-<br/>Author Mohd. Nur Iman Al Hafiz Mohd. Jamil, 1987-, Jamaluddin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438.15 M66 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2011<br/>Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunkerent://SD_ILS/0/SD_ILS:6032242024-06-12T05:03:29Z2024-06-12T05:03:29Zby Tan, Swee Kok, 1979-<br/>Author Tan, Swee Kok, 1979-, Fakulti Kejuruteraan Awam<br/>Format: Computer file<br/>Call Number CP 020698 ra<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>The facility management handbookent://SD_ILS/0/SD_ILS:6443072024-06-12T05:03:29Z2024-06-12T05:03:29Zby Cotts, David G.<br/>Author Cotts, David G., Roper, Kathy O., Payant, Richard P.<br/>Format: Books<br/>Call Number HD1394 C67 2010<br/>Edition 3rd ed.<br/>Publisher American Management Association,<br/>Publication Date 2010<br/>ISBN 9780814413807<br/>A green cost allocation model for office and commercial buildings in Malaysiaent://SD_ILS/0/SD_ILS:7299522024-06-12T05:03:29Z2024-06-12T05:03:29Zby Behzad Hamidi, 1986-<br/>Author Behzad Hamidi, 1986-, Muhd. Zaimi Abd. Majid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 B44 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>A green cost allocation model for office and commercial buildings in Malaysiaent://SD_ILS/0/SD_ILS:7299532024-06-12T05:03:29Z2024-06-12T05:03:29Zby Behzad Hamidi, 1986-<br/>Author Behzad Hamidi, 1986-<br/>Format: Books<br/>Call Number CP 023695 ra<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Factor influencing the selection of extension of time and delay analysis in legal casesent://SD_ILS/0/SD_ILS:7691622024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ronnie Aslina Goring, 1983-<br/>Author Ronnie Aslina Goring, 1983-, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 R66 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Pembiayaan projek secara Islam dikalangan pemaju perumahanent://SD_ILS/0/SD_ILS:7776732024-06-12T05:03:29Z2024-06-12T05:03:29Zby Noralvina Nazri, 1987-, author<br/>Author Noralvina Nazri, 1987-, author, Norazam Othman, supervisor, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438.15 N67 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/>Factor influencing the selection of extension of time and delay analysis in legal casesent://SD_ILS/0/SD_ILS:7691672024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ronnie Aslina Goring, 1983-<br/>Author Ronnie Aslina Goring, 1983-<br/>Format: Books<br/>Call Number CP 024690 ra<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Impak strategi bangunan hijau ke atas prestasi bangunan di dalam konteks keselesaan penghunient://SD_ILS/0/SD_ILS:7696312024-06-12T05:03:29Z2024-06-12T05:03:29Zby Subiah Sulaiman, 1963-<br/>Author Subiah Sulaiman, 1963-, Hishamuddin Mohd. Ali, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number TH145 S83 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Aset dan Fasiliti)) - Universiti Teknologi Malaysia, 2010<br/>Impak strategi bangunan hijau ke atas prestasi bangunan di dalam konteks keselesaan penghunient://SD_ILS/0/SD_ILS:7696322024-06-12T05:03:29Z2024-06-12T05:03:29Zby Subiah Sulaiman, 1963-<br/>Author Subiah Sulaiman, 1963-<br/>Format: Books<br/>Call Number CP 025389 ra<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Aset dan Fasiliti)) - Universiti Teknologi Malaysia, 2010<br/>Tuntutan kerugian terhadap perbelanjaan tambahan ke atas kerja-kerja awalan akibat daripada lanjutan masaent://SD_ILS/0/SD_ILS:7801002024-06-12T05:03:29Z2024-06-12T05:03:29Zby Siti Nabilah Abdullah, 1980-<br/>Author Siti Nabilah Abdullah, 1980-, Mohd. Saidin Misnan, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 S584 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/>Kajian perlaksanaan projek pembinaan bangunan kediaman yang melibatkan kenaikan kos dan kelewatan siap (MK Land Holdings Berhad)ent://SD_ILS/0/SD_ILS:7815662024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Fazli Lajak, 1973-<br/>Author Mohd. Fazli Lajak, 1973-, Ahmad Rosdan Razak, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH437 M434 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Kajian kos pemulihan projek perumahan terbengkalaient://SD_ILS/0/SD_ILS:7783462024-06-12T05:03:29Z2024-06-12T05:03:29Zby Nor Azian Wagiman, 1980-<br/>Author Nor Azian Wagiman, 1980-, Mohd. Saidin Misnan, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA145 N676 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Masalah kewangan pihak pemaju perumahan yang mendorong masalah projek terbengkalaient://SD_ILS/0/SD_ILS:7803782024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ronna Malissa Lo, 1986-<br/>Author Ronna Malissa Lo, 1986-, Zuhaili Mohamad Ramly, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA145 R66 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2010<br/>Development of quantitative quality cost matrix for Malaysian construction quality management systement://SD_ILS/0/SD_ILS:6036782024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mukhtar Che Ali, 1958-<br/>Author Mukhtar Che Ali, 1958-, Fakulti Kejuruteraan Awam<br/>Format: Computer file<br/>Call Number CP 017412 ra<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Development of quantitative quality cost matrix for Malaysian construction quality management systement://SD_ILS/0/SD_ILS:3923492024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mukhtar Che Ali, 1958-<br/>Author Mukhtar Che Ali, 1958-, Rosli Mohamad Zin, supervisor, Zuhairi Abdul Hamid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD62.15 M84 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunkerent://SD_ILS/0/SD_ILS:3885942024-06-12T05:03:29Z2024-06-12T05:03:29Zby Tan, Swee Kok, 1979-<br/>Author Tan, Swee Kok, 1979-, Rozana Zakaria, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 T367 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>A framework for cost assessment of QMS for building contractors based on biological immune systement://SD_ILS/0/SD_ILS:3620872024-06-12T05:03:29Z2024-06-12T05:03:29Zby Keyvanfar, Ali, 1981-<br/>Author Keyvanfar, Ali, 1981-, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH435 A44 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Kajian kesan kenaikan harga sumber binaan hasil daripada kenaikan harga bahan bakarent://SD_ILS/0/SD_ILS:3781592024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ng, Kah Wai<br/>Author Ng, Kah Wai, Ahmad Rosdan Abd. Razak, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438.15 N54 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Kesan peningkatan harga bahan binaan terhadap industri pembinaan di Malaysiaent://SD_ILS/0/SD_ILS:3814862024-06-12T05:03:29Z2024-06-12T05:03:29Zby Wan Liyana Wan Abd. Halim<br/>Author Wan Liyana Wan Abd. Halim, Asiah Othman, supervisor, Fakulti Kejuruteraan dan Sains Geoinformasi<br/>Format: Books<br/>Call Number TH438.15 W36 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2009<br/>Cost of compliance with safety and health requirements in construction siteent://SD_ILS/0/SD_ILS:6021112024-06-12T05:03:29Z2024-06-12T05:03:29Zby Akmal Wani Sulong, 1985-<br/>Author Akmal Wani Sulong, 1985-, Fakulti Kejuruteraan Awam<br/>Format: Computer file<br/>Call Number CP 018511 ra<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Financial management and accounting fundamentals for constructionent://SD_ILS/0/SD_ILS:6378042024-06-12T05:03:29Z2024-06-12T05:03:29Zby Halpin, Daniel W.<br/>Author Halpin, Daniel W., Senior, Bolivar A.<br/>Format: Books<br/>Call Number TH435 H34 2009<br/>Publisher Wiley,<br/>Publication Date 2009<br/>ISBN 9780470182710<br/>The commercial real estate revolution : nine transforming keys to lowering costs, cutting waste, and driving change in a broken industryent://SD_ILS/0/SD_ILS:7503232024-06-12T05:03:29Z2024-06-12T05:03:29Zby Miller, M. Rex, 1955-<br/>Author Miller, M. Rex, 1955-<br/>Format: Books<br/>Call Number HD9715 .U62 C66 2009<br/>Publisher Wiley,<br/>Publication Date 2009<br/>ISBN 9780470457467<br/>Hubungkait kos kualiti dengan kualiti pembinaan di Malaysiaent://SD_ILS/0/SD_ILS:7816312024-06-12T05:03:29Z2024-06-12T05:03:29Zby Norazlina Ismail<br/>Author Norazlina Ismail, Ismail Haron, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA682.26 N67 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/>Mengenalpasti kos penggunaan aluminium composite panel bagi pembinaan bangunan kerajaanent://SD_ILS/0/SD_ILS:7787632024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Sapawi Hussin, 1979-<br/>Author Mohd. Sapawi Hussin, 1979-, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA403 M734 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/>Tahap ketetapan anggaran kos pra-tender bagi pembinaan Balai Polis di Malaysiaent://SD_ILS/0/SD_ILS:7816182024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Fadzil Mohd. Jali, 1978-<br/>Author Mohd. Fadzil Mohd. Jali, 1978-, Sarajul Fikri Mohamed, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA682.26 M43 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/>Sumber rujukan kerja-kerja penyediaan anggaranent://SD_ILS/0/SD_ILS:7816242024-06-12T05:03:29Z2024-06-12T05:03:29Zby Nur Arnisa Ahmed, 1977-<br/>Author Nur Arnisa Ahmed, 1977-, Syamsul Hendra Mahmud, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA682.26 N87 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/>A framework for cost assessment of QMS for building contractors based on biological immune systement://SD_ILS/0/SD_ILS:5979492024-06-12T05:03:29Z2024-06-12T05:03:29Zby Keyvanfar, Ali, 1981-<br/>Author Keyvanfar, Ali, 1981-, Fakulti Kejuruteraan Awam<br/>Format: Computer file<br/>Call Number CP 017682 ra<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Construction waste composition and cost of the residental construction projectent://SD_ILS/0/SD_ILS:5970952024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lee, Hee Seen<br/>Author Lee, Hee Seen, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number CP 019168 ra<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Ketepatan penyediaan anggaran kos pembinaan yang disediakan oleh kontraktor untuk projek jambatanent://SD_ILS/0/SD_ILS:3819022024-06-12T05:03:29Z2024-06-12T05:03:29Zby Sari Murti<br/>Author Sari Murti, Zakaria Mohd. Yusof, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA682.26 S27 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Kenaikan harga simen dan besi tetulang kepada kontraktor binaan dalam pelaksanaan projek pembinaanent://SD_ILS/0/SD_ILS:3772682024-06-12T05:03:29Z2024-06-12T05:03:29Zby Nurulhuda Ibrahim<br/>Author Nurulhuda Ibrahim<br/>Format: Books<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/>Cost of compliance with safety and health requirements in construction siteent://SD_ILS/0/SD_ILS:3798542024-06-12T05:03:29Z2024-06-12T05:03:29Zby Akmal Wani Sulong, 1985-<br/>Author Akmal Wani Sulong, 1985-, Aziruddin Ressang, supervisor, Ahmad Fauzi Awang, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH443 A35 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Evaluating contract claimsent://SD_ILS/0/SD_ILS:2900682024-06-12T05:03:29Z2024-06-12T05:03:29Zby Davison, R. Peter<br/>Author Davison, R. Peter, Mullen, John, 1959-<br/>Format: Books<br/>Call Number TH425 D38 2009<br/>Edition 2nd ed.<br/>Publisher John Wiley,<br/>Publication Date 2009<br/>ISBN 9781405159203<br/>Impact of cement shortage and methods used by contractors to overcome itent://SD_ILS/0/SD_ILS:3029812024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chua, Simon Soon Hua<br/>Author Chua, Simon Soon Hua, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA403.6 C82 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Keperluan dan kos peralatan keselamatan bagi kerja-kerja kejuruteraan mekanikal dan elektrikal di tapak binaent://SD_ILS/0/SD_ILS:3034292024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohamad Azhari Zarzali Shah<br/>Author Mohamad Azhari Zarzali Shah<br/>Format: Books<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/>Schedule of rateent://SD_ILS/0/SD_ILS:3453542024-06-12T05:03:29Z2024-06-12T05:03:29Zby Malaysia. Kementerian Kerja Raya. Jabatan Kerja Raya<br/>Author Malaysia. Kementerian Kerja Raya. Jabatan Kerja Raya<br/>Format: Books<br/>Call Number TH435 M35 2009 wr<br/>Publisher Jabatan Kerja Raya,<br/>Publication Date 2009<br/>Finance and control for constructionent://SD_ILS/0/SD_ILS:3312492024-06-12T05:03:29Z2024-06-12T05:03:29Zby March, Chris<br/>Author March, Chris<br/>Format: Books<br/>Call Number TH438.15 M37 2009<br/>Publisher Taylor & Francis,<br/>Publication Date 2009<br/>ISBN 9780415371148<br/>The impact of uncertainty in cement prices to construction industry in Malaysiaent://SD_ILS/0/SD_ILS:3568782024-06-12T05:03:29Z2024-06-12T05:03:29Zby Noor Emiwati Abu Hassan<br/>Author Noor Emiwati Abu Hassan, Arham Abdullah, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA682.26 N66 2009 raf<br/>Publication Date 2009<br/>Project Paper Sarjana Muda (Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>The impact of uncertainty in cement prices to construction industry in Malaysiaent://SD_ILS/0/SD_ILS:3568812024-06-12T05:03:29Z2024-06-12T05:03:29Zby Noor Emiwati Abu Hassan<br/>Author Noor Emiwati Abu Hassan, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number CP 019181 ra<br/>Publication Date 2009<br/>Project Paper Sarjana Muda (Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Construction waste composition and cost of the residental construction projectent://SD_ILS/0/SD_ILS:3576612024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lee, Hee Seen<br/>Author Lee, Hee Seen, Khairulzan Yahya, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TD897 L44 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Permintaan dan penawaran bahan binaan bagi projek perumahanent://SD_ILS/0/SD_ILS:3032482024-06-12T05:03:29Z2024-06-12T05:03:29Zby Nor Huzaidah Naim<br/>Author Nor Huzaidah Naim, Nurshikin Mohamad Shukery, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 N6745 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Pengurusan kos overhead dalam projek pembinaan di Malaysiaent://SD_ILS/0/SD_ILS:2342192024-06-12T05:03:29Z2024-06-12T05:03:29Zby Azamuddin Arsad<br/>Author Azamuddin Arsad, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA682.26 A93 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Kesan diameter dan bilangan barisan bolt ke atas keupayaan momen bagi sambungan plat hujung sejajarent://SD_ILS/0/SD_ILS:2421802024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Saiful Anuar<br/>Author Mohd. Saiful Anuar, Arizu Sulaiman, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA492.B63 M64 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Collaborative usage of ICT DBMS in construction cost control : the post contract perspectivesent://SD_ILS/0/SD_ILS:2264512024-06-12T05:03:29Z2024-06-12T05:03:29Zby Shamsul Hadi Bandi<br/>Author Shamsul Hadi Bandi<br/>Format: Books<br/>Call Number TH437 S526 2008<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Factors determining contractors' profitent://SD_ILS/0/SD_ILS:2473342024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ili Liyana Azman<br/>Author Ili Liyana Azman, Fadhlin Abdullah, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA210 I45 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>The usage of tender price index and building material cost indexent://SD_ILS/0/SD_ILS:2473722024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lee, Chee Wey<br/>Author Lee, Chee Wey, Fadhlin Abdullah, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438.15 L43 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Analisa kos awalan dan tempoh pulang modal untuk pembekal atau kontraktor bagi projek yang menggunakan sistem acuan terowongent://SD_ILS/0/SD_ILS:2475002024-06-12T05:03:29Z2024-06-12T05:03:29Zby Md. Wazir Shafiq Mohd. Anuar<br/>Author Md. Wazir Shafiq Mohd. Anuar, Ismail Haron, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 M82 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Collaborative usage of ICT DBMS in construction cost control : requirements for development and users perceptionent://SD_ILS/0/SD_ILS:2528222024-06-12T05:03:29Z2024-06-12T05:03:29Zby Abdul Kadir Marsono<br/>Author Abdul Kadir Marsono, Masine Md. Tap, Shamsul Hadi Bandi, International Conference on Infrastructure Development (1st : 2008 : Kuala Lumpur)<br/>Format: Books<br/>Call Number TH438 A235 2008<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Kos kitaran hayat bagi bangunan dewan kuliahent://SD_ILS/0/SD_ILS:2533532024-06-12T05:03:29Z2024-06-12T05:03:29Zby Roslinda Rosly<br/>Author Roslinda Rosly, Razali Adul Hamid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH437 R674 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Delay analysis in construction contractsent://SD_ILS/0/SD_ILS:2595242024-06-12T05:03:29Z2024-06-12T05:03:29Zby Keane, P. J. (P. John)<br/>Author Keane, P. J. (P. John), Caletka, A. F. (Anthony F.)<br/>Format: Books<br/>Call Number HD9715.A2 K425 2008<br/>Publisher Wiley-Blackwell,<br/>Publication Date 2008 2007<br/>ISBN 9781405156547<br/>Collaborative usage of ICT DBMS in construction cost control the post contract perspectivesent://SD_ILS/0/SD_ILS:5799852024-06-12T05:03:29Z2024-06-12T05:03:29Zby Shamsul Hadi Bandi<br/>Author Shamsul Hadi Bandi<br/>Format: Computer file<br/>Call Number CP 015245<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Pengurusan kos overhead dalam projek pembinaan di Malaysiaent://SD_ILS/0/SD_ILS:5805702024-06-12T05:03:29Z2024-06-12T05:03:29Zby Azamuddin Arsad<br/>Author Azamuddin Arsad, Fakulti Kejuruteraan Awam<br/>Format: Computer file<br/>Call Number CP 023079 ra<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Kesan diameter dan bilangan barisan bolt ke atas keupayaan momen bagi sambungan plat hujung sejajarent://SD_ILS/0/SD_ILS:5818492024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Saiful Anuar<br/>Author Mohd. Saiful Anuar, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number CP 017734 ra<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Construction cost management : learning from case studiesent://SD_ILS/0/SD_ILS:2759732024-06-12T05:03:29Z2024-06-12T05:03:29Zby Potts, Keith F.<br/>Author Potts, Keith F.<br/>Format: Books<br/>Call Number TA682.26 P67 2008<br/>Publisher Taylor & Francis,<br/>Publication Date 2008<br/>ISBN 9780415442862<br/>Pengurusan aliran tunai dalam syarikat-syarikat pembinaanent://SD_ILS/0/SD_ILS:3008112024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Nur Iman Al Hafiz Mohd. Jamil<br/>Author Mohd. Nur Iman Al Hafiz Mohd. Jamil<br/>Format: Books<br/>Call Number TH435 N53 2008 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Analisis kos sistem binaan berindustri sistem konvensionalent://SD_ILS/0/SD_ILS:2240062024-06-12T05:03:29Z2024-06-12T05:03:29Zby Norazrina Mohd Salleh<br/>Author Norazrina Mohd Salleh, Razali Adul Hamid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438.15 N62 2007 raf<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda (Ukur Bahan)) -Universiti Teknologi Malaysia, 2007<br/>Kajian ke atas masalah-masalah kehilangan dan kerosakan bahan binaan ditapak binaent://SD_ILS/0/SD_ILS:2304032024-06-12T05:03:29Z2024-06-12T05:03:29Zby Sa'edah Hassan<br/>Author Sa'edah Hassan<br/>Format: Books<br/>Call Number TA403 S23 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Pembangunan dan penggunaan pengkalan data kos dan masa bagi maklumat pra pembinaan projekent://SD_ILS/0/SD_ILS:113722024-06-12T05:03:29Z2024-06-12T05:03:29Zby Afiza Atan<br/>Author Afiza Atan<br/>Format: Visual Materials<br/>Call Number MFL 13904<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Pembangunan model ramalan kos pembinaan projek bangunan di Malaysiaent://SD_ILS/0/SD_ILS:1484832024-06-12T05:03:29Z2024-06-12T05:03:29Zby Yap, Hui Chee<br/>Author Yap, Hui Chee<br/>Format: Books<br/>Call Number TH435 Y36 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Faktor-faktor utama yang mempengaruhi lebihan kos dan kelewatan dalam pembinaanent://SD_ILS/0/SD_ILS:1497352024-06-12T05:03:29Z2024-06-12T05:03:29Zby Wong, Chee Foong<br/>Author Wong, Chee Foong<br/>Format: Books<br/>Call Number TH435 W665 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Keadaan dimana kontraktor adalah layak untuk menuntut kos pencepatanent://SD_ILS/0/SD_ILS:1502602024-06-12T05:03:29Z2024-06-12T05:03:29Zby Tan, Elmund Chung Ten<br/>Author Tan, Elmund Chung Ten<br/>Format: Books<br/>Call Number TA210 T366 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Pembangunan dan penggunaan pengkalan data kos dan masa bagi maklumat pra pembinaan projekent://SD_ILS/0/SD_ILS:1471792024-06-12T05:03:29Z2024-06-12T05:03:29Zby Afiza Atan<br/>Author Afiza Atan<br/>Format: Books<br/>Call Number T58.6 A34 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Perbandingan perkhidmatan perunding kos dan kontrak binaan pelbagai negara di duniaent://SD_ILS/0/SD_ILS:1507462024-06-12T05:03:29Z2024-06-12T05:03:29Zby Rahayu Abdullah, 1984-<br/>Author Rahayu Abdullah, 1984-<br/>Format: Books<br/>Call Number TH438.15 R33 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Kesan kenaikan harga minyak terhadap kontraktor pembinaan di negeri Selangorent://SD_ILS/0/SD_ILS:1513472024-06-12T05:03:29Z2024-06-12T05:03:29Zby Phang, Chen Loong<br/>Author Phang, Chen Loong<br/>Format: Books<br/>Call Number TH435 P52 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Kos pembuangan sisa bangunan tinggi dan implikasi terhadap kos preliminariesent://SD_ILS/0/SD_ILS:1515702024-06-12T05:03:29Z2024-06-12T05:03:29Zby Armiza Abd. Rashid<br/>Author Armiza Abd. Rashid<br/>Format: Books<br/>Call Number TH438.15 A75 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>The framework for minimizing construction time and cost overruns in Padang and Pekanbaru, Indonesiaent://SD_ILS/0/SD_ILS:1555432024-06-12T05:03:29Z2024-06-12T05:03:29Zby Harisaweni<br/>Author Harisaweni<br/>Format: Books<br/>Call Number TH 425 .I48 H37 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=48871">Preview</a><br/>Thesis (Sarjana Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Ganti rugi tertentu dan ditetapkan serta kerugian majikanent://SD_ILS/0/SD_ILS:1199522024-06-12T05:03:29Z2024-06-12T05:03:29Zby P.Vickraman Prosothman<br/>Author P.Vickraman Prosothman<br/>Format: Books<br/>Call Number TH432 P84 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Metric construction cost dataent://SD_ILS/0/SD_ILS:2442402024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chiang, John H.<br/>Author Chiang, John H.<br/>Format: Books<br/>Call Number TH435 M47 2007<br/>Edition 66th annual ed.<br/>Publisher RSMeans,<br/>Publication Date 2007<br/>ISBN 9780876290491<br/>Hanscomb Yardsticks for Costing : cost Data for the Canadian Construction Industryent://SD_ILS/0/SD_ILS:2442582024-06-12T05:03:29Z2024-06-12T05:03:29ZFormat: Books<br/>Call Number TH435 H364 2007<br/>Publisher RSMeans,<br/>Publication Date 2007<br/>ISBN 9780876298756<br/>Persepsi pihak majikan terhadap graduan wanita di dalam kerjaya ukur bahanent://SD_ILS/0/SD_ILS:140622024-06-12T05:03:29Z2024-06-12T05:03:29ZFormat: Visual Materials<br/>Call Number MFL 13873<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Perancangan Bandar dan Wilayah) - Universiti Teknologi Malaysia, 2007<br/>Pembayaran kepada sub-kontraktorent://SD_ILS/0/SD_ILS:1236092024-06-12T05:03:29Z2024-06-12T05:03:29Zby Zainul Falah Jamil<br/>Author Zainul Falah Jamil<br/>Format: Books<br/>Call Number TH435 Z35 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Penilaian terhadap prestasi campuran stone mastic asphalt menggunakan serat kelapa sawitent://SD_ILS/0/SD_ILS:91102024-06-12T05:03:29Z2024-06-12T05:03:29Zby Intan Salwani Abdul Kadir<br/>Author Intan Salwani Abdul Kadir<br/>Format: Visual Materials<br/>Call Number MFL 13656<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/>Pembayaran interim hak-hak kontraktorent://SD_ILS/0/SD_ILS:91422024-06-12T05:03:29Z2024-06-12T05:03:29Zby Estelle, Liew Swee Ling<br/>Author Estelle, Liew Swee Ling<br/>Format: Visual Materials<br/>Call Number MFL 13572<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Kajian kemungkinan dalam pembangunan projek perumahanent://SD_ILS/0/SD_ILS:91562024-06-12T05:03:29Z2024-06-12T05:03:29Zby Cheong, Soo Lin<br/>Author Cheong, Soo Lin<br/>Format: Visual Materials<br/>Call Number MFL 13575<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Aplikasi GIS memproses kelulusan lokasi tapak kuari granit berdasarkan syarat-syarat yang telah ditentukan, dengan bantuan digital terrain modeling (DTM)ent://SD_ILS/0/SD_ILS:92222024-06-12T05:03:29Z2024-06-12T05:03:29Zby Muhamad Ihsan Sabri Romli<br/>Author Muhamad Ihsan Sabri Romli<br/>Format: Visual Materials<br/>Call Number MFL 13645<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Sains Geoinformatik) - Universiti Teknologi Malaysia, 2006<br/>Kesan orientasi susunan bata terhadap kekuatan mampatan kerja bataent://SD_ILS/0/SD_ILS:103242024-06-12T05:03:29Z2024-06-12T05:03:29Zby Juraemi Mohd. Yusak<br/>Author Juraemi Mohd. Yusak<br/>Format: Visual Materials<br/>Call Number MFL 13732<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/>Procurement in the construction industry : the impact and cost of alternative market and supply processesent://SD_ILS/0/SD_ILS:918652024-06-12T05:03:29Z2024-06-12T05:03:29Zby Hughes, Will<br/>Author Hughes, Will<br/>Format: Books<br/>Call Number TH435 P764 2006<br/>Publisher Taylor & Francis,<br/>Publication Date 2006<br/>ISBN 9780415395601<br/>Value and risk management : a guide to best practiceent://SD_ILS/0/SD_ILS:1284162024-06-12T05:03:29Z2024-06-12T05:03:29Zby Dallas, Michael<br/>Author Dallas, Michael<br/>Format: Books<br/>Call Number HD9715.A2 D34 2006<br/>Publisher Blackwell Publishing,<br/>Publication Date 2006<br/>ISBN 9781405120692<br/>Pemantauan kos diperingkat pembinaanent://SD_ILS/0/SD_ILS:1213202024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lim, Mei Li<br/>Author Lim, Mei Li<br/>Format: Books<br/>Call Number TH437 L554 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/>Kesan kenaikan dan penurunan harga keluli terhadap industri pembinaan di Malaysiaent://SD_ILS/0/SD_ILS:6202112024-06-12T05:03:29Z2024-06-12T05:03:29Zby Wan Nor Aishah Meor Hussain<br/>Author Wan Nor Aishah Meor Hussain<br/>Format: Computer file<br/>Call Number CP 7716<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2006<br/>Value management in construction industryent://SD_ILS/0/SD_ILS:6216182024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ng, Kim Lai<br/>Author Ng, Kim Lai<br/>Format: Computer file<br/>Call Number CP 7430<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/>Kesesuaian bahan yang diperuntukan dalam peruntukan perubahan harga bahan binaanent://SD_ILS/0/SD_ILS:4701502024-06-12T05:03:29Z2024-06-12T05:03:29Zby Maria Yusof<br/>Author Maria Yusof<br/>Format: Books<br/>Call Number TH435 M37 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Pembayaran terus kepada subkontraktor domestikent://SD_ILS/0/SD_ILS:4720352024-06-12T05:03:29Z2024-06-12T05:03:29Zby Syed Saiful Nizam Syed Mubarat<br/>Author Syed Saiful Nizam Syed Mubarat<br/>Format: Books<br/>Call Number TH435 S93 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Julat ketetapan anggaran kos rumah teres dua tingkatent://SD_ILS/0/SD_ILS:4701402024-06-12T05:03:29Z2024-06-12T05:03:29Zby Goh, Pei See<br/>Author Goh, Pei See<br/>Format: Books<br/>Call Number TH435 G63 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Pembiayaan kontraktor binaanent://SD_ILS/0/SD_ILS:4770362024-06-12T05:03:29Z2024-06-12T05:03:29Zby Salena Muhammad<br/>Author Salena Muhammad<br/>Format: Books<br/>Call Number TH435 S24 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2006<br/>Profil projek pembinaan terbengkalai di negeri Sabahent://SD_ILS/0/SD_ILS:91542024-06-12T05:03:29Z2024-06-12T05:03:29Zby Asniah Abidin<br/>Author Asniah Abidin<br/>Format: Visual Materials<br/>Call Number MFL 13631<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Pengaruh jenama terhadap pemilihan bahan binaan dan kelengkapan dalam projek pembinaanent://SD_ILS/0/SD_ILS:140642024-06-12T05:03:29Z2024-06-12T05:03:29Zby Haslinda Esahak<br/>Author Haslinda Esahak<br/>Format: Visual Materials<br/>Call Number MFL 13889<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/>Kesan kenaikan dan penurunan harga keluli terhadap industri pembinaan di Malaysiaent://SD_ILS/0/SD_ILS:4836072024-06-12T05:03:29Z2024-06-12T05:03:29Zby Wan Nor Aishah Meor Hussain<br/>Author Wan Nor Aishah Meor Hussain<br/>Format: Books<br/>Call Number TH438.15 W56 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2006<br/>Value management in construction industryent://SD_ILS/0/SD_ILS:4893022024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ng, Kim Lai<br/>Author Ng, Kim Lai<br/>Format: Books<br/>Call Number HD9715.M32 N44 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/>Korelasi regresi antara hasil parameter ujian pemadatan tanah dan had atterbergent://SD_ILS/0/SD_ILS:70342024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Ruslan Che Ghani<br/>Author Mohd. Ruslan Che Ghani<br/>Format: Visual Materials<br/>Call Number MFL 13402<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/>Simulasi curahan -air larian di kawasan tadahan Sg. Kelantan menggunakan HEC-HMSent://SD_ILS/0/SD_ILS:79812024-06-12T05:03:29Z2024-06-12T05:03:29Zby Azhar Mat Zain<br/>Author Azhar Mat Zain<br/>Format: Visual Materials<br/>Call Number MFL 13504<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/>Perbandingan kesan larutan serakan pada tanah baki terhadap taburan saiz zarah tanahent://SD_ILS/0/SD_ILS:82262024-06-12T05:03:29Z2024-06-12T05:03:29Zby Masyitah Md. Nujid<br/>Author Masyitah Md. Nujid<br/>Format: Visual Materials<br/>Call Number MFL 13380<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/>Pengurusan pembelian dan penghantaran bahan binaan oleh pihak kontraktorent://SD_ILS/0/SD_ILS:83482024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ahmad Tazri Aziz<br/>Author Ahmad Tazri Aziz<br/>Format: Visual Materials<br/>Call Number MFL 13409<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Sains (Bangunan) - Universiti Teknologi Malaysia, 2005<br/>Sistem pemantauan dan penyenggaraan cerunent://SD_ILS/0/SD_ILS:95822024-06-12T05:03:29Z2024-06-12T05:03:29Zby Abdul Aziz Mamat<br/>Author Abdul Aziz Mamat<br/>Format: Visual Materials<br/>Call Number MFL 13716<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/>Anggaran kadar kos yang diperuntukkan dalam program keselamatanent://SD_ILS/0/SD_ILS:6093992024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Mujahid Mohd<br/>Author Mohd. Mujahid Mohd<br/>Format: Computer file<br/>Call Number CP 6328<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam - (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Analisa implikasi arahan perubahan kerja terhadap kos perbezaan antara kaedah tradisional dengan reka dan binaent://SD_ILS/0/SD_ILS:6142372024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ahmad Firdaus Mohamad<br/>Author Ahmad Firdaus Mohamad<br/>Format: Computer file<br/>Call Number CP 7690<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Pengukuran kemajuan kerja melalui kos, kuantiti dan masa : satu perbandinganent://SD_ILS/0/SD_ILS:8109252024-06-12T05:03:29Z2024-06-12T05:03:29Zby Durrah Munierahhanies Azizan<br/>Author Durrah Munierahhanies Azizan, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number CP 033262 ra<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/>Hubungan antara faktor - faktor yang mempengaruhi produktiviti dengan kos projek pembinaanent://SD_ILS/0/SD_ILS:6070642024-06-12T05:03:29Z2024-06-12T05:03:29Zby Norazah Abd. Aziz<br/>Author Norazah Abd. Aziz<br/>Format: Computer file<br/>Call Number CP 5992<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/>Modal kerja kontraktor projek pembinaanent://SD_ILS/0/SD_ILS:6100192024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lai, Woon Fatt<br/>Author Lai, Woon Fatt<br/>Format: Computer file<br/>Call Number CP 6303<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam - Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2005<br/>Cost control in construction project of the siteent://SD_ILS/0/SD_ILS:6102692024-06-12T05:03:29Z2024-06-12T05:03:29Zby Koh, Wee Liang<br/>Author Koh, Wee Liang<br/>Format: Computer file<br/>Call Number CP 6255<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam - (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Unplanned schedule compression methods and the impact on project costent://SD_ILS/0/SD_ILS:6120402024-06-12T05:03:29Z2024-06-12T05:03:29Zby Sea, Ee Nak<br/>Author Sea, Ee Nak<br/>Format: Computer file<br/>Call Number CP 7744<br/>Publisher Universiti Teknologi Malaysia<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/>Hubungan antara faktor - faktor yang mempengaruhi produktiviti dengan kos projek pembinaanent://SD_ILS/0/SD_ILS:4254632024-06-12T05:03:29Z2024-06-12T05:03:29Zby Norazah Abd. Aziz<br/>Author Norazah Abd. Aziz<br/>Format: Books<br/>Call Number TH438.15 N39 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=64228">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/>Modal kerja kontraktor projek pembinaanent://SD_ILS/0/SD_ILS:4211642024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lai, Woon Fatt<br/>Author Lai, Woon Fatt<br/>Format: Books<br/>Call Number TA210 L34 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=66367">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Cost control in construction project of the siteent://SD_ILS/0/SD_ILS:4223502024-06-12T05:03:29Z2024-06-12T05:03:29Zby Koh, Wee Liang<br/>Author Koh, Wee Liang<br/>Format: Books<br/>Call Number TH438.15 K63 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=66053">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam - (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Anggaran kadar kos yang diperuntukkan dalam program keselamatanent://SD_ILS/0/SD_ILS:4274502024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Mujahid Mohd<br/>Author Mohd. Mujahid Mohd<br/>Format: Books<br/>Call Number TH438.15 M58 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam - (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Implikasi kos penyediaan tapak kepada kos projek bagi projek perumahan di Malaysiaent://SD_ILS/0/SD_ILS:4475602024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Lokmal Md. Hussein<br/>Author Mohd. Lokmal Md. Hussein<br/>Format: Books<br/>Call Number TH375 M56 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2005<br/>Masalah -masalah yang mungkin berlaku dalam pelaksanaan teknik kos pusingan Hayat di Malaysiaent://SD_ILS/0/SD_ILS:4475542024-06-12T05:03:29Z2024-06-12T05:03:29Zby Yee, Han June<br/>Author Yee, Han June<br/>Format: Books<br/>Call Number TH435 Y43 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2005<br/>Analisa implikasi arahan perubahan kerja terhadap kos : perbezaan antara kaedah tradisional dengan reka dan binaent://SD_ILS/0/SD_ILS:4576582024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ahmad Firdaus Mohamad<br/>Author Ahmad Firdaus Mohamad<br/>Format: Books<br/>Call Number TH438 A37 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=68510">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Pengukuran kemajuan kerja melalui kos, kuantiti dan masa : satu perbandinganent://SD_ILS/0/SD_ILS:4207652024-06-12T05:03:29Z2024-06-12T05:03:29Zby Durrah Munierahhanies Azizan<br/>Author Durrah Munierahhanies Azizan<br/>Format: Books<br/>Call Number TH438 D87 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/>Kemahiran yang diperlukan oleh seseorang fasilitator pengurusan nilaient://SD_ILS/0/SD_ILS:4509592024-06-12T05:03:29Z2024-06-12T05:03:29Zby Leong, Yuet Lin<br/>Author Leong, Yuet Lin<br/>Format: Books<br/>Call Number TH438 L46 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper ( Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Unplanned schedule compression methods and the impact on project costent://SD_ILS/0/SD_ILS:4514462024-06-12T05:03:29Z2024-06-12T05:03:29Zby Sea, Ee Nak<br/>Author Sea, Ee Nak<br/>Format: Books<br/>Call Number TH438.4 S42 2005<br/>Publisher Universiti Teknologi Malaysia ,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/>Cost control in construction project of the siteent://SD_ILS/0/SD_ILS:79772024-06-12T05:03:29Z2024-06-12T05:03:29Zby Koh, Wee Liang<br/>Author Koh, Wee Liang<br/>Format: Visual Materials<br/>Call Number MFL 13424<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam - (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2005<br/>Modal kerja kontraktor projek pembinaanent://SD_ILS/0/SD_ILS:80392024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lai, Woon Fatt<br/>Author Lai, Woon Fatt<br/>Format: Visual Materials<br/>Call Number MFL 13513<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam - Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2005<br/>Cadangan pembangunan Taman Lagenda Puteri Gunung Ledang Jasin, Melakaent://SD_ILS/0/SD_ILS:85622024-06-12T05:03:29Z2024-06-12T05:03:29Zby Hanita Yusof<br/>Author Hanita Yusof<br/>Format: Visual Materials<br/>Call Number MFL 13406<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Senibina Landskap) - Universiti Teknologi Malaysia, 2005<br/>Pengawasan projek pembinaan dengan menggunakan kaedah earned value : satu kajian kesent://SD_ILS/0/SD_ILS:85982024-06-12T05:03:29Z2024-06-12T05:03:29Zby Annie, Koh<br/>Author Annie, Koh<br/>Format: Visual Materials<br/>Call Number MFL 13574<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Sains (Pembinaan) - Universiti Teknologi Malaysia, 2005<br/>Analisa implikasi arahan perubahan kerja terhadap kos : perbezaan antara kaedah tradisional dengan reka dan binaent://SD_ILS/0/SD_ILS:89902024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ahmad Firdaus Mohamad<br/>Author Ahmad Firdaus Mohamad<br/>Format: Visual Materials<br/>Call Number MFL 13621<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2005<br/>Peranan tanggungjawab dan liabiliti arkitek di bawah borang kontrak PAM 1998 dan pegawai penguasa di bawah borang kontrak JKR 203A satu perbandinganent://SD_ILS/0/SD_ILS:70682024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chan, Catherine Hui Lan<br/>Author Chan, Catherine Hui Lan<br/>Format: Visual Materials<br/>Call Number MFL 12614<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2004<br/>Faktor-faktor yang mempengaruhi kelewatan penyiapan pembinaan projek sekolahent://SD_ILS/0/SD_ILS:71122024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lailatul Akhmar Zainuddin<br/>Author Lailatul Akhmar Zainuddin<br/>Format: Visual Materials<br/>Call Number MFL 12612<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2004<br/>Perbandingan di antara teori fasa-fasa rancangan kerja pengurusan nilai dengan amalannya : kajian kes landasan Kuala Lumpur International Airport (KLIA)ent://SD_ILS/0/SD_ILS:3724402024-06-12T05:03:29Z2024-06-12T05:03:29Zby Nita Azilah Azmi<br/>Author Nita Azilah Azmi<br/>Format: Books<br/>Call Number HD9715.M32 K82 2004<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2004<br/>Information management to integrate cost and schedule for infrastructure projectsent://SD_ILS/0/SD_ILS:6039382024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chung, Keat Wei<br/>Author Chung, Keat Wei<br/>Format: Computer file<br/>Call Number CP 10449<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2004<br/>Cost studies of buildingsent://SD_ILS/0/SD_ILS:4305342024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ashworth, A. (Allan)<br/>Author Ashworth, A. (Allan)<br/>Format: Books<br/>Call Number TH438.15 A85 2004<br/>Edition 4th ed.<br/>Publisher Pearson/Prentice Hall,<br/>Publication Date 2004<br/>ISBN 9780131453227<br/>Information management to integrate cost and schedule for infrastructure projectsent://SD_ILS/0/SD_ILS:3958742024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chung, Keat Wei<br/>Author Chung, Keat Wei<br/>Format: Books<br/>Call Number TH438 C484 2004<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2004<br/>Value management of construction projectsent://SD_ILS/0/SD_ILS:4050992024-06-12T05:03:29Z2024-06-12T05:03:29Zby Kelly, John, 1947 June 4-<br/>Author Kelly, John, 1947 June 4-, Male, Steven, Graham, Drummond<br/>Format: Books<br/>Call Number TH438 K44 2004<br/>Publisher Blackwell Science,<br/>Publication Date 2004<br/>ISBN 9780632051434<br/>Critical factors that influence the success of implementing value management in Malaysian construction industryent://SD_ILS/0/SD_ILS:3595662024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chua, Tee Khoon @ Chua Yong Peng<br/>Author Chua, Tee Khoon @ Chua Yong Peng, Chua, Yong Peng<br/>Format: Books<br/>Call Number TH438 C48 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004 2003<br/>Thesis (Master of Science (Construction Management)) - Universiti Teknologi Malaysia, 2004<br/>Faktor-faktor kritikal kejayaan sesebuah projek pembinaan berdasarkan objektif projek yang berlainanent://SD_ILS/0/SD_ILS:3724542024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lim, Beng Li<br/>Author Lim, Beng Li<br/>Format: Books<br/>Call Number TH438 L554 2004<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2004<br/>The practice of cost segregation analysis : maximizing tax benefits for building acquisitions and constructionent://SD_ILS/0/SD_ILS:2398172024-06-12T05:03:29Z2024-06-12T05:03:29Zby Desrosiers, Bruce A.<br/>Author Desrosiers, Bruce A., DelPico, Wayne J., R.S. Means Company<br/>Format: Books<br/>Call Number KF6495.C6 D47 2004<br/>Publisher RSMeans,<br/>Publication Date 2004<br/>ISBN 9780876297445<br/>Critical factors that influence the success of implementing value management in Malaysian construction industryent://SD_ILS/0/SD_ILS:82202024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chua, Tee Khoon @ Chua Yong Peng<br/>Author Chua, Tee Khoon @ Chua Yong Peng<br/>Format: Visual Materials<br/>Call Number MFL 13442<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2004<br/>Pelaksanaan dan keberkesanan manual prosedur ISO 9002ent://SD_ILS/0/SD_ILS:70502024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohamad Nasarudin Mokhtar<br/>Author Mohamad Nasarudin Mokhtar<br/>Format: Visual Materials<br/>Call Number MFL 12577<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/>Kaedah pemantauan kerja di tapak bina oleh kontraktorent://SD_ILS/0/SD_ILS:70962024-06-12T05:03:29Z2024-06-12T05:03:29Zby Abdul Khalid Yaacob<br/>Author Abdul Khalid Yaacob<br/>Format: Visual Materials<br/>Call Number MFL 12599<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2003<br/>Sistem pengurusan sisa bagi Makmal Kejuruteraan Awam, Universiti Teknologi Malaysiaent://SD_ILS/0/SD_ILS:213752024-06-12T05:03:29Z2024-06-12T05:03:29Zby Leong, Siew Chee<br/>Author Leong, Siew Chee<br/>Format: Visual Materials<br/>Call Number MFL 12347<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/>Kerja asas cerucuk dan garis panduan bagi pembinaan di Tanah Tinggient://SD_ILS/0/SD_ILS:216992024-06-12T05:03:29Z2024-06-12T05:03:29Zby Azman Jaffar<br/>Author Azman Jaffar<br/>Format: Visual Materials<br/>Call Number MFL 12568<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/>Kajian ke atas nisbah kos bahan, buruh, peralatan / jentera untuk kerja jalanrayaent://SD_ILS/0/SD_ILS:3543562024-06-12T05:03:29Z2024-06-12T05:03:29Zby Zamri Shariff<br/>Author Zamri Shariff<br/>Format: Books<br/>Call Number HD9717.5.R6 Z35 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2003<br/>Kajian kos pengurusan dan perancangan keselamatan tapak bina bagi kerja-kerja kejuruteraan awament://SD_ILS/0/SD_ILS:3677762024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Saidin Misnan, 1971-<br/>Author Mohd. Saidin Misnan, 1971-, Wan Yusoff Wan Mahmood, Norizan Mansor<br/>Format: Books<br/>Call Number TH438.15 M72 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Kajian kos kontraktor semasa pembinaanent://SD_ILS/0/SD_ILS:5990472024-06-12T05:03:29Z2024-06-12T05:03:29Zby Zuraidah Mohamad Yasin<br/>Author Zuraidah Mohamad Yasin<br/>Format: Computer file<br/>Call Number CP 3085<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/>Perunding dalam projek pembinaan : kajian penentuan kadar bayaran fi professionalent://SD_ILS/0/SD_ILS:3477922024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohamad Hafiz Hassan<br/>Author Mohamad Hafiz Hassan<br/>Format: Books<br/>Call Number TH159 M42 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/>Kajian kos kontraktor semasa pembinaanent://SD_ILS/0/SD_ILS:3660882024-06-12T05:03:29Z2024-06-12T05:03:29Zby Zuraidah Mohamad Yasin<br/>Author Zuraidah Mohamad Yasin<br/>Format: Books<br/>Call Number TA210 Z87 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=63245">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/>Pemantauan kos projek kajian kes : kompleks rumah alumni Universiti Teknologi Malaysia, Skudai, Johor Darul Takziment://SD_ILS/0/SD_ILS:3464162024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ana Rozaininaida Abd. Rahman<br/>Author Ana Rozaininaida Abd. Rahman<br/>Format: Books<br/>Call Number TH437 A52 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/>Kaedah pemantauan kerja di tapak bina oleh kontraktorent://SD_ILS/0/SD_ILS:3359602024-06-12T05:03:29Z2024-06-12T05:03:29Zby Abdul Khalid Yaacob<br/>Author Abdul Khalid Yaacob<br/>Format: Books<br/>Call Number TH438 A33 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2003<br/>Quantifying and managing disruption claimsent://SD_ILS/0/SD_ILS:3382942024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lal, Hamish<br/>Author Lal, Hamish<br/>Format: Books<br/>Call Number TH437 L344 2002<br/>Publisher Thomas Telford ,<br/>Publication Date 2003<br/>ISBN 9780727731654<br/>Penganggaran kebisingan dari tapak binaent://SD_ILS/0/SD_ILS:210242024-06-12T05:03:29Z2024-06-12T05:03:29Zby Afisah Abdul Aziz<br/>Author Afisah Abdul Aziz<br/>Format: Visual Materials<br/>Call Number MFL 12135<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/>Aturcara perlaksanaan tender di Indonesiaent://SD_ILS/0/SD_ILS:70352024-06-12T05:03:29Z2024-06-12T05:03:29Zby Andewa Dody Suryanto<br/>Author Andewa Dody Suryanto<br/>Format: Visual Materials<br/>Call Number MFL 12358<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Projek Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2002<br/>Kajian kos pembinaan landasan kereta api di Malaysiaent://SD_ILS/0/SD_ILS:70452024-06-12T05:03:29Z2024-06-12T05:03:29Zby Hisham Bakar<br/>Author Hisham Bakar<br/>Format: Visual Materials<br/>Call Number MFL 12360<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2002<br/>Penggunaan Microsoft Project 2000 dalam pengurusan kos projekent://SD_ILS/0/SD_ILS:156102024-06-12T05:03:29Z2024-06-12T05:03:29Zby Izwan Misni<br/>Author Izwan Misni<br/>Format: Visual Materials<br/>Call Number MFL 11524<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Pengawalan kos dalam aspek pengurusan projek pembinaanent://SD_ILS/0/SD_ILS:172282024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chee, Weng Keong<br/>Author Chee, Weng Keong<br/>Format: Visual Materials<br/>Call Number MFL 11495<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Perbandingan antara tembok penahan tanah jenis 'flexsoil' dengan tembok-tembok jenis lainent://SD_ILS/0/SD_ILS:172402024-06-12T05:03:29Z2024-06-12T05:03:29Zby Abdul Halim Samah<br/>Author Abdul Halim Samah<br/>Format: Visual Materials<br/>Call Number MFL 11487<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Kajian keberkesanan bentuk masukan pembentung terhadap ciri aliranent://SD_ILS/0/SD_ILS:208142024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ezrul Azzim Wahid<br/>Author Ezrul Azzim Wahid<br/>Format: Visual Materials<br/>Call Number MFL 12116<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Rock-socketed bored pile, soil retaining system and management of confined siteent://SD_ILS/0/SD_ILS:213622024-06-12T05:03:29Z2024-06-12T05:03:29Zby Amir Khan Suwandi<br/>Author Amir Khan Suwandi<br/>Format: Visual Materials<br/>Call Number MFL 12162<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Thesis (Master of Civil Engineering) - Universiti Teknologi Malaysia, 2002<br/>Penyelenggaraan sistem LRT Putraent://SD_ILS/0/SD_ILS:217242024-06-12T05:03:29Z2024-06-12T05:03:29Zby Azury Kamaruddin<br/>Author Azury Kamaruddin<br/>Format: Visual Materials<br/>Call Number MFL 12359<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Projek Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2002<br/>Pengukuran hasil pembakaran gabungan tempurung dan sabut kelapa sawitent://SD_ILS/0/SD_ILS:218532024-06-12T05:03:29Z2024-06-12T05:03:29Zby Tuan Mohd. Azizi Raja Yusoff<br/>Author Tuan Mohd. Azizi Raja Yusoff<br/>Format: Visual Materials<br/>Call Number MFL 12641<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Project Paper (Sarjana Muda Kejuruteraan (Mekanikal)) - Universiti Teknologi Malaysia, 2002<br/>Pengurusan projek perumahan kos rendah Negeri Melakaent://SD_ILS/0/SD_ILS:3472682024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Azam Tompang<br/>Author Mohd. Azam Tompang<br/>Format: Books<br/>Call Number TH437 M39 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Perancangan dan pengawalan kos dalam sektor pembangunanent://SD_ILS/0/SD_ILS:3070262024-06-12T05:03:29Z2024-06-12T05:03:29Zby Yusni Hamid<br/>Author Yusni Hamid<br/>Format: Books<br/>Call Number TH435 Y87 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Best value in constructionent://SD_ILS/0/SD_ILS:3089392024-06-12T05:03:29Z2024-06-12T05:03:29Zby Kelly, John (John P.)<br/>Author Kelly, John (John P.), Morledge, Roy, Wilkinson, Sara<br/>Format: Books<br/>Call Number TH438 B47 2002<br/>Publisher Blackwell Science,<br/>Publication Date 2002<br/>ISBN 9780632056118<br/>Life cycle costing : multi-storey residential buildingsent://SD_ILS/0/SD_ILS:3156382024-06-12T05:03:29Z2024-06-12T05:03:29Zby Dang Anom Md. Zin<br/>Author Dang Anom Md. Zin, Siti Hamisah Tapsir, 1961-, Zubaidah Ramli, Persidangan Kebangsaan Kejuruteraan Awam (ke-2 : 2002 : Pulau Pinang)<br/>Format: Books<br/>Call Number TH438 D36 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>VEWA : value engineering web-based applicationent://SD_ILS/0/SD_ILS:3287352024-06-12T05:03:29Z2024-06-12T05:03:29Zby Che Wan Fadhil Che Wan Putra<br/>Author Che Wan Fadhil Che Wan Putra, Ho, Boon Kit, International Workshop on Construction Information Technology in Education (2002 : Slovenia)<br/>Format: Books<br/>Call Number TH437 C83 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Value engineering (VE) process modelling for integrating design and constructionent://SD_ILS/0/SD_ILS:3216802024-06-12T05:03:29Z2024-06-12T05:03:29Zby Che Wan Fadhil Che Wan Putra<br/>Author Che Wan Fadhil Che Wan Putra, Ho, Boon Kit, National Conference on Computer Graphics and Multimedia (2002 : Melaka)<br/>Format: Books<br/>Call Number TS168 C92 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Pemantauan kemajuan kerja menggunakan kaedah ukuran kosent://SD_ILS/0/SD_ILS:3255622024-06-12T05:03:29Z2024-06-12T05:03:29Zby Norsadin Samshuddin<br/>Author Norsadin Samshuddin<br/>Format: Books<br/>Call Number TH437 N73 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>The importance of overhead costs among construction industriesent://SD_ILS/0/SD_ILS:3266672024-06-12T05:03:29Z2024-06-12T05:03:29Zby Faidzulaini Muhammad<br/>Author Faidzulaini Muhammad, Che Zuriana Muhammad Jamil<br/>Format: Books<br/>Call Number TH438.15 F34 2002<br/>Publisher School of Accountancy, Universiti Utara Malaysia,<br/>Publication Date 2002<br/>Pengawalan kos dalam aspek pengurusan projek pembinaanent://SD_ILS/0/SD_ILS:3066632024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chee, Weng Keong<br/>Author Chee, Weng Keong<br/>Format: Books<br/>Call Number TH435 C44 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Penggunaan Microsoft Project 2000 dalam pengurusan kos projekent://SD_ILS/0/SD_ILS:3071802024-06-12T05:03:29Z2024-06-12T05:03:29Zby Izwan Misni<br/>Author Izwan Misni<br/>Format: Books<br/>Call Number TH437 I98 2002 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Analisa kos bagi projek sekolah secara reka dan binaent://SD_ILS/0/SD_ILS:3079952024-06-12T05:03:29Z2024-06-12T05:03:29Zby Wahida Abd. Rahman<br/>Author Wahida Abd. Rahman<br/>Format: Books<br/>Call Number TH435 W334 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Tesis (Sarjana Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2002<br/>Life cycle cost analysis on corrosion remedial measures for concrete bridgesent://SD_ILS/0/SD_ILS:159172024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ho, Jin How<br/>Author Ho, Jin How<br/>Format: Visual Materials<br/>Call Number MFL 11890<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Thesis (Master of Engineering (Civil)) - Universiti Teknologi Malaysia, 2002<br/>Analisis dan rekabentuk papak rata dengan bantuan komputerent://SD_ILS/0/SD_ILS:172472024-06-12T05:03:29Z2024-06-12T05:03:29Zby Choy, Kim Loong<br/>Author Choy, Kim Loong<br/>Format: Visual Materials<br/>Call Number MFL 11490<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Kajian terhadap kepuasan pengguna Blok M46-M49 (UTM) dengan menggunakan kaedah QFDent://SD_ILS/0/SD_ILS:205642024-06-12T05:03:29Z2024-06-12T05:03:29Zby Arniza Israwati Sehab<br/>Author Arniza Israwati Sehab<br/>Format: Visual Materials<br/>Call Number MFL 11997<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/>Construction scheduling, cost optimization and management : a new model based on neurocomputing and object technologiesent://SD_ILS/0/SD_ILS:1643712024-06-12T05:03:29Z2024-06-12T05:03:29Zby Adeli, Hojjat<br/>Author Adeli, Hojjat, Karim, Asim<br/>Format: Books<br/>Call Number TH438.4 A33 2001<br/>Publisher Spon Press,<br/>Publication Date 2001<br/>ISBN 9780415244176<br/>Kesan projek terbengkalai terhadap industri pembangunanent://SD_ILS/0/SD_ILS:160802024-06-12T05:03:29Z2024-06-12T05:03:29Zby Gan, Seng Kian<br/>Author Gan, Seng Kian<br/>Format: Visual Materials<br/>Call Number MFL 11019<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Masalah keretakan dan kualiti plaster bagi rumah kos sederhanaent://SD_ILS/0/SD_ILS:165312024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lee, Foong Kheong<br/>Author Lee, Foong Kheong<br/>Format: Visual Materials<br/>Call Number MFL 11046<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Kesan beban seismik ke atas perumahan di Malaysiaent://SD_ILS/0/SD_ILS:170552024-06-12T05:03:29Z2024-06-12T05:03:29Zby Bahiah Baharudin<br/>Author Bahiah Baharudin<br/>Format: Visual Materials<br/>Call Number MFL 10913<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Penyediaan carta kalibrasi ujian tanpa musnah (NDT) untuk konkrit berkekuatan tinggient://SD_ILS/0/SD_ILS:170802024-06-12T05:03:29Z2024-06-12T05:03:29Zby Hazli Husin<br/>Author Hazli Husin<br/>Format: Visual Materials<br/>Call Number MFL 10914<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Pembinaan elektronik (E-Pembinaan) : pengalaman daripada industri-industri lainent://SD_ILS/0/SD_ILS:210482024-06-12T05:03:29Z2024-06-12T05:03:29Zby Aminuddin Ibrahim<br/>Author Aminuddin Ibrahim<br/>Format: Visual Materials<br/>Call Number MFL 11759<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2001<br/>Kejuruteraan nilai di dalam industri pembinaan Malaysiaent://SD_ILS/0/SD_ILS:1625852024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ong, Chin Khen<br/>Author Ong, Chin Khen<br/>Format: Books<br/>Call Number TH437 O54 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Sistem pemantauan kos dan informasi projek pembinaanent://SD_ILS/0/SD_ILS:1627832024-06-12T05:03:29Z2024-06-12T05:03:29Zby Nirmala Rathakrishnan<br/>Author Nirmala Rathakrishnan<br/>Format: Books<br/>Call Number TH437 N58 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Pembiayaan pembangunan projek perumahan : perbandingan perspektif Islam dan konvensionalent://SD_ILS/0/SD_ILS:1630452024-06-12T05:03:29Z2024-06-12T05:03:29Zby Wan Afnizan Wan Mohamed<br/>Author Wan Afnizan Wan Mohamed<br/>Format: Books<br/>Call Number TH4815.8 W33 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Modelling the application of value engineering (VE) in design and constructionent://SD_ILS/0/SD_ILS:2980122024-06-12T05:03:29Z2024-06-12T05:03:29Zby Che Wan Fadhil Che Wan Putra<br/>Author Che Wan Fadhil Che Wan Putra, Ho, Boon Kit, Malaysian Science and Technology Congress (2001 : Melaka)<br/>Format: Books<br/>Call Number TH437 C82 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Penggunaan blok premix untuk penyelenggaraan jalan : analisa kos dan masaent://SD_ILS/0/SD_ILS:3006022024-06-12T05:03:29Z2024-06-12T05:03:29Zby Sharul Nizam Abdul Aziz<br/>Author Sharul Nizam Abdul Aziz<br/>Format: Books<br/>Call Number HD9717.5.R6 S53 2001<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/>Kajian ke atas perkhidmatan pembersihan dalam pelbagai jenis bangunanent://SD_ILS/0/SD_ILS:159052024-06-12T05:03:29Z2024-06-12T05:03:29Zby Angelia Perpetua Melkin Spencer<br/>Author Angelia Perpetua Melkin Spencer<br/>Format: Visual Materials<br/>Call Number MFL 11752<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2001<br/>Penilaian keberkesanan penggunaan perisian komputer "JDE job cost system" di dalam pengawalan kos projek binaanent://SD_ILS/0/SD_ILS:1015902024-06-12T05:03:29Z2024-06-12T05:03:29Zby Zalela Jaafar<br/>Author Zalela Jaafar<br/>Format: Books<br/>Call Number TA210 Z344 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/>Kajian terhadap aplikasi teknik optimasi kos binaan di firma ukur bahan ... [et al.]ent://SD_ILS/0/SD_ILS:139072024-06-12T05:03:29Z2024-06-12T05:03:29Zby Goh, Chong Ming<br/>Author Goh, Chong Ming, Masliana Mis'an, Teow, Leng Boon, Wong, Kok Ching, Yusharima Yusoff<br/>Format: Visual Materials<br/>Call Number MFL 10290<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas Projek (Sarjana Muda Senibina) - Universiti Teknologi Malaysia, 2000<br/>Kesan pemilihan kaedah pembinaan ke atas tempoh siap dan kos projekent://SD_ILS/0/SD_ILS:164132024-06-12T05:03:29Z2024-06-12T05:03:29Zby Adlan Rafhan Burahan<br/>Author Adlan Rafhan Burahan<br/>Format: Visual Materials<br/>Call Number MFL 10400<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/>Dinding blok "autoclaved lightweight concrete" untuk projek perumahanent://SD_ILS/0/SD_ILS:164852024-06-12T05:03:29Z2024-06-12T05:03:29Zby Awang Muhamad Jambol<br/>Author Awang Muhamad Jambol<br/>Format: Visual Materials<br/>Call Number MFL 10282<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Projek Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/>Kajian potensi bahanapi yang sedia ada bagi kegunaan enjin dieselent://SD_ILS/0/SD_ILS:170752024-06-12T05:03:29Z2024-06-12T05:03:29Zby Syahrul Manap<br/>Author Syahrul Manap<br/>Format: Visual Materials<br/>Call Number MFL 10559<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Project Paper (Sarjana Muda Kejuruteraan Mekanikal) - Universiti Teknologi Malaysia, 2000<br/>Pengubahsuaian, pencirian dan penggunaan zeolit asli sebagai bahan penjerap terhadap bahan pencelup sintetik besent://SD_ILS/0/SD_ILS:186222024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chai, Mee Kin<br/>Author Chai, Mee Kin<br/>Format: Visual Materials<br/>Call Number MFL 12155<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Tesis (Sarjana Sains (Kimia)) - Universiti Teknologi Malaysia, 2000<br/>Kawalan kos semasa pembinaan : kajian kesent://SD_ILS/0/SD_ILS:1561892024-06-12T05:03:29Z2024-06-12T05:03:29Zby Yee, Chee Sam<br/>Author Yee, Chee Sam<br/>Format: Books<br/>Call Number TH437 Y43 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/>Kaedah penyediaan kadarharga yang dilaksanakan di dalam industri pembinaan di Malaysiaent://SD_ILS/0/SD_ILS:1654782024-06-12T05:03:29Z2024-06-12T05:03:29Zby Maimunah Mansor<br/>Author Maimunah Mansor<br/>Format: Books<br/>Call Number HD9715.M3 M35 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/>Kesan pemilihan kaedah pembinaan ke atas tempoh siap dan kos projekent://SD_ILS/0/SD_ILS:1458532024-06-12T05:03:29Z2024-06-12T05:03:29Zby Norazizi Mukhibat<br/>Author Norazizi Mukhibat<br/>Format: Books<br/>Call Number TA183 N67 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/>Sistem pengurusan projek pembinaan di Jabatan Kerja Raya Daerah Johor Bahruent://SD_ILS/0/SD_ILS:1487462024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Noorlizam Mohd. Monzai<br/>Author Mohd. Noorlizam Mohd. Monzai<br/>Format: Books<br/>Call Number HD69.P75 M666 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas projek (Sarjana Muda Sains Komputer) - Universiti Teknologi Malaysia, 2000<br/>Reviewing the project delivery systems used in Malaysia Construction Industry : focus on the conventional method and the design and build methodent://SD_ILS/0/SD_ILS:1491832024-06-12T05:03:29Z2024-06-12T05:03:29Zby Tee, Beng Hock<br/>Author Tee, Beng Hock<br/>Format: Books<br/>Call Number TH113.M3 T43 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Thesis (Master of Science (Construction Management)) - Universiti Teknologi Malaysia, 2000<br/>Kajian ke atas kontraktor binaan di dalam memenuhi keperluan pemaju untuk projek kompleks perniagaanent://SD_ILS/0/SD_ILS:1312122024-06-12T05:03:29Z2024-06-12T05:03:29Zby Lau, Lai Siong<br/>Author Lau, Lai Siong<br/>Format: Books<br/>Call Number TH4311 L38 2000 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas Projek (Sarjana Muda Senibina) - Universiti Teknologi Malaysia, 2000<br/>Perbandingan penggunaan "metal formwork system" dengan sistem acuan kayu : satu kajian kesent://SD_ILS/0/SD_ILS:1312962024-06-12T05:03:29Z2024-06-12T05:03:29Zby Wong, Kok Ching<br/>Author Wong, Kok Ching<br/>Format: Books<br/>Call Number TA682.44 W66 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas Projek (Sarjana Muda Senibina) - Universiti Teknologi Malaysia, 2000<br/>Kesan pemilihan kaedah pembinaan ke atas tempoh siap dan kos projekent://SD_ILS/0/SD_ILS:1443222024-06-12T05:03:29Z2024-06-12T05:03:29Zby Adlan Rafhan Burahan<br/>Author Adlan Rafhan Burahan<br/>Format: Books<br/>Call Number TH438 A34 2000 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/>The role of cost saving and innovation in PFI projectsent://SD_ILS/0/SD_ILS:3132052024-06-12T05:03:29Z2024-06-12T05:03:29Zby Construction Industry Council (Great Britain)<br/>Author Construction Industry Council (Great Britain)<br/>Format: Books<br/>Call Number TH438 R64 2000<br/>Publisher Thomas Telford,<br/>Publication Date 2000<br/>ISBN 9780727728791<br/>Kajian terhadap aplikasi teknik optimasi kos binaan di firma ukur bahanent://SD_ILS/0/SD_ILS:1311862024-06-12T05:03:29Z2024-06-12T05:03:29Zby Goh, Chong Ming<br/>Author Goh, Chong Ming<br/>Format: Books<br/>Call Number TH438 G63 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas Projek (Sarjana Muda Senibina) - Universiti Teknologi Malaysia, 2000<br/>Best practices for multi-project management in the construction industryent://SD_ILS/0/SD_ILS:1413542024-06-12T05:03:29Z2024-06-12T05:03:29Zby Aminatuzuhariah Megat Abdullah<br/>Author Aminatuzuhariah Megat Abdullah<br/>Format: Books<br/>Call Number TH438 A44 2000<br/>Publisher University of Manchester Institute of Science and Technology,<br/>Publication Date 2000<br/>Thesis (PhD) - University of Manchester Institute of Science and Technology, 2000<br/>Sistem pengurusan projek pembinaan di Jabatan Kerja Raya Daerah Johor Bahru ... [et al.]ent://SD_ILS/0/SD_ILS:139382024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Noorlizam Mohd. Monzai<br/>Author Mohd. Noorlizam Mohd. Monzai<br/>Format: Visual Materials<br/>Call Number MFL 10624<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas Projek (Sarjana Muda Sains Komputer) - Universiti Teknologi Malaysia, 2000<br/>Implikasi kaedah pemberian kontrak bagi projek pembaikan dan penyenggaraan sekolah-sekolah di Sarawakent://SD_ILS/0/SD_ILS:168032024-06-12T05:03:29Z2024-06-12T05:03:29Zby Affindi Jahari<br/>Author Affindi Jahari<br/>Format: Visual Materials<br/>Call Number MFL 10280<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Project Paper (Sarjana Muda Senibina) - Universiti Teknologi Malaysia, 2000<br/>Best practices for multi-project management in the construction industryent://SD_ILS/0/SD_ILS:173062024-06-12T05:03:29Z2024-06-12T05:03:29Zby Aminatuzuhariah Megat Abdullah<br/>Author Aminatuzuhariah Megat Abdullah<br/>Format: Visual Materials<br/>Call Number MFL 11328<br/>Publisher University of Manchester Institute of Science and Technology,<br/>Publication Date 2000<br/>Thesis (Ph.D.) - University of Manchester Institute of Science and Technology, 2000<br/>Penyediaan senarai kuantiti bagi kerja paip airent://SD_ILS/0/SD_ILS:204192024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ahmad Ismail<br/>Author Ahmad Ismail<br/>Format: Visual Materials<br/>Call Number MFL 11754<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/>Merekabentuk penguji kestabilan bangunan tinggi pada keadaan persekitaranent://SD_ILS/0/SD_ILS:204942024-06-12T05:03:29Z2024-06-12T05:03:29Zby Azihan Ismail<br/>Author Azihan Ismail<br/>Format: Visual Materials<br/>Call Number MFL 10555<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Project Paper (Sarjana Muda Kejuruteraan Mekanikal (Aeronautik)) - Universiti Teknologi Malaysia, 2000<br/>Pembangunan perisian analisis dan rekabentuk menara simpanan air menggunakan visual basicent://SD_ILS/0/SD_ILS:210112024-06-12T05:03:29Z2024-06-12T05:03:29Zby Hong, Chin Yee<br/>Author Hong, Chin Yee<br/>Format: Visual Materials<br/>Call Number MFL 12131<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/>Generation of velocity profile of solid particle conveying in pneumatic conveyor using optical sensor via cross correlation techniqueent://SD_ILS/0/SD_ILS:210442024-06-12T05:03:29Z2024-06-12T05:03:29Zby Herlina Abdul Rahim, 1973-<br/>Author Herlina Abdul Rahim, 1973-<br/>Format: Visual Materials<br/>Call Number MFL 12051<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Thesis (Sarjana Kejuruteraan (Elektrik)) - Universiti Teknologi Malaysia, 2000<br/>Tawaran secara rundingan : kesan masa dan kos projek berbanding tawaran secara terbukaent://SD_ILS/0/SD_ILS:1071722024-06-12T05:03:29Z2024-06-12T05:03:29Zby Nazli Mohamad<br/>Author Nazli Mohamad<br/>Format: Books<br/>Call Number HD9715.A2 N394 2000<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2000<br/>Peranan pengurusan projek dalam menangani masalah pengawalan masa dan kos dalam sektor pembinaanent://SD_ILS/0/SD_ILS:980532024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Hazri Moh Khambali<br/>Author Mohd. Hazri Moh Khambali<br/>Format: Books<br/>Call Number TH438 M63 1999 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas projek (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 1999<br/>Perbezaan anggaran kos awal dengan kos pembinaan muktamad bagi projek sekolah ... [et al.]ent://SD_ILS/0/SD_ILS:130762024-06-12T05:03:29Z2024-06-12T05:03:29Zby Haliza Ishak<br/>Author Haliza Ishak, Jamaliah Salbi, Salmawati Mansor, Saw, Leng Aik, Sharina Farihah Hasan<br/>Format: Visual Materials<br/>Call Number MFL 9373<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas Projek (Sarjana Muda Bangunan) - Universiti Teknologi Malaysia, 1999<br/>Mempertingkat sistem bekalan air di daerah Kluang, Johorent://SD_ILS/0/SD_ILS:164342024-06-12T05:03:29Z2024-06-12T05:03:29Zby Hamran Tukiman<br/>Author Hamran Tukiman<br/>Format: Visual Materials<br/>Call Number MFL 10806<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/>Kriteria bangunan bestari ... [et al.]ent://SD_ILS/0/SD_ILS:1636162024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Kamari Hashim<br/>Author Mohd. Kamari Hashim, Mohd. Nasroon Ab. Aziz, Mohd. Teguh Suria Mohd. Nordin, Nooryuzila Yusop, Nor Azian Hashim<br/>Format: Books<br/>Call Number MFL 9372 ra<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas Projek (Sarjana Muda Bangunan) - Universiti Teknologi Malaysia, 1999<br/>Peningkatan kos keatas projek pembinaan jalan di kawasan Sumatera Barat, Indonesiaent://SD_ILS/0/SD_ILS:1483782024-06-12T05:03:29Z2024-06-12T05:03:29Zby Radam<br/>Author Radam<br/>Format: Books<br/>Call Number HD9715.I48 R33 1999 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Tesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 1999<br/>Pemantauan air bumi di Pulau Tiomanent://SD_ILS/0/SD_ILS:1187842024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ahmad Nadzri Abdul Majid<br/>Author Ahmad Nadzri Abdul Majid<br/>Format: Books<br/>Call Number TD313.M3 A46 1999 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/>Pengurusan kualiti dalam pembinaanent://SD_ILS/0/SD_ILS:1315892024-06-12T05:03:29Z2024-06-12T05:03:29Zby Hanizan Md. Ishak<br/>Author Hanizan Md. Ishak<br/>Format: Books<br/>Call Number TA153 H36 1999<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/>The challenges and potential of value management in local construction industryent://SD_ILS/0/SD_ILS:5888572024-06-12T05:03:29Z2024-06-12T05:03:29Zby Mohd. Mazlan Che Mat<br/>Author Mohd. Mazlan Che Mat<br/>Format: Computer file<br/>Publication Date 1999<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=19686">Full text</a><br/>Cost of chaosent://SD_ILS/0/SD_ILS:3985082024-06-12T05:03:29Z2024-06-12T05:03:29ZFormat: Books<br/>Call Number FLM 1530.01<br/>Publisher M & M Audio Visual,<br/>Publication Date 1999 1998 1997 1996 1995<br/>Rangkaian kawalan lalu lintas (ATC) berkomputer dalam pengurusan kejuruteraan lalu lintas ... [et al.]ent://SD_ILS/0/SD_ILS:86172024-06-12T05:03:29Z2024-06-12T05:03:29Zby Juliana Abd. Jalil<br/>Author Juliana Abd. Jalil, Amran Hamzah, Mohd. Hazri Moh Khambali, Mohd. Izuha Mohamed, Chong, Lip Hien<br/>Format: Visual Materials<br/>Call Number MFL 9450<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/>Cost of chaosent://SD_ILS/0/SD_ILS:98562024-06-12T05:03:29Z2024-06-12T05:03:29ZFormat: Visual Materials<br/>Call Number KVD 717.01<br/>Publisher M & M Audio Visual,<br/>Publication Date 1999 1998 1997 1996 1995<br/>Kajian terhadap kos membaikpulih kecacatan bangunan perumahan ... [et al. ]ent://SD_ILS/0/SD_ILS:131252024-06-12T05:03:29Z2024-06-12T05:03:29Zby Maslipah Idris<br/>Author Maslipah Idris, Mohamed Nizam Yusof, Rozaimah Mohd Jidin, Roziha Che Haron, Rozilah Talib<br/>Format: Visual Materials<br/>Call Number MFL 9358 ra<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1999<br/>Keberkesanan rekabentuk dan teknik pembinaan terhadap kos pembinaan ... [et al.]ent://SD_ILS/0/SD_ILS:131302024-06-12T05:03:29Z2024-06-12T05:03:29Zby Jayaselvi R. Periasamy<br/>Author Jayaselvi R. Periasamy, Lee, Wei Koon, Norlida Mamad @ Samad, Nurulhuda Azizan<br/>Format: Visual Materials<br/>Call Number MFL 9306<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas projek (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 1999<br/>Kajian potensi penggunaan 'Aerated Concrete Panel' tempatan untuk projek perumahan kos rendah ... [et al.]ent://SD_ILS/0/SD_ILS:134072024-06-12T05:03:29Z2024-06-12T05:03:29Zby Azhar Ab. Aziz<br/>Author Azhar Ab. Aziz, Hafizah Md. Halid, Ningkan Sampek, Noor Azlila Amir Sutan, Nornirahayu Tahir<br/>Format: Visual Materials<br/>Call Number MFL 9356<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1999<br/>Peranan juruukur bahan dalam pelaksanaan projek binaan di Indonesia ... [et al.]ent://SD_ILS/0/SD_ILS:136572024-06-12T05:03:29Z2024-06-12T05:03:29Zby Martalius Peli<br/>Author Martalius Peli, M. Taufik Malano, Putri Lynna A. Luthan, Radam, Zulfiatno<br/>Format: Visual Materials<br/>Call Number MFL 10489<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Tesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 1999<br/>Proses-proses pembinaan dan anggaran kos menara tangki airent://SD_ILS/0/SD_ILS:163352024-06-12T05:03:29Z2024-06-12T05:03:29Zby Adnan Abd. Ghani<br/>Author Adnan Abd. Ghani<br/>Format: Visual Materials<br/>Call Number MFL 10204<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/>Penyediaan manual gulung-gulung dengan menggunakan keratan saluran bebibirent://SD_ILS/0/SD_ILS:171292024-06-12T05:03:29Z2024-06-12T05:03:29Zby Chin, Chee Moon<br/>Author Chin, Chee Moon<br/>Format: Visual Materials<br/>Call Number MFL 11036<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/>Pengurusan firma kontraktor binaan di dalam kegawatan ekonomient://SD_ILS/0/SD_ILS:1085952024-06-12T05:03:29Z2024-06-12T05:03:29Zby Nor Azian Hashim<br/>Author Nor Azian Hashim<br/>Format: Books<br/>Call Number HD9715.M3 N67 1999 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas Projek (Sarjana Muda Bangunan) - Universiti Teknologi Malaysia, 1999<br/>Perbezaan anggaran kos awal dengan kos pembinaan muktamad bagi projek sekolahent://SD_ILS/0/SD_ILS:1087112024-06-12T05:03:29Z2024-06-12T05:03:29Zby Haliza Ishak<br/>Author Haliza Ishak<br/>Format: Books<br/>Call Number LB3222 H34 1999 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1999<br/>Kajian keatas kelewatan pembayaran kemajuanent://SD_ILS/0/SD_ILS:971292024-06-12T05:03:29Z2024-06-12T05:03:29Zby Abd. Latif Ismail<br/>Author Abd. Latif Ismail<br/>Format: Books<br/>Call Number HD9715.M3 A22 1998 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1998<br/>Pembaziran bahan binaan untuk pembinaan jambatan : kes kajian : lintasan kedua Malaysia - Singapura ... [et al.]ent://SD_ILS/0/SD_ILS:130702024-06-12T05:03:29Z2024-06-12T05:03:29Zby Kang, Cheng Lai<br/>Author Kang, Cheng Lai, Md. Nizam Mutalip, Normila Ahmad, Rahim Abdul Rahman<br/>Format: Visual Materials<br/>Call Number MFL 9192<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Bangunan) - Universiti Teknologi Malaysia, 1998<br/>Kajian kualiti keselamatan struktur sementara di tapak bina ... [et al.]ent://SD_ILS/0/SD_ILS:130782024-06-12T05:03:29Z2024-06-12T05:03:29Zby Ahmad Dzia'uddin Mohamed, 1972-<br/>Author Ahmad Dzia'uddin Mohamed, 1972-, Nor Irwan Nordin, Norman Effendy Md. Mastur, Salina Che Ali, Wahida Abd. Rahman<br/>Format: Visual Materials<br/>Call Number MFL 9204<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1998<br/>Kajian terhadap kesesuaian graduan lepasan ijazah ukur bahan dari universiti tempatan dengan kehendak majikan firma ukur bahan ... [et al.]ent://SD_ILS/0/SD_ILS:130852024-06-12T05:03:29Z2024-06-12T05:03:29Zby Kartina Alaudin<br/>Author Kartina Alaudin, Khairil Nisaak Osman, Rafidah Mokhtar, Wong, Wei Yin, Yee, Chin Moi<br/>Format: Visual Materials<br/>Call Number MFL 9188<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1998<br/>Kajian ekonomi sistem penyejukan wilayah dengan kuasa haba storan ... [et al.]ent://SD_ILS/0/SD_ILS:131182024-06-12T05:03:29Z2024-06-12T05:03:29Zby Kasivishvanathan Muniandy<br/>Author Kasivishvanathan Muniandy, Normah Ali, Roziah Bujang, Wan Abd. Aziz Wan Muda, Zabidi Hashim<br/>Format: Visual Materials<br/>Call Number MFL 9314 ra<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1998<br/>Mengurus pengawalan kos projekent://SD_ILS/0/SD_ILS:1315252024-06-12T05:03:29Z2024-06-12T05:03:29Zby Faridah Khamis<br/>Author Faridah Khamis<br/>Format: Books<br/>Call Number TH438 F38 1998<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/>Pembaziran bahan binaan untuk pembinaan jambatan : kes kajian : Lintasan Kedua Malaysia - Singapuraent://SD_ILS/0/SD_ILS:4742122024-06-12T05:03:29Z2024-06-12T05:03:29Zby Kang, Cheng Lai<br/>Author Kang, Cheng Lai<br/>Format: Books<br/>Call Number HD9715.M3 K36 1998 raf<br/>Publisher UTM,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Bangunan) - Universiti Teknologi Malaysia, 1998<br/>Kajian mengenai penggunaan kaedah perolehan kontrak pengurusan (management contracting) di industri binaan Malaysiaent://SD_ILS/0/SD_ILS:4734592024-06-12T05:03:29Z2024-06-12T05:03:29Zby Yee, Chin Moi<br/>Author Yee, Chin Moi<br/>Format: Books<br/>Call Number TH425 Y43 1998 raf<br/>Publisher UTM,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1998<br/>Kajian terhadap implikasi lokasi projek pembinaan di kawasan bandar ke atas kos dan masa penyiapanent://SD_ILS/0/SD_ILS:4739512024-06-12T05:03:29Z2024-06-12T05:03:29Zby Normila Ahmad<br/>Author Normila Ahmad<br/>Format: Books<br/>Call Number TH435 N67 1998 raf<br/>Publisher UTM,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Bangunan) - Universiti Teknologi Malaysia, 1998<br/>Anggaran tuntutan kerugian dan perbelanjaan (loss and expenses) pihak kontraktor (tuntutan disebabkan oleh lanjutan tarikh penyiapan projek) ... [et al.]ent://SD_ILS/0/SD_ILS:3077592024-06-12T05:03:29Z2024-06-12T05:03:29Zby Abdul Halim Othman<br/>Author Abdul Halim Othman, Khairusy Syakirin Has-Yun Hashim, Shamala Ramasamy, Zainurin Zainul, Zaniroh Mat Saad @ Jaafar<br/>Format: Books<br/>Call Number MFL 9186<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 1998<br/>