Search Results for Construction projects -- Management - Narrowed by: English - Roads -- Design and constructionSirsiDynix Enterprisehttp://portal.utm.my/client/en_AU/main/main/qu$003dConstruction$002bprojects$002b--$002bManagement$0026qf$003dLANGUAGE$002509Language$002509ENG$002509English$0026qf$003dSUBJECT$002509Subject$002509Roads$002b--$002bDesign$002band$002bconstruction$002509Roads$002b--$002bDesign$002band$002bconstruction$0026ic$003dtrue$0026ps$003d300?dt=list2024-07-03T04:46:33ZMANAGEMENT FRAMEWORK TO REDUCE DELAYS IN ROAD CONSTRUCTION PROJECTS IN SUDANent://SD_ILS/0/SD_ILS:8710002024-07-03T04:46:33Z2024-07-03T04:46:33Zby Khalid Mohamed Khair Mohamed, 1969-, author<br/>Author Khalid Mohamed Khair Mohamed, 1969-, author, Zainai Mohamed, Prof Emeritus, Dato'., supervisor, Roslina Mohammad, Dr., supervisor, Sekolah Razak UTM Dalam Kejuruteraan dan Teknologi Termaju<br/>Format: Books<br/>Call Number TE175 K43 2017 raf<br/>Thesis (Doktor Kejuruteraan (Pengurusan Perniagaan Kejuruteraan)) - Universiti Teknologi Malaysia, 2017<br/>MANAGEMENT FRAMEWORK TO REDUCE DELAYS IN ROAD CONSTRUCTION PROJECTS IN SUDANent://SD_ILS/0/SD_ILS:8722162024-07-03T04:46:33Z2024-07-03T04:46:33Zby Khalid Mohamed Khair Mohamed, 1969-, author<br/>Author Khalid Mohamed Khair Mohamed, 1969-, author, Zainai Mohamed, Prof Emeritus, Dato'., supervisor, Roslina Mohammad, Dr., supervisor, Sekolah Razak UTM Dalam Kejuruteraan dan Teknologi Termaju<br/>Format: Books<br/>Call Number CP 064098 ra<br/>Thesis (Doktor Kejuruteraan (Pengurusan Perniagaan Kejuruteraan)) - Universiti Teknologi Malaysia, 2017<br/>The challenges faced by government contractors in managing the flyover projectsent://SD_ILS/0/SD_ILS:8528732024-07-03T04:46:33Z2024-07-03T04:46:33Zby Lutfi Kurniawan, 1982- author<br/>Author Lutfi Kurniawan, 1982- author, Fadhlin Abdullah, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TE175 L88 2015 raf<br/>Publication Date 2016 2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>The challenges faced by covernment contractors in managing the flyover projectsent://SD_ILS/0/SD_ILS:8528762024-07-03T04:46:33Z2024-07-03T04:46:33Zby Lutfi Kurniawan, 1982- author<br/>Author Lutfi Kurniawan, 1982- author<br/>Format: Books<br/>Call Number CP 056268 ra<br/>Publication Date 2016 2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>Performance-based contracts for road projects : comparative analysis of different typesent://SD_ILS/0/SD_ILS:8346272024-07-03T04:46:33Z2024-07-03T04:46:33Zby Gajurel, Ashish, author<br/>Author Gajurel, Ashish, author<br/>Format: Books<br/>Call Number TE175 G35 2014<br/>Publisher Springer,<br/>Publication Date 2014<br/>ISBN 9788132213017<br/>A study on identifying factors affecting project performance on road construction projectent://SD_ILS/0/SD_ILS:7999592024-07-03T04:46:33Z2024-07-03T04:46:33Zby Mohamad Taufik, 1979-<br/>Author Mohamad Taufik, 1979-<br/>Format: Books<br/>Call Number CP 030613 ra<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>A study on identifying factors affecting project performance on road construction projectent://SD_ILS/0/SD_ILS:7999472024-07-03T04:46:33Z2024-07-03T04:46:33Zby Mohamad Taufik, 1979-<br/>Author Mohamad Taufik, 1979-, Ahmad Rosdan Abdul Razak, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 M649 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>