Search Results for Construction industry -- Management - Narrowed by: Closed Access ThesisSirsiDynix Enterprisehttp://portal.utm.my/client/en_AU/main/main/qu$003dConstruction$002bindustry$002b--$002bManagement$0026qf$003dITYPE$002509Material$002bType$0025091$00253ACLS_THESIS$002509Closed$002bAccess$002bThesis$0026ps$003d300$0026isd$003dtrue?dt=list2024-05-24T10:49:41ZDispute management in construction industryent://SD_ILS/0/SD_ILS:3620542024-05-24T10:49:41Z2024-05-24T10:49:41Zby Chai, Chang Sa'ar<br/>Author Chai, Chang Sa'ar, Aminah Md Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH425 C434 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan))- Universiti Teknologi Malaysia, 2009<br/>Value management in construction industryent://SD_ILS/0/SD_ILS:4893022024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ng, Kim Lai<br/>Author Ng, Kim Lai<br/>Format: Books<br/>Call Number HD9715.M32 N44 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/>Pre-talent management for construction industryent://SD_ILS/0/SD_ILS:4471322024-05-24T10:49:41Z2024-05-24T10:49:41Zby Sharifah Rahimatul-Hana Syed Ali<br/>Author Sharifah Rahimatul-Hana Syed Ali<br/>Format: Books<br/>Call Number HD9715.A2 S62 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=38407">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Application of interface management in construction industryent://SD_ILS/0/SD_ILS:8216202024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Rozlan Misnun, 1988- author<br/>Author Mohd. Rozlan Misnun, 1988- author, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH215 M76 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Adopting lean management in Nigerian construction industryent://SD_ILS/0/SD_ILS:8198352024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ibrahim Hussein Adebayo, 1985-<br/>Author Ibrahim Hussein Adebayo, 1985-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 I27 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Electronic document management system in construction industryent://SD_ILS/0/SD_ILS:1552412024-05-24T10:49:41Z2024-05-24T10:49:41Zby Norul Izzati M. Ashaari<br/>Author Norul Izzati M. Ashaari, Arham Abdullah, supervisor<br/>Format: Books<br/>Call Number T58.6 N678 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Fakulti Kejuruteraan Awam, Universiti Teknologi Malaysia, 2007<br/>Critical top management supports that influencing the project success in construction industryent://SD_ILS/0/SD_ILS:8862882024-05-24T10:49:41Z2024-05-24T10:49:41Zby Muhammad Hafizi Danial, 1985-, author<br/>Author Muhammad Hafizi Danial, 1985-, author, Mohd. Saidin Misnan, 1971-, supervisor, Fakulti Kejuruteraan. Sekolah Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(886288.2)<br/>Publication Date 2020<br/>Thesis (Sarjana Pengurusan Projek) - Universiti Teknologi Malaysia, 2020<br/>Organizational talent management initiatives and practices in construction industryent://SD_ILS/0/SD_ILS:8862612024-05-24T10:49:41Z2024-05-24T10:49:41Zby Hasliana Kusni @ Sulikan, 1976-, author<br/>Author Hasliana Kusni @ Sulikan, 1976-, author, Abdul Rahim Abdul Hamid, supervisor, Fakulti Kejuruteraan-Sekolah Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(886261.1)<br/>Publication Date 2019<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2019<br/>Roadmap for implementing value management in the Nigerian construction industryent://SD_ILS/0/SD_ILS:8819062024-05-24T10:49:41Z2024-05-24T10:49:41Zby Bruno Lot Tanko, 1982-, author<br/>Author Bruno Lot Tanko, 1982-, author, Fadhlin Abdullah, supervisor, Zuhaili Mohamad Ramly, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number TS168 B78 2018 raf<br/>Publication Date 2018<br/>Thesis (Doktor Falsafah) - Universiti Teknologi Malaysia, 2018<br/>Relationship between work hours and management supports towards work-life balance: a study in construction industryent://SD_ILS/0/SD_ILS:8698662024-05-24T10:49:41Z2024-05-24T10:49:41Zby Syarifah Rabiyah Al Adawiah Syed Badrul Hisham, 1989- , author<br/>Author Syarifah Rabiyah Al Adawiah Syed Badrul Hisham, 1989- , author, Ebi Shahrin Sulaiman, supervisor, Khairiah Soehod, author, Fakulti Pengurusan<br/>Format: Books<br/>Call Number XX(869866.1)<br/>Publication Date 2017<br/>Thesis (Sarjana Pengurusan (Teknologi)) - Universiti Teknologi Malaysia, 2017<br/>Enterprise risk management maturity and firm financial performance with moderating effect of firm specific measures in Iranian Construction Industryent://SD_ILS/0/SD_ILS:8636642024-05-24T10:49:41Z2024-05-24T10:49:41Zby Sanambar Tavakoli, author<br/>Author Sanambar Tavakoli, author, Noraini Abu Talib, supervisor, Naser, Khani, 1978-, supervisor, Fakulti Pengurusan<br/>Format: Books<br/>Call Number XX(863664.2)<br/>Publication Date 2016<br/>Thesis (Ph.D (Pengurusan)) - Universiti Teknologi Malaysia, 2016<br/>Barriers to adoption of ISO 14001 environmental management system by the Nigerian construction industryent://SD_ILS/0/SD_ILS:8427362024-05-24T10:49:41Z2024-05-24T10:49:41Zby Daddy, Zemnan Titus William, 1961-, author<br/>Author Daddy, Zemnan Titus William, 1961-, author, Khairulzan Yahya, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number GE300 Z46 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana Sains (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>Performance management of value management implementation in the Malaysian construction industryent://SD_ILS/0/SD_ILS:8504282024-05-24T10:49:41Z2024-05-24T10:49:41Zby Zuhaily Mohamad Ramly<br/>Author Zuhaily Mohamad Ramly, The Hong Kong Polytechnic University. Department of Building and Real Estate<br/>Format: Books<br/>Call Number XX(850428.1)<br/>Publication Date 2015<br/>Thesis (Ph.D) - The Hong Kong Polytechnic University, 2015<br/>Effect of handling time to supply chain management in construction industryent://SD_ILS/0/SD_ILS:8328932024-05-24T10:49:41Z2024-05-24T10:49:41Zby Eyman A. Omran Mohamed, 1978- author<br/>Author Eyman A. Omran Mohamed, 1978- author, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438.4 E96 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Examining risk behavior and risk management practices in oil and gas construction industryent://SD_ILS/0/SD_ILS:8475222024-05-24T10:49:41Z2024-05-24T10:49:41Zby Azira Ahmad, 1976- author<br/>Author Azira Ahmad, 1976- author, Mohd. Shoki Md. Ariff, supervisor, Fakulti Pengurusan<br/>Format: Books<br/>Call Number HD61 A95 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Pengurusan (Teknologi)) - Universiti Teknologi Malaysia, 2014<br/>Assessment of value management by using earn value technique in construction industryent://SD_ILS/0/SD_ILS:8011742024-05-24T10:49:41Z2024-05-24T10:49:41Zby Saman Mostafapour, 1984-<br/>Author Saman Mostafapour, 1984-, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 S266 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Ergonomics management for the control of sprains and strains in construction industryent://SD_ILS/0/SD_ILS:8011042024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurul Aini Osman, 1984-<br/>Author Nurul Aini Osman, 1984-, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD5718.B9 N87 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Key performance indicators for value management implementation in construction industryent://SD_ILS/0/SD_ILS:8199642024-05-24T10:49:41Z2024-05-24T10:49:41Zby Muhammad Adam Abd. Kadir, 1986-, author<br/>Author Muhammad Adam Abd. Kadir, 1986-, author, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 M843 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>A study on ICT adoption for materials management among contractors in construction industryent://SD_ILS/0/SD_ILS:7935992024-05-24T10:49:41Z2024-05-24T10:49:41Zby Chai, Sheng Jane, 1990-<br/>Author Chai, Sheng Jane, 1990-, Fara Diva Mustapa, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TS161 C43 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Performance measurement of value management (VM) for the Malaysian construction industryent://SD_ILS/0/SD_ILS:7758242024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohsen Torabi, 1985-<br/>Author Mohsen Torabi, 1985-, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 M647 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Construction project management practice in the Sudanese construction industryent://SD_ILS/0/SD_ILS:7758432024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mario Makarious Ratib, 1986-<br/>Author Mario Makarious Ratib, 1986-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 M3744 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>The effects of ISO 9000 quality management systems on project management performance in construction industryent://SD_ILS/0/SD_ILS:7762662024-05-24T10:49:41Z2024-05-24T10:49:41Zby Zahidy Abd. Hamid, 1962-<br/>Author Zahidy Abd. Hamid, 1962-, Sabariyah Din, supervisor, Muhd. Zaimi Abd. Majid, supervisor, Sekolah Razak UTM Dalam Kejuruteraan dan Teknologi Termaju<br/>Format: Books<br/>Call Number HD69.P75 Z34 2011 raf<br/>Publication Date 2011<br/>Thesis (Ph.D (Pengurusan Perniagaan Kejuruteraan)) - Universiti Teknologi Malaysia, 2011<br/>Project management consultant (PMC) in Sudanese construction industryent://SD_ILS/0/SD_ILS:7585812024-05-24T10:49:41Z2024-05-24T10:49:41Zby Abdeliazim Mustafa Mohamed Ahmed, 1980-<br/>Author Abdeliazim Mustafa Mohamed Ahmed, 1980-, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 A237 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Mobile application prototype for on-site information management in construction industryent://SD_ILS/0/SD_ILS:7294562024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mehdi Nourbakhsh, 1983-<br/>Author Mehdi Nourbakhsh, 1983-, Rosli Mohamad Zin, supervisor, Javier Irizarry, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 M444 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Practices and challenges of supply chain management among construction project in Malaysian construction industryent://SD_ILS/0/SD_ILS:7306882024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nur Bahariyah Khairuddin, 1985-, author<br/>Author Nur Bahariyah Khairuddin, 1985-, author, Roslan Amirudin, supervisor, Razali Abdul Hamid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 N884 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/>Risk management implementation in the iranian construction industry from contractors' perspectiveent://SD_ILS/0/SD_ILS:3922802024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mostafa Ghadak Zadeh, 1984-<br/>Author Mostafa Ghadak Zadeh, 1984-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 M67 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>The integration of quality management system in construction industryent://SD_ILS/0/SD_ILS:3882882024-05-24T10:49:41Z2024-05-24T10:49:41Zby Lydia Nyomek, 1983-<br/>Author Lydia Nyomek, 1983-, Mohammad Ibrahim Mohammad, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 L93 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Simulation of supply chain management for construction industryent://SD_ILS/0/SD_ILS:3230902024-05-24T10:49:41Z2024-05-24T10:49:41Zby Alaa A. A. Elkaseh<br/>Author Alaa A. A. Elkaseh, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD38.5 A424 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan )) - Universiti Teknologi Malaysia, 2009<br/>Best practices in safety management for conventional civil construction industry in Malaysiaent://SD_ILS/0/SD_ILS:2264222024-05-24T10:49:41Z2024-05-24T10:49:41Zby Rosli Ahmad<br/>Author Rosli Ahmad, Abdul Rahim Abdul Hamid, supervisor<br/>Format: Books<br/>Call Number TH443 R68 2008<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Accident prevention through management approach in construction industryent://SD_ILS/0/SD_ILS:2265332024-05-24T10:49:41Z2024-05-24T10:49:41Zby Wardah Ajmal Tumin<br/>Author Wardah Ajmal Tumin<br/>Format: Books<br/>Call Number TH443 W37 2008<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Emergent trend in Malaysian construction industry : the rise of facility managementent://SD_ILS/0/SD_ILS:1498462024-05-24T10:49:41Z2024-05-24T10:49:41Zby Cik Norazlina Mohd. Kamin<br/>Author Cik Norazlina Mohd. Kamin<br/>Format: Books<br/>Call Number TS177 C66 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=51468">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Developing a construction industry web-based learning system in construction management educationent://SD_ILS/0/SD_ILS:1102082024-05-24T10:49:41Z2024-05-24T10:49:41Zby Toh, Tien Choon<br/>Author Toh, Tien Choon<br/>Format: Books<br/>Call Number TH438 T635 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=44813">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2006<br/>The evaluation of site quality management system in construction industryent://SD_ILS/0/SD_ILS:4103222024-05-24T10:49:41Z2024-05-24T10:49:41Zby Azmi Yusoff<br/>Author Azmi Yusoff<br/>Format: Books<br/>Call Number TH438 A96 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Document management system in construction industry : MS ISO 9001 (Requisition and Receiving Materials)ent://SD_ILS/0/SD_ILS:4252042024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Khairulhazwan Zulhaimi<br/>Author Mohd. Khairulhazwan Zulhaimi<br/>Format: Books<br/>Call Number T58.6 M53 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/>Services provided by project management consultant in Malaysiaan construction industryent://SD_ILS/0/SD_ILS:4487622024-05-24T10:49:41Z2024-05-24T10:49:41Zby Dzulkarnaen Ismail<br/>Author Dzulkarnaen Ismail<br/>Format: Books<br/>Call Number HD69.P75 D98 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=38174">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/>Critical factors that influence the success of implementing value management in Malaysian construction industryent://SD_ILS/0/SD_ILS:3595662024-05-24T10:49:41Z2024-05-24T10:49:41Zby Chua, Tee Khoon @ Chua Yong Peng<br/>Author Chua, Tee Khoon @ Chua Yong Peng, Chua, Yong Peng<br/>Format: Books<br/>Call Number TH438 C48 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004 2003<br/>Thesis (Master of Science (Construction Management)) - Universiti Teknologi Malaysia, 2004<br/>A study on implementing total quality management (TQM) in the construction industry in Malaysiaent://SD_ILS/0/SD_ILS:3553202024-05-24T10:49:41Z2024-05-24T10:49:41Zby Yeap, Ming Keong<br/>Author Yeap, Ming Keong<br/>Format: Books<br/>Call Number TH438 Y42 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Thesis (Doctor of Philosophy) - Universiti Teknologi Malaysia, 2003<br/>Supply chain management through partnering in Malaysian construction industryent://SD_ILS/0/SD_ILS:3410992024-05-24T10:49:41Z2024-05-24T10:49:41Zby Chuah, Chuan Chee<br/>Author Chuah, Chuan Chee<br/>Format: Books<br/>Call Number HD38.5 C58 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Thesis (Master of Engineering (Construction Management)) - Universiti Teknologi Malaysia, 2003<br/>Documentation of project quality plan for project management company in construction industryent://SD_ILS/0/SD_ILS:6901492024-05-24T10:49:41Z2024-05-24T10:49:41Zby Lee, Sooi Chuen<br/>Author Lee, Sooi Chuen, Abdul Hakim Mohammed, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD69.P75 L44 2000 raf<br/>Publication Date 2000<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2000<br/>Quality audit for project management company, consultant and contractor in construction industryent://SD_ILS/0/SD_ILS:7721062024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ting, Hie King<br/>Author Ting, Hie King, Abdul Hakim Mohammed, Sekolah Pengajian Siswazah<br/>Format: Books<br/>Call Number XX(772106.1)<br/>Publication Date 2000<br/>Thesis (Sarjana Kejuruteraan (Pengurusan Kejuruteraan)) - Universiti Teknologi Malaysia, 2000<br/>Best practices for multi-project management in the construction industryent://SD_ILS/0/SD_ILS:1413542024-05-24T10:49:41Z2024-05-24T10:49:41Zby Aminatuzuhariah Megat Abdullah<br/>Author Aminatuzuhariah Megat Abdullah<br/>Format: Books<br/>Call Number TH438 A44 2000<br/>Publisher University of Manchester Institute of Science and Technology,<br/>Publication Date 2000<br/>Thesis (PhD) - University of Manchester Institute of Science and Technology, 2000<br/>The implementation of environmental management system in design offices for construction industry in the United Kingdoment://SD_ILS/0/SD_ILS:4531222024-05-24T10:49:41Z2024-05-24T10:49:41Zby Aminatuzuhariah Megat Abdullah<br/>Author Aminatuzuhariah Megat Abdullah<br/>Format: Books<br/>Call Number TH6021 A65 1996<br/>Publisher University of Glamorgan Wales,<br/>Publication Date 1996<br/>Thesis (Master of Science (Construction Management)) - University of Glamorgan Wales, 1996<br/>FRAMEWORK OF PROJECT MANAGEMENT KEY PERFORMANCE INDICATORS FOR MEDIUM-SIZED BUILDING CONSTRUCTION INDUSTRY IN MALAYSIA /lcPOH NGOH KIEWent://SD_ILS/0/SD_ILS:8706622024-05-24T10:49:41Z2024-05-24T10:49:41Zby Poh, Ngoh Kiew, 1962-, author<br/>Author Poh, Ngoh Kiew, 1962-, author, Syuhaida Ismail, Ir.Dr., 1981-, supervisor, Aminah Md. Yusof. Dr., supervisor, Sekolah Razak UTM Dalam Kejuruteraan dan Teknologi Termaju<br/>Format: Books<br/>Call Number TH438 P64 2016 raf<br/>Thesis (Doktor Kejuruteraan (Pengurusan Perniagaan Kejuruteraan)) - Universiti Teknologi Malaysia, 2016<br/>Hybrid model of lean construction key drivers and barriers for adaptation in the construction industryent://SD_ILS/0/SD_ILS:8836692024-05-24T10:49:41Z2024-05-24T10:49:41Zby Gholamreza Dehdasht, 1982-, author<br/>Author Gholamreza Dehdasht, 1982-, author, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan. Sekolah Kejuruteraan Awam<br/>Format: Electronic Resources<br/>Call Number CP 083191 ra<br/>Publication Date 2019<br/>Thesis (Ph.D (Kejuruteraan Awam)) - Universiti Teknologi Malaysia, 2019<br/>Restricted until 18th Mac 2022<br/>Application of lean techniques in construction activity for inventoryent://SD_ILS/0/SD_ILS:8838752024-05-24T10:49:41Z2024-05-24T10:49:41Zby Siti Jamilah Ishak, 1992-, author<br/>Author Siti Jamilah Ishak, 1992-, author, Sha'ri Mohd. Yusof, supervisor, Fakulti Kejuruteraan. Sekolah Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 S583 2019 raf<br/>Publication Date 2019<br/>Thesis (Sarjana (Pengurusan Projek)) - Universiti Teknologi Malaysia, 2019<br/>Development of payment performance assessment tools for the Nigerian construction industryent://SD_ILS/0/SD_ILS:8817702024-05-24T10:49:41Z2024-05-24T10:49:41Zby Sani Abdullahi Sarki, 1973-, author<br/>Author Sani Abdullahi Sarki, 1973-, author, Razali Adul-Hamid, supervisor, Wan Yusoff Wan Mahmood, supervisor, Fakulti Alam Bina dan Ukur<br/>Format: Books<br/>Call Number HD9715.N5 S26 2019 raf<br/>Publication Date 2019<br/>Thesis (Doktor Falsafah (Ukur Bahan)) - Universiti Teknologi Malaysia, 2019<br/>Cabaran dan strategi dalam pemulihan semula projek terbengkalai bagi pusat membeli belah di Malaysiaent://SD_ILS/0/SD_ILS:8853042024-05-24T10:49:41Z2024-05-24T10:49:41Zby Fatin Amira Ahmad Sobri 1996-, author<br/>Author Fatin Amira Ahmad Sobri 1996-, author, Noorsidi Aizuddin Mat Noor, supervisor, Sekolah Kejuruteraan Bioperubatan dan Sains Kesihatan<br/>Format: Books<br/>Call Number HD9715.A2 F37 2019 raf<br/>Publication Date 2019<br/>Project Paper (Sarjana Muda Sains (Pengurusan Harta Tanah)) - Universiti Teknologi Malaysia, 2019<br/>The readiness level of housing developers to adopt build-then-sell system in Johorent://SD_ILS/0/SD_ILS:8738892024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurul Fazira Sa'at, 1995- , author<br/>Author Nurul Fazira Sa'at, 1995- , author, Nurul Syakima Mohd. Yusoff, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number TX960 N87 2018 raf<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Sains (Pengurusan Harta Tanah)) - Universiti Teknologi Malaysia, 2018<br/>Elemen baru dalam proses permohonan hakmilik strataent://SD_ILS/0/SD_ILS:8739132024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurafikha Jannah Mohd. Nor, 1981- , author<br/>Author Nurafikha Jannah Mohd. Nor, 1981- , author, Khadijah Hussin, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number TH4811 N871 2018 raf<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2018<br/>Lean thinking for on-going construction concreting work processent://SD_ILS/0/SD_ILS:8746572024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nur Fazreen Roslan, 1994-, author<br/>Author Nur Fazreen Roslan, 1994-, author, Abdul Kadir Marsono, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD58.9 N88 2018 raf<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/>Application of building information modelling during the design phase of the KVMRT SSP line : a case studyent://SD_ILS/0/SD_ILS:8748542024-05-24T10:49:41Z2024-05-24T10:49:41Zby Muhammad Hafiz Hassim, 1995-, author<br/>Author Muhammad Hafiz Hassim, 1995-, author, Eeydzah Aminudin, 1987-, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438.13 M84 2018 raf<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/>Keberkesanan pembinaan lean bagi mengurangkan sisa pembinaan di tapak pelupusanent://SD_ILS/0/SD_ILS:8777672024-05-24T10:49:41Z2024-05-24T10:49:41Zby Wan Muhammad Syaiful Bahar Wan Hanafi, 1984-, author<br/>Author Wan Muhammad Syaiful Bahar Wan Hanafi, 1984-, author, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438.4 W36 2018 raf<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/>Benefits, relevance and acceptance of Malaysian standard on construction solid waste managementent://SD_ILS/0/SD_ILS:8747372024-05-24T10:49:41Z2024-05-24T10:49:41Zby Sugeinthiran Sivarathnam, 1995-, author<br/>Author Sugeinthiran Sivarathnam, 1995-, author, Shazwin Mat Taib, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TD789.M4 S84 2018 raf<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/>Lean quality management system for construction process of steel works in constructionent://SD_ILS/0/SD_ILS:8747482024-05-24T10:49:41Z2024-05-24T10:49:41Zby Iylmiera Che Rosli, 1994-, author<br/>Author Iylmiera Che Rosli, 1994-, author, Abdul Kadir Marsono, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 I95 2018 raf<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/>Mengenalpasti faktor-faktor kelewatan projek pembinaan perumahan di Serene Heights (projek perumahan di Semenyih, Selangor)ent://SD_ILS/0/SD_ILS:8778792024-05-24T10:49:41Z2024-05-24T10:49:41Zby Muhamad Zaid Mohamad Radzwan, 1988-, author<br/>Author Muhamad Zaid Mohamad Radzwan, 1988-, author, Norhazilan Md. Noor, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438.4 M84 2018 raf<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/>Payment dispute resolution in construction industry by using CIPA ACT 2012ent://SD_ILS/0/SD_ILS:8711562024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ibrahim Saleh, 1976-, author<br/>Author Ibrahim Saleh, 1976-, author, Abdul Rahman Abdul Hamid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 I27 2018 raf<br/>Publication Date 2018<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2018<br/>Improvement of construction permit process approval at local government in Malaysiaent://SD_ILS/0/SD_ILS:8816242024-05-24T10:49:41Z2024-05-24T10:49:41Zby Bashir Ahamed Maideen, 1966-, author<br/>Author Bashir Ahamed Maideen, 1966-, author, Abdul Hakim Mohammed, supervisor, Ramli Nazir, supervisor, Fakulti Alam Bina dan Ukur<br/>Format: Books<br/>Call Number HD9715.M3 B37 2018 raf<br/>Publication Date 2018<br/>Thesis (Sarjana Sains (Pengurusan Fasiliti)) - Universiti Teknologi Malaysia, 2018<br/>Employer roles in construction safetyent://SD_ILS/0/SD_ILS:8686382024-05-24T10:49:41Z2024-05-24T10:49:41Zby Dzulkeflee Ismail, 1983 - , author<br/>Author Dzulkeflee Ismail, 1983 - , author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 D98 2016 raf<br/>Publication Date 2017<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2016<br/>5S implementation in construction industryent://SD_ILS/0/SD_ILS:8689672024-05-24T10:49:41Z2024-05-24T10:49:41Zby Loh, Chiew Peng, 1990- , author<br/>Author Loh, Chiew Peng, 1990- , author, Khairulzan Yahya, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 L64 2017 raf<br/>Publication Date 2017<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2017<br/>Elemen-elemen kritikal pengurusan perubahan di peringkat rekabantuk projek pembinaanent://SD_ILS/0/SD_ILS:8674792024-05-24T10:49:41Z2024-05-24T10:49:41Zby Abdul Aziz Harun, author<br/>Author Abdul Aziz Harun, author, Mat Naim Abdullah @ Mohd. Asmoni, 1969-, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number HD9715.A45 A23 2017 raf<br/>Publication Date 2017<br/>Thesis (Sarjana Pengurusan Aset dan Fasiliti)) - - Universiti Teknologi Malaysia, 2017<br/>Waste management on construction siteent://SD_ILS/0/SD_ILS:8681032024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nabila Najad Ajlan, 1994-, author<br/>Author Nabila Najad Ajlan, 1994-, author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TD899.C5885 N33 2017 raf<br/>Publication Date 2017<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2017<br/>Management of organizational stressor on construction workersent://SD_ILS/0/SD_ILS:8706242024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nur Arafah Ahmad Badrul, 1990- , author<br/>Author Nur Arafah Ahmad Badrul, 1990- , author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HF5548.85 N873 2017 raf<br/>Publication Date 2017<br/>Sarjana Kejuruteraan (Pembinaan) - Universiti Teknologi Malaysia, 2017<br/>Risk management of temporary works in construction projectsent://SD_ILS/0/SD_ILS:8706302024-05-24T10:49:41Z2024-05-24T10:49:41Zby Shatieswaran Dorasamy, 1990- , author<br/>Author Shatieswaran Dorasamy, 1990- , author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 S538 2017 raf<br/>Publication Date 2017<br/>Sarjana Kejuruteraan (Pembinaan) - Universiti Teknologi Malaysia, 2017<br/>Safety management in erecting and dismantling of scaffoldingent://SD_ILS/0/SD_ILS:8711342024-05-24T10:49:41Z2024-05-24T10:49:41Zby Anis Azira Sopie, 1988-, author<br/>Author Anis Azira Sopie, 1988-, author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH5281 A55 2017 raf<br/>Publication Date 2017<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2017<br/>A conceptual model of partnering legal issuesent://SD_ILS/0/SD_ILS:8533302024-05-24T10:49:41Z2024-05-24T10:49:41Zby Faraziera Mohd. Raslim, 1983- author<br/>Author Faraziera Mohd. Raslim, 1983- author, Nur Emma Mustaffa, supervisor, Jamaluddin Yaakub, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number XX(853330.1)<br/>Publication Date 2016<br/>Thesis (Ph.D (Ukur Bahan)) - Universiti Teknologi Malaysia, 2016<br/>Problems associated with acceleration works and its solutionsent://SD_ILS/0/SD_ILS:8582272024-05-24T10:49:41Z2024-05-24T10:49:41Zby Noor Jannah Mohamad Nazir, 1988-, author<br/>Author Noor Jannah Mohamad Nazir, 1988-, author, Maizon Hashim, Fakulti Alam Bina<br/>Format: Books<br/>Call Number XX(858227.1)<br/>Publication Date 2016<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2016<br/>Contractor's implied duty to warn design defectsent://SD_ILS/0/SD_ILS:8466902024-05-24T10:49:41Z2024-05-24T10:49:41Zby Gan, Gilbert Siang Yang, 1989-<br/>Author Gan, Gilbert Siang Yang, 1989-, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH425 G36 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>Payment culture in Malaysia construction industryent://SD_ILS/0/SD_ILS:8427962024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Khairul Anas Mohd. Badroldin, 1988-, author<br/>Author Mohd. Khairul Anas Mohd. Badroldin, 1988-, author, Abdul Rahim Abdul Hamid, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.M32 M64 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana Sains (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>Minimizing conflicts during construction stage by using building information modelingent://SD_ILS/0/SD_ILS:8428012024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Faiz Shapiai, 1983- author<br/>Author Mohd. Faiz Shapiai, 1983- author, Mohamad Syazli Fathi, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438.13 M64 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana Sains (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>Significant causes of disputes of final accountsent://SD_ILS/0/SD_ILS:8444482024-05-24T10:49:41Z2024-05-24T10:49:41Zby Kong, Sio Kah, 1977-<br/>Author Kong, Sio Kah, 1977-, Maizon Hashim, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 K666 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>Pelaksanaan sistem pengurusan kualiti di dalam projek pembinaan (PQMS)ent://SD_ILS/0/SD_ILS:8498662024-05-24T10:49:41Z2024-05-24T10:49:41Zby Fadzleen Norsyahira Saliman, 1991-<br/>Author Fadzleen Norsyahira Saliman, 1991-, Mat Naim Abdullah, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number HD9715 F39 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana Pengurusan Aset dan Fasiliti) - Universiti Teknologi Malaysia, 2015<br/>Maintenance management of road works under Majlis Bandaraya Ipohent://SD_ILS/0/SD_ILS:8560192024-05-24T10:49:41Z2024-05-24T10:49:41Zby Izdihar Niszar Syafiq Sarlan, 1987-, author<br/>Author Izdihar Niszar Syafiq Sarlan, 1987-, author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9717.5.R63 I93 2015 raf<br/>Publication Date 2015<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2015<br/>Inventory for knowledge management in construction organisationent://SD_ILS/0/SD_ILS:8455562024-05-24T10:49:41Z2024-05-24T10:49:41Zby Muhammad Nazirul Ahmad Fauzi, 1990- author<br/>Author Muhammad Nazirul Ahmad Fauzi, 1990- author, Abdul Kadir Marsono, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH215 M84 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana (Kejuruteraan Awam - Pengurusan Projek)) - Universiti Teknologi Malaysia, 2015<br/>Construction planning and scheduling methods adopted by contractors in preparing work programmeent://SD_ILS/0/SD_ILS:8600782024-05-24T10:49:41Z2024-05-24T10:49:41Zby Loo, Ivan Jien Hoeng, 1991-, author<br/>Author Loo, Ivan Jien Hoeng, 1991-, author, Fadhlin Abdullah, supervisor, Kherun Nita Ali, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 L66 2015 raf<br/>Publication Date 2015<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>Electronic diary for construction siteent://SD_ILS/0/SD_ILS:8601372024-05-24T10:49:41Z2024-05-24T10:49:41Zby Tey, Chau Yen , 1991-, author<br/>Author Tey, Chau Yen , 1991-, author, Roslan Amirudin, supervisor, Tantish Kamaruddin, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 T49 2015 raf<br/>Publication Date 2015<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>Procurement methods in reducing disputes for construction projectsent://SD_ILS/0/SD_ILS:8213132024-05-24T10:49:41Z2024-05-24T10:49:41Zby Abdullahi Abdul Aziz, 1976-<br/>Author Abdullahi Abdul Aziz, 1976-, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 A23 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Procurement methods and contractor's bidding strategy in Middle East construction industryent://SD_ILS/0/SD_ILS:8216132024-05-24T10:49:41Z2024-05-24T10:49:41Zby Omidreza Amirsoleimani, 1985- author<br/>Author Omidreza Amirsoleimani, 1985- author, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA190 O454 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Information sharing platform to support collaborative teamwork in constructionent://SD_ILS/0/SD_ILS:8430482024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ramzi Ibrahim, 1969-<br/>Author Ramzi Ibrahim, 1969-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(843048.1)<br/>Publication Date 2014<br/>Thesis (Ph.D (Kejuruteraan Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Managing the delayed completion in construction projectsent://SD_ILS/0/SD_ILS:8214392024-05-24T10:49:41Z2024-05-24T10:49:41Zby Debbie Melissa Clarence Botiti, 1989-<br/>Author Debbie Melissa Clarence Botiti, 1989-, Abdul Rahim Abdul Hamid, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(821439.1)<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Housing supply chain management in a rapid changing physical environmentent://SD_ILS/0/SD_ILS:8216742024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohamed Salem Ahmedou, 1982-<br/>Author Mohamed Salem Ahmedou, 1982-, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438.4 S25 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Risk assessment for construction supply chainent://SD_ILS/0/SD_ILS:8276612024-05-24T10:49:41Z2024-05-24T10:49:41Zby Alwerfally, Rehab M. O, 1980-<br/>Author Alwerfally, Rehab M. O, 1980-, Masine Md. Tap, supervisor, Fakulti Kejuruteraan Mekanikal<br/>Format: Books<br/>Call Number TH438 A49 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Kejuruteraan Industri)) - Universiti Teknologi Malaysia, 2014<br/>Delay in government project delivery in Kedahent://SD_ILS/0/SD_ILS:8329072024-05-24T10:49:41Z2024-05-24T10:49:41Zby Azlan Othman, 1962- author<br/>Author Azlan Othman, 1962- author, Syuhaida Ismail, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 A95 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014<br/>Delay in Johor Bahru construction projectent://SD_ILS/0/SD_ILS:8362892024-05-24T10:49:41Z2024-05-24T10:49:41Zby Juwairiah Jamaludin, 1991- author<br/>Author Juwairiah Jamaludin, 1991- author, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 J89 2014 raf<br/>Publication Date 2014<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2014<br/>Effectiveness of construction communication using information technologyent://SD_ILS/0/SD_ILS:8386092024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nur Syahina Yahya, 1990- author<br/>Author Nur Syahina Yahya, 1990- author, Abdul Kadir Marsono, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 N877 2014 raf<br/>Publication Date 2014<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan))) - Universiti Teknologi Malaysia, 2014<br/>Masalah ergonomik di kalangan pekerja binaan bagi projek pembinaan Persekutuan di bawah seliaan JKR Kedah /cNur Aidil Adila Edrusent://SD_ILS/0/SD_ILS:8432782024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nur Aidil Adila Edrus, 1983-, author<br/>Author Nur Aidil Adila Edrus, 1983-, author, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD8039.B9 N87 2014 raf<br/>Publication Date 2014<br/>Project Paper (Sarjana Muda (Kejuruteraan Awam - Pengurusan Pembinaan))- Universiti Teknologi Malaysia, 2014<br/>Knowledge management in the civil engineering construction sector in Nigeriaent://SD_ILS/0/SD_ILS:8367492024-05-24T10:49:41Z2024-05-24T10:49:41Zby Kasimu Alhaji Mohammed, 1972-<br/>Author Kasimu Alhaji Mohammed, 1972-, Roslan Amirudin, supervisor, Fadhlin Abdullah, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD30.2 K37 2014 raf<br/>Publication Date 2014<br/>Thesis (Ph.D (Ukur Bahan)) - Universiti Teknologi Malaysia, 2014<br/>Selection of material suppliers by the contractors in the construction industryent://SD_ILS/0/SD_ILS:8006772024-05-24T10:49:41Z2024-05-24T10:49:41Zby Alireza Ahankoob, 1982-<br/>Author Alireza Ahankoob, 1982-, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 A458 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Element of warranty of IBS structural system for construction industryent://SD_ILS/0/SD_ILS:8007322024-05-24T10:49:41Z2024-05-24T10:49:41Zby Annan Vessinuk Sing<br/>Author Annan Vessinuk Sing, Abdul Kadir Marsono, Masine Md. Tap, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH1000 A56 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Predicting the required duration for construction activities using Artificial Neural Networksent://SD_ILS/0/SD_ILS:8008482024-05-24T10:49:41Z2024-05-24T10:49:41Zby Hamed Golizadeh, 1987-<br/>Author Hamed Golizadeh, 1987-, Muhd. Zaimi Abd. Majid, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH215 H36 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Consultancy services in the Middle East constructionent://SD_ILS/0/SD_ILS:8011862024-05-24T10:49:41Z2024-05-24T10:49:41Zby Sepehr Alerasoul, 1985-<br/>Author Sepehr Alerasoul, 1985-, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 S47 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Management of variation order in Public Work Department Malaysia construction projectent://SD_ILS/0/SD_ILS:8012622024-05-24T10:49:41Z2024-05-24T10:49:41Zby Sharil Amran Amir Mohamed, 1986-<br/>Author Sharil Amran Amir Mohamed, 1986-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 S537 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>The use of analytical method for selection of dispute resolution methodsent://SD_ILS/0/SD_ILS:8197462024-05-24T10:49:41Z2024-05-24T10:49:41Zby Aref Charehzehi, 1986-<br/>Author Aref Charehzehi, 1986-, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715 A74 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Korean company practice in Malaysiaent://SD_ILS/0/SD_ILS:8198662024-05-24T10:49:41Z2024-05-24T10:49:41Zby Md. Sazali Md. Dalib, 1973-<br/>Author Md. Sazali Md. Dalib, 1973-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 M3739 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Architect's duties in relation to supervision of construction projectsent://SD_ILS/0/SD_ILS:7999542024-05-24T10:49:41Z2024-05-24T10:49:41Zby Sharisa Hussein, 1986-<br/>Author Sharisa Hussein, 1986-, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 S535 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Noise management on construction siteent://SD_ILS/0/SD_ILS:8008052024-05-24T10:49:41Z2024-05-24T10:49:41Zby Chai, Kin Yun, 1987-<br/>Author Chai, Kin Yun, 1987-, Zaiton Haron, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH375 C43 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>The prevalence of stress among project managers at construction siteent://SD_ILS/0/SD_ILS:8011492024-05-24T10:49:41Z2024-05-24T10:49:41Zby Raheleh Heydari Afshar, 1983-<br/>Author Raheleh Heydari Afshar, 1983-, Abdul Rahim Abdul Hamid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HF5548.85 R34 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Examination of IBS as green and sustainable construction through application of BIMent://SD_ILS/0/SD_ILS:8012042024-05-24T10:49:41Z2024-05-24T10:49:41Zby Seyed Meysam Khoshnava, 1980-<br/>Author Seyed Meysam Khoshnava, 1980-, Salihuddin Radin Sumadi, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438.13 S49 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>The aspect of garnishee proceedings in Malaysian construction industryent://SD_ILS/0/SD_ILS:8155952024-05-24T10:49:41Z2024-05-24T10:49:41Zby Abu Bakar Pai, 1970-<br/>Author Abu Bakar Pai, 1970-, Jamaluddin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 A283 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - UniversitiTeknologi Malaysia, 2013<br/>Profile of common construction disputes occurring in practiceent://SD_ILS/0/SD_ILS:8155972024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mona Iryani Muhamad Tahir, 1975-<br/>Author Mona Iryani Muhamad Tahir, 1975-, Rosli Abd. Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 M663 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - UniversitiTeknologi Malaysia, 2013<br/>Profile of common construction disputes occurring in practiceent://SD_ILS/0/SD_ILS:8155982024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mona Iryani Muhamad Tahir, 1975-<br/>Author Mona Iryani Muhamad Tahir, 1975-<br/>Format: Books<br/>Call Number CP 031161 ra<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - UniversitiTeknologi Malaysia, 2013<br/>The profile of contractual issues associated with subcontracts in Malaysian construction industryent://SD_ILS/0/SD_ILS:8156022024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Ehyauddin Ahmad Zaki, 1986-<br/>Author Mohd. Ehyauddin Ahmad Zaki, 1986-, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.M3 M64 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - UniversitiTeknologi Malaysia, 2013<br/>Estimate in formation of construction contractent://SD_ILS/0/SD_ILS:8184032024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ezatul Sharida Ahmad Termizi, 1988-<br/>Author Ezatul Sharida Ahmad Termizi, 1988-, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 E93 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Application of earned value analysis (EVA) in construction project in Malaysiaent://SD_ILS/0/SD_ILS:7937142024-05-24T10:49:41Z2024-05-24T10:49:41Zby Pung, Geik Ying, 1989-<br/>Author Pung, Geik Ying, 1989-, Razali Abdul Hamid, supervisor, Syamsul Hendra Mahmud, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 P86 2013 raf<br/>Publication Date 2013 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Delay and extansion of time : the real issue in conflicts between time-bar provisions and prevention principleent://SD_ILS/0/SD_ILS:8281122024-05-24T10:49:41Z2024-05-24T10:49:41Zby Hamim Mohd. Zin, 1967-<br/>Author Hamim Mohd. Zin, 1967-, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 H365 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Minor defects and practical completionent://SD_ILS/0/SD_ILS:7995922024-05-24T10:49:41Z2024-05-24T10:49:41Zby Fani Dhuha, 1983-<br/>Author Fani Dhuha, 1983-, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 F36 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan Kontrak)) - Universiti Teknologi Malaysia, 2012<br/>Measuring project success in Malaysian construction industryent://SD_ILS/0/SD_ILS:8261912024-05-24T10:49:41Z2024-05-24T10:49:41Zby Jaimey Attau, 1973-, author<br/>Author Jaimey Attau, 1973-, author, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(826191.1)<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Profile of set-off cases in Malaysian construction industryent://SD_ILS/0/SD_ILS:7996832024-05-24T10:49:41Z2024-05-24T10:49:41Zby Loo, Shih Nie @ Nancy Loo<br/>Author Loo, Shih Nie @ Nancy Loo, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 L664 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Termination of construction contracts by employerent://SD_ILS/0/SD_ILS:7997382024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohammad Mahdi Hosseini, 1984-<br/>Author Mohammad Mahdi Hosseini, 1984-, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 M648 2013 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2013<br/>Architect's liability in making decision during construction stageent://SD_ILS/0/SD_ILS:7997432024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurhidayah Kamaludin, 1988-<br/>Author Nurhidayah Kamaludin, 1988-, Nur Emma Mustaffa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 N87 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Kecuaian profesional dalam industri pembinaanent://SD_ILS/0/SD_ILS:7797452024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Farid Omar, 1985-<br/>Author Mohd. Farid Omar, 1985-, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 M434 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Executive dashboard reports for public sector clients in construction industryent://SD_ILS/0/SD_ILS:7855622024-05-24T10:49:41Z2024-05-24T10:49:41Zby Amir Hossein Borghei, 1984-<br/>Author Amir Hossein Borghei, 1984-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 A457 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Evaluation of construction time performance and waste time reduction by utilizing lean paradigment://SD_ILS/0/SD_ILS:7855642024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ali Asghar Bavafa, 1987-<br/>Author Ali Asghar Bavafa, 1987-, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 A453 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Time measurement for improvement for construction using deming theoryent://SD_ILS/0/SD_ILS:7859672024-05-24T10:49:41Z2024-05-24T10:49:41Zby Kamyar Kabirifar, 1983-<br/>Author Kamyar Kabirifar, 1983-, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 K364 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Quantitative buildability assessment system for building projectent://SD_ILS/0/SD_ILS:7904912024-05-24T10:49:41Z2024-05-24T10:49:41Zby Shaik Hussein Mydin, 1973-<br/>Author Shaik Hussein Mydin, 1973-, Muhd. Zaimi Abd. Majid, supervisor, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH153 S53 2012 raf<br/>Publication Date 2012<br/>Thesis (Doktor Falsafah Kejuruteraan (Teknologi dan Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Achieving integrated project design using Building Information Modeling (BIM)ent://SD_ILS/0/SD_ILS:7756882024-05-24T10:49:41Z2024-05-24T10:49:41Zby Tan, Mei Ying, 1987-<br/>Author Tan, Mei Ying, 1987-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 T366 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>An integration of industrialised building system with building information modelling to improve construction industry productivityent://SD_ILS/0/SD_ILS:7757132024-05-24T10:49:41Z2024-05-24T10:49:41Zby Seyed Saeed Banihashemi Namini, 1985-<br/>Author Seyed Saeed Banihashemi Namini, 1985-, Salihuddin Radin Sumadi, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH1000 S49 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>The challenges in implementing incentive based contract in Jabatan Kerja Raya projectent://SD_ILS/0/SD_ILS:7757192024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurrul Hudha Haryati Amzah, 1974-<br/>Author Nurrul Hudha Haryati Amzah, 1974-, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438.4 N877 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Amalan housekeeping di tapak binaent://SD_ILS/0/SD_ILS:7757372024-05-24T10:49:41Z2024-05-24T10:49:41Zby Norliza Shahabudin, 1987-<br/>Author Norliza Shahabudin, 1987-, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 N6759 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Shortest lead time for document management in construction for shortest lead time of projects using Microsoft Office Grooveent://SD_ILS/0/SD_ILS:7759302024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ali Zarebidaki, 1986-<br/>Author Ali Zarebidaki, 1986-, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438.4 A45 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Constructability database knowledge model and guidelines of industrial plant at construction stageent://SD_ILS/0/SD_ILS:7856582024-05-24T10:49:41Z2024-05-24T10:49:41Zby Erman Surya Bakti, 1965-<br/>Author Erman Surya Bakti, 1965-, Muhd. Zaimi Abd. Majid, Rosli Mohamad Zin, supervisor, Eko Budi Santoso, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 E76 2012 raf<br/>Publication Date 2012<br/>Thesis (Ph.D Sains (Awam - Teknologi dan Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Improvement of ergonomics awareness on construction sitesent://SD_ILS/0/SD_ILS:7857972024-05-24T10:49:41Z2024-05-24T10:49:41Zby Erni Fairuza Kornain, 1988-<br/>Author Erni Fairuza Kornain, 1988-, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH146 E76 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Lead time in construction processent://SD_ILS/0/SD_ILS:7861722024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurul Arafah Ishak, 1986-<br/>Author Nurul Arafah Ishak, 1986-, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 N8785 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Establishment of a work programme model for contractorent://SD_ILS/0/SD_ILS:7863562024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ahmad Fauzi Awang, 1972-<br/>Author Ahmad Fauzi Awang, 1972-, Khairulzan Yahya, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 A363 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) – Universiti Teknologi Malaysia, 2012<br/>A structured critical success factors model for implementing project quality management system in constructionent://SD_ILS/0/SD_ILS:7899502024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mat Naim Abdullah, 1969-<br/>Author Mat Naim Abdullah, 1969-, Miswan @ Abdul Hakim Mohammed, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number HD9715.A2 M384 2012 raf<br/>Publication Date 2012<br/>Thesis (Ph.D (Pengurusan Fasiliti)) - Universiti Teknologi Malaysia, 2012<br/>Requirement of value management in construction sector at Malaysian Airports Holdings Berhad (MAHB)ent://SD_ILS/0/SD_ILS:7908472024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Naim Hamid, 1968-<br/>Author Mohd. Naim Hamid, 1968-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 M644 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>The construction safety awareness among construction workers in Malaysiaent://SD_ILS/0/SD_ILS:7937112024-05-24T10:49:41Z2024-05-24T10:49:41Zby Teo, Tze Meng, 1989-<br/>Author Teo, Tze Meng, 1989-, Ismail Haron, supervisor, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 T463 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>The relationship between construction resource management to costs and profits from the perspective of contractor companiesent://SD_ILS/0/SD_ILS:7937152024-05-24T10:49:41Z2024-05-24T10:49:41Zby Matheson Tuah Anak Norma, 1990-, author<br/>Author Matheson Tuah Anak Norma, 1990-, author, Fuziah Ismail, supervisor, Tantish Kamaruddin, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715 M38 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Risiko di tapak bina bagi projek pembinaan yang menggunakan sistem pembinaan berindustri (IBS)ent://SD_ILS/0/SD_ILS:7937412024-05-24T10:49:41Z2024-05-24T10:49:41Zby Sangeetha Arjinan, 1990- , author<br/>Author Sangeetha Arjinan, 1990- , author, Muzani Mustapa, supervisor, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 S26 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Personnel job satisfaction and job performance in Sudanese construction firmsent://SD_ILS/0/SD_ILS:7496012024-05-24T10:49:41Z2024-05-24T10:49:41Zby Hani Mohamed Hussien Ahmaidi, 1982-<br/>Author Hani Mohamed Hussien Ahmaidi, 1982-, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 H36 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Potential use of palm oil fuel ash as a construction materialent://SD_ILS/0/SD_ILS:7496422024-05-24T10:49:41Z2024-05-24T10:49:41Zby Pui, Yun Fatt, 1985-<br/>Author Pui, Yun Fatt, 1985-, Mohammad Ismail, supervisor, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 P85 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Meminimakan pembaziran bahan binaan di tapak pembinaanent://SD_ILS/0/SD_ILS:7650382024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ahmad Tarmizi Md. Tahir, 1988-, author<br/>Author Ahmad Tarmizi Md. Tahir, 1988-, author, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(765038.1)<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Managing the impact of economic crisis to construction projectent://SD_ILS/0/SD_ILS:8025222024-05-24T10:49:41Z2024-05-24T10:49:41Zby Wendara Bayu Sumapraja, 1980-<br/>Author Wendara Bayu Sumapraja, 1980-, Fadhlin Abdullah, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 W464 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti teknologi Malaysia, 2011<br/>The reliability and effectiveness of department estimate in tender evaluationent://SD_ILS/0/SD_ILS:7584462024-05-24T10:49:41Z2024-05-24T10:49:41Zby Che Ku Sufiah Che Ku Abdullah, 1984-<br/>Author Che Ku Sufiah Che Ku Abdullah, 1984-, Aminah Md. Yusof, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 C58 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Perlaksanaan pengurusan berkesan projek Sistem Binaan Berindustri (IBS) di Jabatan Kerja Raya (JKR)ent://SD_ILS/0/SD_ILS:7584622024-05-24T10:49:41Z2024-05-24T10:49:41Zby Fazilah Hatta @ Antah, 1982-<br/>Author Fazilah Hatta @ Antah, 1982-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 F39 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Sistem pemantauan perlaksanaan projek pembinaan bangunan untuk kegunaan pertahananent://SD_ILS/0/SD_ILS:7695702024-05-24T10:49:41Z2024-05-24T10:49:41Zby Che Hasim Awang, 1968-<br/>Author Che Hasim Awang, 1968-, Maimunah Sapri, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number TH438.2 C44 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Pengurusan Aset dan Fasiliti) - Universiti Teknologi Malaysia, 2011<br/>Pelaksanaan rekabentuk jalan dengan menggunakan pendekatan pengurusan nilaient://SD_ILS/0/SD_ILS:7728742024-05-24T10:49:41Z2024-05-24T10:49:41Zby Lim, Keat Eng, 1967-<br/>Author Lim, Keat Eng, 1967-, Hishamuddin Mohd. Ali, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number TH438 L565 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Aset dan Pengurusan Fasiliti)) - Universiti Teknologi Malaysia, 2011<br/>Mutual termination of contract in construction projectsent://SD_ILS/0/SD_ILS:7752292024-05-24T10:49:41Z2024-05-24T10:49:41Zby Awang Muhamad Jambol, 1977-<br/>Author Awang Muhamad Jambol, 1977-, Nur Emma Mustaffa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 A934 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/>Payment for off-site unfixed materials and goodsent://SD_ILS/0/SD_ILS:7754632024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurhanisa Hasmah Rustam, 1988-<br/>Author Nurhanisa Hasmah Rustam, 1988-, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA403.6 N87 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2011<br/>Contractor performance measurement for public school projectsent://SD_ILS/0/SD_ILS:7761902024-05-24T10:49:41Z2024-05-24T10:49:41Zby Siti Rashidah Mohd. Nasir, 1971-<br/>Author Siti Rashidah Mohd. Nasir, 1971-, Muhd. Zaimi Abd. Majid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 S585 2011 raf<br/>Publication Date 2011<br/>Thesis (Ph.D Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Faktor-faktor bagi menerapkan budaya penyelenggaraanent://SD_ILS/0/SD_ILS:7773752024-05-24T10:49:41Z2024-05-24T10:49:41Zby Samidah Samlawi, 1988-<br/>Author Samidah Samlawi, 1988-, Mohd. Saidin Misnan, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH3361 S26 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2011<br/>Kelambatan dan lanjutan masa pembinaan bangunan akademik Universiti Teknologi Malaysiaent://SD_ILS/0/SD_ILS:7773772024-05-24T10:49:41Z2024-05-24T10:49:41Zby Rashidah Daut, 1989-, author<br/>Author Rashidah Daut, 1989-, author, Nur Emma Mustaffa, supervisor, Norazam Othman, 1963-, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA190 R37 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2011<br/>Material waste in structural works for construction projectsent://SD_ILS/0/SD_ILS:7773892024-05-24T10:49:41Z2024-05-24T10:49:41Zby Lau, Charles Kwok Chung, 1988-<br/>Author Lau, Charles Kwok Chung, 1988-, Ahmad Rosdan Razak, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 L386 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Diagnosis budaya organisasi dalam firma perunding binaan menggunakan kaedah "competing values framework"ent://SD_ILS/0/SD_ILS:7775082024-05-24T10:49:41Z2024-05-24T10:49:41Zby Maizatul Hassanah Shahrul Hana, 1988-<br/>Author Maizatul Hassanah Shahrul Hana, 1988-, Wan Yusoff Wan Mahmood, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD58.7 M354 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2011<br/>Discrepancy between design and construction workent://SD_ILS/0/SD_ILS:7775392024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mong, Chiu Li, 1988-<br/>Author Mong, Chiu Li, 1988-, Nur Emma Mustaffa, supervisor, Norizan Mansor, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 M66 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2011<br/>Level of awareness towards building information modelling (BIM) among quantity surveyors in Malaysiaent://SD_ILS/0/SD_ILS:7776702024-05-24T10:49:41Z2024-05-24T10:49:41Zby Tan, Choon Boon, 1988-<br/>Author Tan, Choon Boon, 1988-, Kherun Nita Ali, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438.13 T36 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2011<br/>Tahap kesedaran ke atas building information modelling (BIM) dikalangan juruteraent://SD_ILS/0/SD_ILS:7776762024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nur Farah Farhana Rasid, 1990-<br/>Author Nur Farah Farhana Rasid, 1990-, Kherun Nita Ali, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438.13 N87 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2011<br/>Strategi bagi mengatasi kelewatan projek pembinaan awament://SD_ILS/0/SD_ILS:7776892024-05-24T10:49:41Z2024-05-24T10:49:41Zby Norsyazreen Ramlan, 1988- , author<br/>Author Norsyazreen Ramlan, 1988- , author, Sarajul Fikri Mohamed, supervisor, Ismail Haron, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 N67466 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2011<br/>Implementing knowledge sharing in construction industry firmsent://SD_ILS/0/SD_ILS:7570542024-05-24T10:49:41Z2024-05-24T10:49:41Zby Winnie, Bong Chui Nyuk, 1987-<br/>Author Winnie, Bong Chui Nyuk, 1987-, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 W56 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Problems and dilemmas of class F contractors' participation in large projectsent://SD_ILS/0/SD_ILS:7582942024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Ikhmil Faevwasz Mohd. Hanif, 1981-<br/>Author Mohd. Ikhmil Faevwasz Mohd. Hanif, 1981-, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 M555 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>The potential of graph model as dispute resolution in Malaysiaent://SD_ILS/0/SD_ILS:7583202024-05-24T10:49:41Z2024-05-24T10:49:41Zby Wan Faaizah Wan Husain, 1985-<br/>Author Wan Faaizah Wan Husain, 1985-, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 W43 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>The development of small and medium sized construction firms in Nigeria using absorptive capacityent://SD_ILS/0/SD_ILS:7585102024-05-24T10:49:41Z2024-05-24T10:49:41Zby Bilau Abdulquadri Ade, 1982-<br/>Author Bilau Abdulquadri Ade, 1982-, Arham Abdullah, supervisor, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 B55 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Tendering contract : breach by the employerent://SD_ILS/0/SD_ILS:7693982024-05-24T10:49:41Z2024-05-24T10:49:41Zby Suziana Abdul Hamid, 1978-<br/>Author Suziana Abdul Hamid, 1978-, Jamaluddin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH425 S89 2011 raf<br/>Publication Date 2011<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Material wastage management at design stageent://SD_ILS/0/SD_ILS:7773832024-05-24T10:49:41Z2024-05-24T10:49:41Zby Amyradha Munusamy, 1988- , author<br/>Author Amyradha Munusamy, 1988- , author, Norazam Othman, supervisor, Fadhlin Abdullah, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TD195.B84 A49 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2011<br/>Pengurusan kualiti kerja-kerja pembinaanent://SD_ILS/0/SD_ILS:7773682024-05-24T10:49:41Z2024-05-24T10:49:41Zby Abdul Razalan Hassanul Basri, 1988- , author<br/>Author Abdul Razalan Hassanul Basri, 1988- , author, Fadhlin Abdullah, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 A236 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Risiko kerja pembinaan pada waktu malament://SD_ILS/0/SD_ILS:7775262024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Naqib Mohd. Yusop, 1988- , author<br/>Author Mohd. Naqib Mohd. Yusop, 1988- , author, Ismail Haron, supervisor, Norizan Mansor, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 M534 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Kemungkinan perlaksanaan partnering dalam industri pembinaan di Malaysiaent://SD_ILS/0/SD_ILS:7775522024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurhidayah Kamaludin, 1988-<br/>Author Nurhidayah Kamaludin, 1988-, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA210 N879 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2011<br/>Faktor-faktor kritikal kejayaan bagi tapak pembinaan di kawasan yang sesakent://SD_ILS/0/SD_ILS:7775592024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurul Adilah Saludin, 1988-<br/>Author Nurul Adilah Saludin, 1988-, Mohd. Saidin Misnan, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 N8748 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2011<br/>Pengurusan aliran tunai syarikat pembinaanent://SD_ILS/0/SD_ILS:7807372024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Nur Iman Al Hafiz Mohd. Jamil, 1987-<br/>Author Mohd. Nur Iman Al Hafiz Mohd. Jamil, 1987-, Jamaluddin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438.15 M66 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2011<br/>Pengurusan stok bahan dalam sektor pembinaanent://SD_ILS/0/SD_ILS:6282972024-05-24T10:49:41Z2024-05-24T10:49:41Zby Leow, Ann Hong, 1985-<br/>Author Leow, Ann Hong, 1985-, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TS161 L46 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Binaan)) - Universiti Teknologi Malaysia, 2010<br/>Strategies to enhance the usage of Cad Based Measurement Software (CBMS)ent://SD_ILS/0/SD_ILS:7293012024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nur Mala Ismail, 1984-<br/>Author Nur Mala Ismail, 1984-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 N53 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Hill land development challenges in Penang Islandent://SD_ILS/0/SD_ILS:7293922024-05-24T10:49:41Z2024-05-24T10:49:41Zby Anilarasu Amaranazan, 1981-<br/>Author Anilarasu Amaranazan, 1981-, Muhd. Zaimi Abdul Majid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 A55 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Time compression using fast track approachent://SD_ILS/0/SD_ILS:7293952024-05-24T10:49:41Z2024-05-24T10:49:41Zby Amir Azmi Nawawi, 1967-<br/>Author Amir Azmi Nawawi, 1967-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 A45 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Improving time estimation in JKR projectent://SD_ILS/0/SD_ILS:7294372024-05-24T10:49:41Z2024-05-24T10:49:41Zby Muhamad Khair Hasan, 1960-<br/>Author Muhamad Khair Hasan, 1960-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438.4 M54 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Productivity rate of roof works for JKR school project schedulingent://SD_ILS/0/SD_ILS:7295242024-05-24T10:49:41Z2024-05-24T10:49:41Zby Zuraida Zaini Rijal, 1971-<br/>Author Zuraida Zaini Rijal, 1971-, Muhd. Zaimi Abd. Majid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 Z874 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Schedule risk analysis in offshore development projectent://SD_ILS/0/SD_ILS:7295522024-05-24T10:49:41Z2024-05-24T10:49:41Zby Budi Hermanto, 1971-<br/>Author Budi Hermanto, 1971-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 B834 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Building information modeling in local construction industryent://SD_ILS/0/SD_ILS:7297792024-05-24T10:49:41Z2024-05-24T10:49:41Zby Hammad Dabo Baba, 1970-<br/>Author Hammad Dabo Baba, 1970-, Muhd. Zaimi Abdul Majid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 H364 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Sistem perolehan reka dan bina bagi projek Jabatan Kerja Rayaent://SD_ILS/0/SD_ILS:7298312024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurzalisa Abd. Rahim, 1979-<br/>Author Nurzalisa Abd. Rahim, 1979-, Rosli Mohamad Zin, supervisor, Bachan Singh Besawa Jagar Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 N93 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Assessment of the potential benefits of four-dimensional planning and scheduling software in construction projectent://SD_ILS/0/SD_ILS:7298412024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Syah Rizal Yahya, 1979-<br/>Author Mohd. Syah Rizal Yahya, 1979-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 M79 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Practical guide for demolishing reinforced concrete chimneyent://SD_ILS/0/SD_ILS:7298492024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohammadali Kazerooni Sadi, 1986-<br/>Author Mohammadali Kazerooni Sadi, 1986-, Arham Abdullah, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 M53 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Effective project delivery-strategies for successful implementation of projects under 10th Malaysia planent://SD_ILS/0/SD_ILS:7298752024-05-24T10:49:41Z2024-05-24T10:49:41Zby Hairol Ab. Rahim, 1977-<br/>Author Hairol Ab. Rahim, 1977-, Mohd. Hassan Mohd. Osman, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 H354 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Strategies for managing delay in Mara's building constructionent://SD_ILS/0/SD_ILS:7298832024-05-24T10:49:41Z2024-05-24T10:49:41Zby Khairunnizam Sulaiman, 1970-<br/>Author Khairunnizam Sulaiman, 1970-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 K43 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Kajian perancangan dan susunatur tapak bina oleh kontraktor dalam projek pembinaan di kawasan Universiti Teknologi Malaysia, Kampus Skudaient://SD_ILS/0/SD_ILS:7358112024-05-24T10:49:41Z2024-05-24T10:49:41Zby Norhidayah Sulong, 1987-, author<br/>Author Norhidayah Sulong, 1987-, author, Sarajul Fikri Mohamed, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA210 N67 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Project management tools and technique used in managing construction projectent://SD_ILS/0/SD_ILS:6252322024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ngu, Kaik Hua, 1987-<br/>Author Ngu, Kaik Hua, 1987-, Bachan Singh Besawa Jagar Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 N484 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Case study : resource-work scheduling monitoringent://SD_ILS/0/SD_ILS:6255602024-05-24T10:49:41Z2024-05-24T10:49:41Zby Eng, Chong Ren, 1986- , author<br/>Author Eng, Chong Ren, 1986- , author, Azhar Ahmad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(625560.1)<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2010<br/>Construction site waste management approach in Universiti Teknologi Malaysiaent://SD_ILS/0/SD_ILS:6286142024-05-24T10:49:41Z2024-05-24T10:49:41Zby Chai, Welfred Khai Hung, 1986-<br/>Author Chai, Welfred Khai Hung, 1986-, Khairulzan Yahya, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA210 C43 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Binaan)) - Universiti Teknologi Malaysia, 2010<br/>Critical competencies for effective services in private finance initiative (PFI)ent://SD_ILS/0/SD_ILS:7293042024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nursyazwani Mohd. Sofi, 1984-<br/>Author Nursyazwani Mohd. Sofi, 1984-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.M32 N79 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Improvement of project planning process to satisfy clients’ satisfaction in project implementationent://SD_ILS/0/SD_ILS:7295642024-05-24T10:49:41Z2024-05-24T10:49:41Zby Wan Norhayati Wan Abdul Ghani, 1962-<br/>Author Wan Norhayati Wan Abdul Ghani, 1962-, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA190 W56 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) – Universiti Teknologi Malaysia, 2010<br/>Factors influence construction time performance for IBS in Malaysia Construction Industryent://SD_ILS/0/SD_ILS:7297842024-05-24T10:49:41Z2024-05-24T10:49:41Zby Siti Nur Hafizeanie Salahuddin, 1980-<br/>Author Siti Nur Hafizeanie Salahuddin, 1980-, Muhd. Zaimi Abdul Majid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438.4 S68 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Faktor-faktor kritikal yang mempengaruhi tempoh penyiapan projek-projek Jabatan Kerja Rayaent://SD_ILS/0/SD_ILS:7297882024-05-24T10:49:41Z2024-05-24T10:49:41Zby Samri Embong, 1972-<br/>Author Samri Embong, 1972-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 S264 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Malaysia construction experience in deployment of crane services for construction projectent://SD_ILS/0/SD_ILS:7299482024-05-24T10:49:41Z2024-05-24T10:49:41Zby Faten Adilah Ahmad Shukri, 1981-<br/>Author Faten Adilah Ahmad Shukri, 1981-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 F38 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>A green cost allocation model for office and commercial buildings in Malaysiaent://SD_ILS/0/SD_ILS:7299522024-05-24T10:49:41Z2024-05-24T10:49:41Zby Behzad Hamidi, 1986-<br/>Author Behzad Hamidi, 1986-, Muhd. Zaimi Abd. Majid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 B44 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Keberkesanan penggunaan jadual kemajuan kerja terhadap kemajuan kerja sebenar dalam industri pembinaanent://SD_ILS/0/SD_ILS:7354552024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nur Adila Abu Bakar, 1988-, author<br/>Author Nur Adila Abu Bakar, 1988-, author, Nur Emma Mustaffa, supervisor, Wan Yusoff Wan Mahmood, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 N8747 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/>Kebersihan tapak pembinaanent://SD_ILS/0/SD_ILS:7485472024-05-24T10:49:41Z2024-05-24T10:49:41Zby Norliza Shahabudin, 1987-, author<br/>Author Norliza Shahabudin, 1987-, author, Syamsul Hendra Mahmud, supervisor, Nur Emma Mustaffa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 N6748 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Ketidaksempurnaan dokumen perunding-perunding profesionalent://SD_ILS/0/SD_ILS:7775432024-05-24T10:49:41Z2024-05-24T10:49:41Zby Muhammad Ammar Jamadi, 1987-, author<br/>Author Muhammad Ammar Jamadi, 1987-, author, Ismail Haron, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH435 M84 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/>Impak strategi bangunan hijau ke atas prestasi bangunan di dalam konteks keselesaan penghunient://SD_ILS/0/SD_ILS:7696312024-05-24T10:49:41Z2024-05-24T10:49:41Zby Subiah Sulaiman, 1963-<br/>Author Subiah Sulaiman, 1963-, Hishamuddin Mohd. Ali, supervisor, Fakulti Geoinformasi dan Harta Tanah<br/>Format: Books<br/>Call Number TH145 S83 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Aset dan Fasiliti)) - Universiti Teknologi Malaysia, 2010<br/>Faktor-faktor kejayaan kritikal sistem pengurusan kualiti dalam firma kontraktorent://SD_ILS/0/SD_ILS:7775192024-05-24T10:49:41Z2024-05-24T10:49:41Zby Lim, Yong Ching , author<br/>Author Lim, Yong Ching , author, Razali Abdul Hamid, supervisor, Wan Yusoff Wan Mahmood, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD62.15 L563 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>The rationale behind CIDB's move to enforce the inclusion of MS ISO 9001 for grade G7 contractorsent://SD_ILS/0/SD_ILS:7776612024-05-24T10:49:41Z2024-05-24T10:49:41Zby Sarah Aqmah Mohamad Yusof, 1987-<br/>Author Sarah Aqmah Mohamad Yusof, 1987-, Ismail Haron, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH425 S27 2010 raf<br/>Publication Date 2010<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2010<br/>Critical factors for the implementation of total quality management in construction project managementent://SD_ILS/0/SD_ILS:6262702024-05-24T10:49:41Z2024-05-24T10:49:41Zby Yeow, Yoon Foo, 1951-<br/>Author Yeow, Yoon Foo, 1951-, Nooh Abu Bakar, Pusat Perniagaan Teknologi Termaju<br/>Format: Books<br/>Call Number HD62.15 Y46 2010 raf<br/>Publication Date 2010<br/>Thesis (Ph.D (Pengurusan Perniagaan Kejuruteraan)) - Universiti Teknologi Malaysia, 2010<br/>This title is classified as an open access starting from 19/2/2020<br/>Apartments ownership and maintenanceent://SD_ILS/0/SD_ILS:3932852024-05-24T10:49:41Z2024-05-24T10:49:41Zby Behzad Ahmadnia, 1984-<br/>Author Behzad Ahmadnia, 1984-, Rosli Mohamad Zin, supervisor, Bachan Singh, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 B43 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Development of quantitative quality cost matrix for Malaysian construction quality management systement://SD_ILS/0/SD_ILS:3923492024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mukhtar Che Ali, 1958-<br/>Author Mukhtar Che Ali, 1958-, Rosli Mohamad Zin, supervisor, Zuhairi Abdul Hamid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD62.15 M84 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Knowledge management in constructionent://SD_ILS/0/SD_ILS:3932662024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ee, Lee Chuan, 1986-<br/>Author Ee, Lee Chuan, 1986-, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH215 E34 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Critical sucess factors for contracting organization during recessionent://SD_ILS/0/SD_ILS:3881112024-05-24T10:49:41Z2024-05-24T10:49:41Zby Azlinda Masabbir Ali, 1982-<br/>Author Azlinda Masabbir Ali, 1982-, Muhd. Zaimi Abd. Majid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH215 A94 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia,2010<br/>Application of six sigma philosophy for quality management system in constructionent://SD_ILS/0/SD_ILS:3882952024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohamad Ali Ramli, 1974-<br/>Author Mohamad Ali Ramli, 1974-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 M379 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunkerent://SD_ILS/0/SD_ILS:3885942024-05-24T10:49:41Z2024-05-24T10:49:41Zby Tan, Swee Kok, 1979-<br/>Author Tan, Swee Kok, 1979-, Rozana Zakaria, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 T367 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Dispute resolution in relation to delay of construction projectent://SD_ILS/0/SD_ILS:3886782024-05-24T10:49:41Z2024-05-24T10:49:41Zby Tan, Kian Soon, 1978-<br/>Author Tan, Kian Soon, 1978-, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 T366 2010 raf<br/>Publication Date 2010<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2010<br/>Perlaksanaan sistem pengurusan kualiti ISO 9001 : 2000 dalam industri pembinaan di Malaysiaent://SD_ILS/0/SD_ILS:3544782024-05-24T10:49:41Z2024-05-24T10:49:41Zby Norsyahidah Razlan<br/>Author Norsyahidah Razlan, Abdul Hakim Mohammed, Fakulti Kejuruteraan dan Sains Geoinformasi<br/>Format: Books<br/>Call Number HD62.15 N68 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pengurusan Harta Tanah)) - Universiti Teknologi Malaysia, 2009<br/>Application of ISO in Malaysia construction industryent://SD_ILS/0/SD_ILS:3576802024-05-24T10:49:41Z2024-05-24T10:49:41Zby Joomizan Noordin<br/>Author Joomizan Noordin, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH420 J66 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>The impact of management error on construction project performanceent://SD_ILS/0/SD_ILS:3598852024-05-24T10:49:41Z2024-05-24T10:49:41Zby Abdul Khalid Mohamad Doll<br/>Author Abdul Khalid Mohamad Doll, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA190 A23 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Aplikasi ICT dalam pengurusan sumber manusia difirma kontraktor dan firma pemajuent://SD_ILS/0/SD_ILS:3772782024-05-24T10:49:41Z2024-05-24T10:49:41Zby Fariz Arif<br/>Author Fariz Arif<br/>Format: Books<br/>Call Number HD9715 F37 2009<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pembinaan) ) - Universiti Teknologi Malaysia, 2009<br/>Perlaksanaan kerja penyediaan tapak bina kerja bangunanent://SD_ILS/0/SD_ILS:3773092024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Faizal Ismail<br/>Author Mohd. Faizal Ismail<br/>Format: Books<br/>Call Number TH145 M42 2009<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pembinaan) ) - Universiti Teknologi Malaysia, 2009<br/>A comparative study of construction project delays in Johor and Sabah regionent://SD_ILS/0/SD_ILS:3796222024-05-24T10:49:41Z2024-05-24T10:49:41Zby Dayang Sabriah Safri, 1986-<br/>Author Dayang Sabriah Safri, 1986-, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 D72 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Web-based application for value management during judgement phaseent://SD_ILS/0/SD_ILS:3805262024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nor Suraya Suaid, 1983-<br/>Author Nor Suraya Suaid, 1983-, Rosli Mohamad Zin, supervisor, Mohd. Mazlan Che Mat, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 N78 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Kaedah pengurusan sisa pembinaan ditapak binaent://SD_ILS/0/SD_ILS:3813942024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nuratiqah Mohd. Rosely<br/>Author Nuratiqah Mohd. Rosely, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 N8774 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Sains - Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Kesan peningkatan harga bahan binaan terhadap industri pembinaan di Malaysiaent://SD_ILS/0/SD_ILS:3814862024-05-24T10:49:41Z2024-05-24T10:49:41Zby Wan Liyana Wan Abd. Halim<br/>Author Wan Liyana Wan Abd. Halim, Asiah Othman, supervisor, Fakulti Kejuruteraan dan Sains Geoinformasi<br/>Format: Books<br/>Call Number TH438.15 W36 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2009<br/>Tahap perlaksanaan pengurusan keselamatan di tapak pembinaan Syarikat Perumahan Negara Berhadent://SD_ILS/0/SD_ILS:3840632024-05-24T10:49:41Z2024-05-24T10:49:41Zby Noorzilawati Abdul Basar<br/>Author Noorzilawati Abdul Basar, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 N668 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>The superintendent officer's roles and authorities in contributing towards better environmentent://SD_ILS/0/SD_ILS:7589712024-05-24T10:49:41Z2024-05-24T10:49:41Zby Lee, Lin Jye, 1974-<br/>Author Lee, Lin Jye, 1974-, Rosli Abdul Rashid, supervisor, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA210 L444 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>The accuracy of pre tender estimateent://SD_ILS/0/SD_ILS:7815062024-05-24T10:49:41Z2024-05-24T10:49:41Zby Syareeza Mohd. Kassim, 1979-<br/>Author Syareeza Mohd. Kassim, 1979-, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 S93 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/>Implikasi sistem pengurusan kualiti dan pensijilan ISO 9001:2000 terhadap kontraktor di Negeri Melakaent://SD_ILS/0/SD_ILS:7816282024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Helmi Zakariah<br/>Author Mohd. Helmi Zakariah, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD62.15 M54 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/>Punca-punca kelewatan di tapak binaent://SD_ILS/0/SD_ILS:7824132024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nuhairi Hutamin<br/>Author Nuhairi Hutamin, Kherun Nita Ali, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 N84 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Formalisation of partnering as a collaborative procurement methodent://SD_ILS/0/SD_ILS:6043792024-05-24T10:49:41Z2024-05-24T10:49:41Zby Chang, Siaw Hui<br/>Author Chang, Siaw Hui, Nur Emma Mustaffa, supervisor, Fakulti Alam Bina<br/>Format: Computer file<br/>Call Number TH145 C52 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Pengurusan kawalan kualiti dalam mengurangkan risiko kecacatan bangunan dalam pembinaan kajian kes : Uda Land (North) Sdn. Bhd.ent://SD_ILS/0/SD_ILS:3815242024-05-24T10:49:41Z2024-05-24T10:49:41Zby Normas Sheila Mohammad Fozei<br/>Author Normas Sheila Mohammad Fozei, Khadijah Hussin, supervisor, Fakulti Kejuruteraan dan Sains Geoinformasi<br/>Format: Books<br/>Call Number HD62.15 N69 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2009<br/>Keberkesanan kaedah perancangan pengurusan sisa pembinaan dalam mengurangkan jumalah sisa yang dijana di tapak binaent://SD_ILS/0/SD_ILS:3815862024-05-24T10:49:41Z2024-05-24T10:49:41Zby Juliani Jamil, 1987-, author<br/>Author Juliani Jamil, 1987-, author, Zakaria Mohd. Yusoff, supervisor, Yahya Mohamad Yatim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 J85 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Kajian terhadap risiko penggunaan pekerja asing di tapak pembinaan bangunanent://SD_ILS/0/SD_ILS:3816362024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nidzar Hakim Md. Yussof<br/>Author Nidzar Hakim Md. Yussof, Ahmad Rosdan Abdul Razak, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 N52 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Pengurusan bahan : penjaga keselamatan dan pengawalan kualiti bahan di tapak binaent://SD_ILS/0/SD_ILS:3816582024-05-24T10:49:41Z2024-05-24T10:49:41Zby Khairunnisa Asyifaa Khairudin<br/>Author Khairunnisa Asyifaa Khairudin, Hamizah Liyana Tajul Ariffin, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438.2 K43 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Pengurusan sisa bahan binaan di tapak binaent://SD_ILS/0/SD_ILS:3818602024-05-24T10:49:41Z2024-05-24T10:49:41Zby Norazeman Abd Ghani<br/>Author Norazeman Abd Ghani, Razali Adul Hamid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TD791 N676 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Khidmat perunding pengurusan projek dalam industri binaan Malaysiaent://SD_ILS/0/SD_ILS:3818732024-05-24T10:49:41Z2024-05-24T10:49:41Zby Shahira Hamdan<br/>Author Shahira Hamdan, Roslan Amirudin, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 S529 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/>Perspektif kumpulan projek terhadap perubahan kerja dalam pembinaan bangunanent://SD_ILS/0/SD_ILS:3818832024-05-24T10:49:41Z2024-05-24T10:49:41Zby Siti Noraisyah Mohd. Noor<br/>Author Siti Noraisyah Mohd. Noor, Zakaria Mohd. Yusof, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 S59 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Arahan perubahan kerja dalam pembinaan institusi pendidikan Majlis Amanah Rakyat (MARA)ent://SD_ILS/0/SD_ILS:3837512024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Suhaimi Ariffin<br/>Author Mohd. Suhaimi Ariffin, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA190 M63 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>The legal status of construction work programme in the construction industryent://SD_ILS/0/SD_ILS:3995522024-05-24T10:49:41Z2024-05-24T10:49:41Zby Siti Fairus Othman, 1976-<br/>Author Siti Fairus Othman, 1976-, Nur Emma Mustaffa, supervisor, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 S42 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan) - Universiti Teknologi Malaysia, 2009<br/>Discrepancies and ambiguities in contract documentent://SD_ILS/0/SD_ILS:3997852024-05-24T10:49:41Z2024-05-24T10:49:41Zby Kumalasari Kipli, 1979-<br/>Author Kumalasari Kipli, 1979-, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 K85 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Measure of damages for defective building workent://SD_ILS/0/SD_ILS:4001192024-05-24T10:49:41Z2024-05-24T10:49:41Zby Wong, Bi Xia<br/>Author Wong, Bi Xia, Nur Emma Mustaffa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH425 W664 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Provisional liquidated damages (PLD)ent://SD_ILS/0/SD_ILS:4020062024-05-24T10:49:41Z2024-05-24T10:49:41Zby Siti Baizura Mohamad Noor<br/>Author Siti Baizura Mohamad Noor, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA210 S575 2009 raf<br/>Publication Date 2009 2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Defence of abatement for defective worksent://SD_ILS/0/SD_ILS:4020322024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohamad Fairuz Kiprawi<br/>Author Mohamad Fairuz Kiprawi, Nur Emma Mustaffa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA210 M636 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak pembinaan))- Universiti Teknologi Malaysia, 2009<br/>Formalisation of partnering as a collaborative procurement methodent://SD_ILS/0/SD_ILS:3996822024-05-24T10:49:41Z2024-05-24T10:49:41Zby Chang, Siaw Hui<br/>Author Chang, Siaw Hui<br/>Format: Books<br/>Call Number CP 023125 ra<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Permasalahan kelewatan dalam projek pembinaan jalan di Kuala Lumpurent://SD_ILS/0/SD_ILS:4018312024-05-24T10:49:41Z2024-05-24T10:49:41Zby M. Faizal Zulkarnaini<br/>Author M. Faizal Zulkarnaini, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TE175 M43 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2009<br/>Pengurusan data bahan binaan di firma kontraktorent://SD_ILS/0/SD_ILS:3774082024-05-24T10:49:41Z2024-05-24T10:49:41Zby Muhamad Hafiz Rusdi<br/>Author Muhamad Hafiz Rusdi<br/>Format: Books<br/>Call Number TA403.6 M83 2009<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>E-commerce in the construction industry supply chain : current practise and future improvementsent://SD_ILS/0/SD_ILS:3789842024-05-24T10:49:41Z2024-05-24T10:49:41Zby Khu, Say Yen<br/>Author Khu, Say Yen, Roslan Amirudin, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 K58 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Sains - Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Status of e-business implementation in the Malaysian construction industryent://SD_ILS/0/SD_ILS:3806182024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohsen Foroughi-Sabzevar, 1980-<br/>Author Mohsen Foroughi-Sabzevar, 1980-, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 M635 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Pengurusan bahan binaan dalam projek pembinaanent://SD_ILS/0/SD_ILS:3030172024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ee, Lee Chuan<br/>Author Ee, Lee Chuan, Zakaria Mohd. Yusof, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 E34 2009<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Pengurusan sisa pembinaan dalam projek pengubahsuaian dan perobohan bangunanent://SD_ILS/0/SD_ILS:3032582024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ida Suzana Alimat<br/>Author Ida Suzana Alimat<br/>Format: Books<br/>Call Number TH438 I32 2009<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2009<br/>Pengurusan sisa pembinaan di tapak binaent://SD_ILS/0/SD_ILS:3034772024-05-24T10:49:41Z2024-05-24T10:49:41Zby Shah Jahan Omar<br/>Author Shah Jahan Omar, Fadhlin Abdullah, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 S527 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Kesedaran dan kesediaan mengenai konsep partnering dalam industri pembinaan di Malaysiaent://SD_ILS/0/SD_ILS:3034872024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurulaini Danial<br/>Author Nurulaini Danial, Nur Emma Mustaffa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA210 N875 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Pengurusan keselamatan di tapak bina dari aspek penggunaan perancahent://SD_ILS/0/SD_ILS:3034892024-05-24T10:49:41Z2024-05-24T10:49:41Zby Kamarularifin Ismail<br/>Author Kamarularifin Ismail, Mohd. Saidin Misnan, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 K355 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Facilities management at design phaseent://SD_ILS/0/SD_ILS:3502832024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohamad Norhidayat Mohamed Ali<br/>Author Mohamad Norhidayat Mohamed Ali, Maizan Baba, supervisor, Fakulti Kejuruteraan dan Sains Geoinformasi<br/>Format: Books<br/>Call Number TS177 M64 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Sains (Pengurusan Harta Tanah)) - Universiti Teknologi Malaysia, 2009<br/>Keberkesanan pengurusan keselamatan di tapak binaent://SD_ILS/0/SD_ILS:3568312024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nur Izralia Pungut<br/>Author Nur Izralia Pungut, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH443 N87 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Perlantikan kontraktor dan permasalahan dalam prosedur dan polisi prokumen TNBent://SD_ILS/0/SD_ILS:3580822024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohamad Yanin Malik<br/>Author Mohamad Yanin Malik, Rozana Zakaria, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TX955 M63 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Reduce, reuse, recycle and recovery technique in sustainable construction waste managementent://SD_ILS/0/SD_ILS:3220852024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Firdaus Mustaffa Kamal, 1984-<br/>Author Mohd. Firdaus Mustaffa Kamal, 1984-, Arham Abdullah, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TD899.C5885 M45 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Managing variation order in Majlis Amanah Rakyat (MARA) projectsent://SD_ILS/0/SD_ILS:3216262024-05-24T10:49:41Z2024-05-24T10:49:41Zby Sharifah Ruzanna Syed Baharom, 1984-<br/>Author Sharifah Ruzanna Syed Baharom, 1984-, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 S78 2009 raf<br/>Publication Date 2009<br/>Thesis ( Sarjana Kejuruteraan ( Awam - Pengurusan Pembinaan )) - Universiti Teknologi malaysia, 2009<br/>Tahap risiko di peringkat rekabentuk dan pembinaan untuk projek di Jabatan Kerja Rayaent://SD_ILS/0/SD_ILS:3221512024-05-24T10:49:41Z2024-05-24T10:49:41Zby Rosnita Abdul Rani, 1973-<br/>Author Rosnita Abdul Rani, 1973-, Khairulzan Yahya, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 R676 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Proses penilaian tender bagi projek rekabentuk dan binaent://SD_ILS/0/SD_ILS:3030492024-05-24T10:49:41Z2024-05-24T10:49:41Zby Balqis Abdul Fatah<br/>Author Balqis Abdul Fatah, Zakaria Mohd. Yusof, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH434 B34 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Permintaan dan penawaran bahan binaan bagi projek perumahanent://SD_ILS/0/SD_ILS:3032482024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nor Huzaidah Naim<br/>Author Nor Huzaidah Naim, Nurshikin Mohamad Shukery, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 N6745 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Pemilihan kaedah reka dan bina oleh klien sektor awam dan swastaent://SD_ILS/0/SD_ILS:3032942024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nor Fadzlly Hasbullah<br/>Author Nor Fadzlly Hasbullah, Saidin Misnan, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH145 N67 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Kos kitaran hayat bagi penggunaan 'exterior insulation and finish system'(EIFS)ent://SD_ILS/0/SD_ILS:3034932024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nik Naqiyah Adibah Nik Mustaffa<br/>Author Nik Naqiyah Adibah Nik Mustaffa, Syamsul Hendra Mahmud, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TD791 N54 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2009<br/>Model for throughput performance measures and monitoring system in semiconductor industryent://SD_ILS/0/SD_ILS:3294802024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ng, Poh Lay<br/>Author Ng, Poh Lay, Muhammad Zameri Mat Saman, supervisor<br/>Format: Books<br/>Call Number TH438 N366 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Kejuruteraan (Industri Kejuruteraan)) - Universiti Teknologi Malaysia, 2009<br/>Factors affecting in the preparation of construction work scheduleent://SD_ILS/0/SD_ILS:3297512024-05-24T10:49:41Z2024-05-24T10:49:41Zby Bong, Justin Chunn Tat, 1985-<br/>Author Bong, Justin Chunn Tat, 1985-, Prof. Dr. Muhd Zaimi Abd Majid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 B664 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2009<br/>Vendor managed inventory in construction industry in Malaysiaent://SD_ILS/0/SD_ILS:3330502024-05-24T10:49:41Z2024-05-24T10:49:41Zby Wai, Soon Han, 1984-<br/>Author Wai, Soon Han, 1984-, Aminah Md. Yusof, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 W34 2009 raf<br/>Publication Date 2009<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) , Universiti Teknologi Malaysia, 2009<br/>Tahap kefahaman dan kesesuaian pemeriksaan kesihatan projek sebagai alat pemantauan di Jabatan Kerja Rayaent://SD_ILS/0/SD_ILS:2265432024-05-24T10:49:41Z2024-05-24T10:49:41Zby Waznah Abdul Aziz, 1969-<br/>Author Waznah Abdul Aziz, 1969-, Rosli Mohamad Zin, supervisor<br/>Format: Books<br/>Call Number HD9715.A2 W39 2008<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>The causes and impact of poor construction documentation in construction organizationsent://SD_ILS/0/SD_ILS:2266142024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Kamarul Izwan Zainal Abidin, 1980-<br/>Author Mohd. Kamarul Izwan Zainal Abidin, 1980-, Rosli Mohamad Zin, supervisor<br/>Format: Books<br/>Call Number HD9715.A2 M634 2008<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Causes and steps to minimize variations in construction projectsent://SD_ILS/0/SD_ILS:2342492024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ahmad Zaki Ali<br/>Author Ahmad Zaki Ali<br/>Format: Books<br/>Call Number TH438 A924 2008<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Keusahawanan Teknologi Maklumat)) - Universiti Teknologi Malaysia, 2008<br/>Acuan bagi pembinaan bangunan bertingkat : penyiasatan ke atas aspek kegagalan dan keselamatan acuanent://SD_ILS/0/SD_ILS:2406672024-05-24T10:49:41Z2024-05-24T10:49:41Zby Atikah Hamzah<br/>Author Atikah Hamzah, Rosli Mohammad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 A855 2008 raf<br/>Publication Date 2008<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=59626">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Sistem laporan eksekutif bagi kerja - kerja penyelenggaraan di Pejabat Harta Binaent://SD_ILS/0/SD_ILS:2407272024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Hafiz Mohd. Bokhori<br/>Author Mohd. Hafiz Mohd. Bokhori, Arham Abdullah, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH3351 M64 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Reengineering of ISO 9001:2000 document management system compliance with construction inspection processent://SD_ILS/0/SD_ILS:2407752024-05-24T10:49:41Z2024-05-24T10:49:41Zby Thong, Jia Wen, 1980-<br/>Author Thong, Jia Wen, 1980-, Abdul Kadir Marsono<br/>Format: Books<br/>Call Number TS156.6 T46 2008<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Kelewatan projek pembinaan (Project delay in construction)ent://SD_ILS/0/SD_ILS:2334812024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nor Elina Naha<br/>Author Nor Elina Naha, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TA190 N67 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Preparation of feasibility study for construction projectsent://SD_ILS/0/SD_ILS:2473752024-05-24T10:49:41Z2024-05-24T10:49:41Zby Yap, Lawrence Sie Kiong, 1985-<br/>Author Yap, Lawrence Sie Kiong, 1985-, Fadhlin Abdullah, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH435 Y364 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Ubahsuai senarai bahan kepada senarai aktiviti bagi pengurusan pembinaan menggunakan perisian Microsoft projectent://SD_ILS/0/SD_ILS:2474692024-05-24T10:49:41Z2024-05-24T10:49:41Zby Amalina Khamis<br/>Author Amalina Khamis, Jamaluddin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 A42 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Analisa kos awalan dan tempoh pulang modal untuk pembekal atau kontraktor bagi projek yang menggunakan sistem acuan terowongent://SD_ILS/0/SD_ILS:2475002024-05-24T10:49:41Z2024-05-24T10:49:41Zby Md. Wazir Shafiq Mohd. Anuar<br/>Author Md. Wazir Shafiq Mohd. Anuar, Ismail Haron, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 M82 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Kajian tentang pemilihan pembekal bahan binaan diindustri pembinaanent://SD_ILS/0/SD_ILS:2533482024-05-24T10:49:41Z2024-05-24T10:49:41Zby Wong, Peter Ing Hock<br/>Author Wong, Peter Ing Hock, Roslan Amirudin, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA403 W66 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Kelambatan dan lanjutan masa bagi projek kerajaanent://SD_ILS/0/SD_ILS:2533562024-05-24T10:49:41Z2024-05-24T10:49:41Zby Norul Huda Hanafi<br/>Author Norul Huda Hanafi, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 N6747 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Tahap perlaksanaan sistem 5 'S' bagi keselamatan dan kesihatan di tapak binaent://SD_ILS/0/SD_ILS:2537372024-05-24T10:49:41Z2024-05-24T10:49:41Zby Zahratul' Ain Omar<br/>Author Zahratul' Ain Omar, Syamsul Hendra Mahmud, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA192 Z33 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>Tahap penggunaan teknologi maklumat dalam firma juruukur bahanent://SD_ILS/0/SD_ILS:2935492024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ahmad Zaki Mohd. Azman<br/>Author Ahmad Zaki Mohd. Azman, Abd. Ghani Khalid, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD30.2 A36 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/>The development of matrix measurement guideline of collaborative teamwork environment in construction industryent://SD_ILS/0/SD_ILS:2936852024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurdiana Azmi, 1984-<br/>Author Nurdiana Azmi, 1984-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 N395 2008 raf<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>The challenges in international construction project with regard to safety compliance and cross cultural managementent://SD_ILS/0/SD_ILS:2937052024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nor Amin Mohd. Radzuan, 1974-<br/>Author Nor Amin Mohd. Radzuan, 1974-, Mohamad Ibrahim Mohamad, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715 A444 2008<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Causes of poor participation of local workers in Malaysia construction industry and strategies for improvementent://SD_ILS/0/SD_ILS:2937112024-05-24T10:49:41Z2024-05-24T10:49:41Zby Shiadri Saleh @ Aman, 1975-<br/>Author Shiadri Saleh @ Aman, 1975-, Muhd. Zaimi Abdul Majid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 S54 2008 raf<br/>Publication Date 2008<br/><a href="http://eprints.utm.my/9584">Full text thesis via UTM-IR</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Lean construction : knowledge and barriers in implementing into Malaysia construction industryent://SD_ILS/0/SD_ILS:2938242024-05-24T10:49:41Z2024-05-24T10:49:41Zby Lim, Victor Aik Jin, 1985-<br/>Author Lim, Victor Aik Jin, 1985-, Rosli Mohamad Zin, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 L55 2008 raf<br/>Publication Date 2008<br/><a href="http://eprints.utm.my/9590">Full text thesis via UTM-IR</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Penggunaan aplikasi teknologi maklumat ke atas syarikat kontraktor binaan di Malaysiaent://SD_ILS/0/SD_ILS:2954892024-05-24T10:49:41Z2024-05-24T10:49:41Zby Ummul Habibah Daud<br/>Author Ummul Habibah Daud, Maizon Hashim, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD30.2 U46 2008 raf<br/>Publication Date 2008<br/>Projet Paper (Sarjana Muda (Ukur Bahan)) - Universiti teknologi Malaysia, 2008<br/>Tahap motivasi pekerja asing dan pekerja tempatan di tapak bina melalui perspektif kontraktorent://SD_ILS/0/SD_ILS:2954922024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nuraini Adnan<br/>Author Nuraini Adnan<br/>Format: Books<br/>Call Number TH438 N8745 2008<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Projet Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2008<br/>The liability of project director under the design and build procurement systement://SD_ILS/0/SD_ILS:3040202024-05-24T10:49:41Z2024-05-24T10:49:41Zby Yong, Leng Siew, 1984-<br/>Author Yong, Leng Siew, 1984-, Maizon Hashim, supervisor, Rosli Abdul Rashid, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH425 Y664 2008 raf<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Pengurusan sisa pembinaan oleh kontraktorent://SD_ILS/0/SD_ILS:2415592024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Azrul Zainal Abdin<br/>Author Mohd. Azrul Zainal Abdin, Muhd. Zaimi Abd. Majid, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 M645 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Dokumen kontrak sebagai panduan pengurusan buruh dalam projek pembinaanent://SD_ILS/0/SD_ILS:2473872024-05-24T10:49:41Z2024-05-24T10:49:41Zby Chai, Chang Sa'ar<br/>Author Chai, Chang Sa'ar, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH165 C52 2008 raf<br/>Publication Date 2008<br/>Project Paper (Sarjana Muda (Sains - Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Unethical conduct among professionals in the construction industryent://SD_ILS/0/SD_ILS:2724192024-05-24T10:49:41Z2024-05-24T10:49:41Zby Azilla Abd. Rahman<br/>Author Azilla Abd. Rahman, Zaimi Abd. Majid, supervisor<br/>Format: Books<br/>Call Number HD9715.A2 A94 2008<br/>Publisher Universiti Teknologi Malaysia<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Binaan)) - Universiti Teknologi Malaysia, 2008<br/>Simulation safety management of IBS constructionent://SD_ILS/0/SD_ILS:2914682024-05-24T10:49:41Z2024-05-24T10:49:41Zby Abdullahi Abdullatif Bashir, 1980-<br/>Author Abdullahi Abdullatif Bashir, 1980-, Abdul Kadir Marsono, Masine Md. Tap, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH443 A22 2008 raf<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Collaborative site monitoring system for construction siteent://SD_ILS/0/SD_ILS:2914762024-05-24T10:49:41Z2024-05-24T10:49:41Zby Chong, Ka Fung<br/>Author Chong, Ka Fung, Arham Abdullah, supervisor, Universiti Teknologi Malaysia. Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 C36 2008<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Minimising construction disputesent://SD_ILS/0/SD_ILS:2915342024-05-24T10:49:41Z2024-05-24T10:49:41Zby Noraziah Wahi, 1982-<br/>Author Noraziah Wahi, 1982-, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 N82 2008 raf<br/>Publication Date 2008<br/><a href="http://eprints.utm.my/9576">Full text thesis via UTM-IR</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Punca dan impak perubahan kerja dalam projek milik UDA Holdings Berhad (UDA)ent://SD_ILS/0/SD_ILS:2932062024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohamad Noor Ropiah Abu Bakar<br/>Author Mohamad Noor Ropiah Abu Bakar, Rosli Mohamad Zin, supervisor, Universiti Teknologi Malaysia. Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number HD9715.A2 M632 2008<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Analisis kecacatan semasa pembinaan dan kualiti bangunan di celcoment://SD_ILS/0/SD_ILS:2932102024-05-24T10:49:41Z2024-05-24T10:49:41Zby Noor Azahar Osman<br/>Author Noor Azahar Osman, Rosli Mohamad Zin, supervisor, Universiti Teknologi Malaysia. Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 N6672 2008 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2008<br/>Thesis (Sajana Sains (Pengurusan Pembinaan)) - Fakulti Kejuruteraan Awam, Universiti Teknologi Malaysia, 2008<br/>Risk analysis of housing projects in Malaysia using an industrialised building systement://SD_ILS/0/SD_ILS:3245652024-05-24T10:49:41Z2024-05-24T10:49:41Zby Saiful Azri Abu Hasan Sazalli<br/>Author Saiful Azri Abu Hasan Sazalli<br/>Format: Books<br/>Call Number TH1000 S253 2008 raf<br/>Publication Date 2008<br/>Thesis (Sarjana Sains) - Universiti Putra Malaysia, 2008<br/>PFI as the key to infrastructure development in Nigeriaent://SD_ILS/0/SD_ILS:3037962024-05-24T10:49:41Z2024-05-24T10:49:41Zby Olorunkiya Joshua Olutayo<br/>Author Olorunkiya Joshua Olutayo, Fadhlin Abdullah, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 O46 2008<br/>Publication Date 2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/>Kajian mengenai tahap kualiti dalam pembinaan pada perspektif klienent://SD_ILS/0/SD_ILS:1947942024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohammad Faiz Mariman<br/>Author Mohammad Faiz Mariman<br/>Format: Books<br/>Call Number TH438 M635 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Perlaksanaan pengurusan berkonsepkan Just - In - Time (JIT) di dalam sistem pasang siapent://SD_ILS/0/SD_ILS:2086692024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nor Aini Md. Nasir<br/>Author Nor Aini Md. Nasir, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TS157.4 N67 2007 raf<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2007<br/>Tahap penerimaan teknologi ''Computer Aided Drafting and Design '' (AutoCAD/CADD) di kalangan pengurusan atasan dalam industri pembinaanent://SD_ILS/0/SD_ILS:2086942024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nik Nur Hayati Nik Mahmood<br/>Author Nik Nur Hayati Nik Mahmood<br/>Format: Books<br/>Call Number TH438 N58 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Sains (Pembangunan Sumber Manusia)) - Universiti Teknologi Malaysia, 2007<br/>Kajian keberkesanan peranan CIDB di dalam pembangunan sumber manusia industri pembinaanent://SD_ILS/0/SD_ILS:2260812024-05-24T10:49:41Z2024-05-24T10:49:41Zby Yusrillhaffiz Hamzah<br/>Author Yusrillhaffiz Hamzah, Abdul Kadir Marsono, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 Y88 2007 raf<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Struktur dan Bahan)) - Universiti Teknologi Malaysia, 2007<br/>Document management model for collaborative constructionent://SD_ILS/0/SD_ILS:1798512024-05-24T10:49:41Z2024-05-24T10:49:41Zby Shahhul Hameed Shahib Muhammad Abdul Haq Shahib<br/>Author Shahhul Hameed Shahib Muhammad Abdul Haq Shahib, Abdul Kadir Marsono<br/>Format: Books<br/>Call Number T58.6 S55 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Managing construction of telecommunication tower projects in Celcoment://SD_ILS/0/SD_ILS:1808312024-05-24T10:49:41Z2024-05-24T10:49:41Zby Zirwatul Hana Pison, 1979<br/>Author Zirwatul Hana Pison, 1979, Mohamad Ibrahim Mohamad, supervisor<br/>Format: Books<br/>Call Number TH438 Z57 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Effective management of coastal and maritime engineering projectsent://SD_ILS/0/SD_ILS:1858102024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohd. Azwan Sayuti Mohd. Aziz<br/>Author Mohd. Azwan Sayuti Mohd. Aziz, Rosli Mohamad Zin, supervisor<br/>Format: Books<br/>Call Number TH438 M39 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Kriteria pemilihan kaedah reka dan binaent://SD_ILS/0/SD_ILS:1799162024-05-24T10:49:41Z2024-05-24T10:49:41Zby Norhaida Abdullah<br/>Author Norhaida Abdullah<br/>Format: Books<br/>Call Number TH438 N677 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Sains (Pengurusan Harta Tanah ) - Universiti Teknologi Malaysia, 2007<br/>Educating early awareness of new construction philosophyent://SD_ILS/0/SD_ILS:1806202024-05-24T10:49:41Z2024-05-24T10:49:41Zby Za'im Basiran<br/>Author Za'im Basiran, Aminah Md. Yusuf, supervisor<br/>Format: Books<br/>Call Number TH145 Z34 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Sistem pengurusan alam sekitar (EMS) dalam pembinaanent://SD_ILS/0/SD_ILS:1918412024-05-24T10:49:41Z2024-05-24T10:49:41Zby Azlinda Ariffin<br/>Author Azlinda Ariffin, Aziruddin Ressang, supervisor, Fakulti Kejuruteraan Awam<br/>Format: Books<br/>Call Number TH438 A945 2007 raf<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Kejuruteraan (Awam - Pengurusan)) - Universiti Teknologi Malaysia, 2007<br/>The delay at pre-tendering stage of projects in Accommodation and Works Directorate Ministry of Defense Kuala Lumpurent://SD_ILS/0/SD_ILS:2014862024-05-24T10:49:41Z2024-05-24T10:49:41Zby Lakhbir Singh Gurmukh Singh<br/>Author Lakhbir Singh Gurmukh Singh<br/>Format: Books<br/>Call Number TH438 L35 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Kajian semula pembaziran bahan binaan ditapak binaent://SD_ILS/0/SD_ILS:1478242024-05-24T10:49:41Z2024-05-24T10:49:41Zby Akmal Wani Sulong<br/>Author Akmal Wani Sulong<br/>Format: Books<br/>Call Number TA403.6 A45 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Quality performance of ISO 9000/2001 certified contractorsent://SD_ILS/0/SD_ILS:1495292024-05-24T10:49:41Z2024-05-24T10:49:41Zby Gui, Hun Chuen<br/>Author Gui, Hun Chuen<br/>Format: Books<br/>Call Number HD9715.A2 G84 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Faktor-faktor utama yang mempengaruhi lebihan kos dan kelewatan dalam pembinaanent://SD_ILS/0/SD_ILS:1497352024-05-24T10:49:41Z2024-05-24T10:49:41Zby Wong, Chee Foong<br/>Author Wong, Chee Foong<br/>Format: Books<br/>Call Number TH435 W665 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Employer's rights and contractor's liabilities in relation to construction defects after final certificateent://SD_ILS/0/SD_ILS:1501722024-05-24T10:49:41Z2024-05-24T10:49:41Zby Tan, Pei Ling<br/>Author Tan, Pei Ling<br/>Format: Books<br/>Call Number TA210 T37 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=51470">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Peranan pengurus projek dalam menghasilkan produk pembinaan yang berkualitient://SD_ILS/0/SD_ILS:1505012024-05-24T10:49:41Z2024-05-24T10:49:41Zby Mohammad Nasoha Nasri<br/>Author Mohammad Nasoha Nasri<br/>Format: Books<br/>Call Number TH425 M62 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>"Price-quality method (PQM)" dalam penilaian tender projek swastaent://SD_ILS/0/SD_ILS:1505652024-05-24T10:49:41Z2024-05-24T10:49:41Zby Tai, Yee Yeong<br/>Author Tai, Yee Yeong<br/>Format: Books<br/>Call Number TA210 T344 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Pengurusan keselamatan menyeluruh dalam industri binaanent://SD_ILS/0/SD_ILS:1537382024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nor Hayati Tun Jaafar<br/>Author Nor Hayati Tun Jaafar<br/>Format: Books<br/>Call Number TH443 N67 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah) - Universiti Teknologi Malaysia, 2007<br/>Kesan penamatan kontrak subkontraktor dinamakan bagi projek milik kerajaanent://SD_ILS/0/SD_ILS:1538362024-05-24T10:49:41Z2024-05-24T10:49:41Zby Nurdalila Md. Rahin<br/>Author Nurdalila Md. Rahin<br/>Format: Books<br/>Call Number TH438 N878 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2007<br/>Perbandingan produktiviti buruh asing dan buruh tempatan dalam kerja bataent://SD_ILS/0/SD_ILS:1542712024-05-24T10:49:41Z2024-05-24T10:49:41Zby Wee, Siew Kee<br/>Author Wee, Siew Kee<br/>Format: Books<br/>Call Number TH438 W334 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>Automated construction project progress monitoring systement://SD_ILS/0/SD_ILS:1545452024-05-24T10:49:41Z2024-05-24T10:49:41Zby Zubair Ahmed Memon<br/>Author Zubair Ahmed Memon, Muhd. Zaimi Abd. Majid, supervisor<br/>Format: Books<br/>Call Number TH438 Z82 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=52105">Preview</a><br/>Thesis (Ph.D (Kejuruteraan Elektrik)) - Universiti Teknologi Malaysia, 2007<br/>Nature of delay in nominated subcontractingent://SD_ILS/0/SD_ILS:1553032024-05-24T10:49:41Z2024-05-24T10:49:41Zby Md. Asrul Nasid Masrom<br/>Author Md. Asrul Nasid Masrom<br/>Format: Books<br/>Call Number TA210 M37 2007<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=43231">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/>The development of knowledge sharing culture in the construction industryent://SD_ILS/0/SD_ILS:1559832024-05-24T10:49:41Z2024-05-24T10:49:41Zby Low, Lisa Seow Wei<br/>Author Low, Lisa Seow Wei<br/>Format: Books<br/>Call Number T58.6 L68 2007 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2007<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=48875">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Fasiliti)) - Universiti Teknologi Malaysia, 2007<br/>