Search Results for Design - Narrowed by: Buildings -- Design and construction SirsiDynix Enterprise http://portal.utm.my/client/en_AU/main/main/qu$003dDesign$0026qf$003dSUBJECT$002509Subject$002509Buildings$002b--$002bDesign$002band$002bconstruction$002509Buildings$002b--$002bDesign$002band$002bconstruction$0026ic$003dtrue$0026ps$003d300?dt=list 2024-05-25T15:09:24Z Design phase constructability assessment model ent://SD_ILS/0/SD_ILS:610744 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Rosli Mohamad Zin<br/>Author&#160;Rosli Mohamad Zin<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 10650<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Thesis (Doktor Falsafah (Kejuruteraan Awam) -Universiti Teknologi Malaysia, 2004<br/> Design phase constructability assessment model ent://SD_ILS/0/SD_ILS:438067 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Rosli Mohamad Zin<br/>Author&#160;Rosli Mohamad Zin<br/>Format:&#160;Books<br/>Call Number&#160;TH153 R67 2004<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=41330">Preview</a><br/>Thesis (Doktor Falsafah (Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2004<br/> Incorporating sustainable concept to improve architectural design ent://SD_ILS/0/SD_ILS:234244 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ahmad Mawardi Mohd. Zainal<br/>Author&#160;Ahmad Mawardi Mohd. Zainal<br/>Format:&#160;Books<br/>Call Number&#160;TH845 A42 2008<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Incorporating sustainable concept to improve architectural design ent://SD_ILS/0/SD_ILS:580575 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ahmad Mawardi Mohd. Zainal<br/>Author&#160;Ahmad Mawardi Mohd. Zainal<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 015054<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008<br/> Integrating design and construction : a new approach ent://SD_ILS/0/SD_ILS:135725 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Che Wan Fadhil Che Wan Putra<br/>Author&#160;Che Wan Fadhil Che Wan Putra,&#160;Mustafa Alshawi,&#160;International Symposium on Automation and Robotics in Construction (17th : 2000 : Taipei, Taiwan)<br/>Format:&#160;Books<br/>Call Number&#160;TH2025 C82 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/> A framework for an operational process based internet collaboration platform for interdisciplinary building design ent://SD_ILS/0/SD_ILS:789938 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abdul Halim Hussein, 1960-<br/>Author&#160;Abdul Halim Hussein, 1960-,&#160;Mohd. Rashid Embi, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;NA2750 A24 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Ph.D (Senibina)) - Universiti Teknologi Malaysia, 2012<br/> Achieving collaborative working environment using design and build platform ent://SD_ILS/0/SD_ILS:775922 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Chew, Choy San, 1981-<br/>Author&#160;Chew, Choy San, 1981-,&#160;Mohamad Ibrahim Mohamad, supervisor,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH438 C44 2012 raf<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2012<br/> Achieving collaborative working environment using design and build platform ent://SD_ILS/0/SD_ILS:778441 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Chew, Choy San, 1981-<br/>Author&#160;Chew, Choy San, 1981-<br/>Format:&#160;Books<br/>Call Number&#160;CP 028403 ra<br/>Publication Date&#160;2012<br/>Thesis (Sarjana Sains Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2012<br/> A framework for an operational process based internet collaboration platform for interdisciplinary building design ent://SD_ILS/0/SD_ILS:791112 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abdul Halim Hussein, 1960-<br/>Author&#160;Abdul Halim Hussein, 1960-,&#160;Mohd. Rashid Embi, supervisor<br/>Format:&#160;Books<br/>Call Number&#160;CP 027793 ra<br/>Publication Date&#160;2012<br/>Thesis (Ph.D (Senibina)) - Universiti Teknologi Malaysia, 2012<br/> A case study on the management of UTM new hostel based on design and build arrangement ent://SD_ILS/0/SD_ILS:611297 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Nurul Hidayati Mohamed<br/>Author&#160;Nurul Hidayati Mohamed<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 11343<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> A case study on the management of UTM new hostel based on design and build arrangement ent://SD_ILS/0/SD_ILS:447384 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Nurul Hidayati Mohamed<br/>Author&#160;Nurul Hidayati Mohamed<br/>Format:&#160;Books<br/>Call Number&#160;HD9715.M32 N87 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=40006">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> The implementation of design and build procurement approach in local construction industry ent://SD_ILS/0/SD_ILS:363852 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Pang, Sheh Haur<br/>Author&#160;Pang, Sheh Haur<br/>Format:&#160;Books<br/>Call Number&#160;TH425 P36 2004<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=52091">Preview</a><br/>Thesis (Master of Engineering (Civil - Construction and Management)) - Universiti Teknologi Malaysia, 2004<br/> The implementation of design and build procurement approach in local construction industry ent://SD_ILS/0/SD_ILS:598172 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Pang, Sheh Haur<br/>Author&#160;Pang, Sheh Haur<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 8858<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Thesis (Master of Engineering (Civil - Construction and Management)) - Universiti Teknologi Malaysia, 2004<br/> Finite element design of concrete structures : practical problems and their solutions ent://SD_ILS/0/SD_ILS:416186 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Rombach, G.A. (Guenter Axel)<br/>Author&#160;Rombach, G.A. (Guenter Axel)<br/>Format:&#160;Books<br/>Call Number&#160;TA681.5 R65 2004<br/>Publisher&#160;Thomas Telford,<br/>Publication Date&#160;2004<br/>ISBN&#160;9780727732743<br/> Building space analysis for integrating design and construction ent://SD_ILS/0/SD_ILS:135835 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Che Wan Fadhil Che Wan Putra<br/>Author&#160;Che Wan Fadhil Che Wan Putra,&#160;Mustafa Alshawi,&#160;International Conference on Construction Information Technology (2000 : Reykjavik, Iceland)<br/>Format:&#160;Books<br/>Call Number&#160;TH2025 C83 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/> Post-tension column for IBS blockwork building system ent://SD_ILS/0/SD_ILS:800341 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Zalilah Ayop, 1989-<br/>Author&#160;Zalilah Ayop, 1989-,&#160;Abdul Kadir Marsono,&#160;Fakulti Kejuruteraan Awam<br/>Format:&#160;Books<br/>Call Number&#160;TH1491 Z35 2013 raf<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Kejuruteraan (Awam - Struktur)) - Universiti Teknologi Malaysia, 2013<br/>This title is Open Access thesis starting from 21/1/2018<br/> Post-tension column for IBS blockwork building system ent://SD_ILS/0/SD_ILS:802151 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Zalilah Ayop, 1989-<br/>Author&#160;Zalilah Ayop, 1989-<br/>Format:&#160;Books<br/>Call Number&#160;CP 029488 ra<br/>Publication Date&#160;2013<br/>Thesis (Sarjana Kejuruteraan (Awam - Struktur)) - Universiti Teknologi Malaysia, 2013<br/>This title is Open Access thesis starting from 21/1/2018<br/> Reka bentuk seni bina barat kurun ke-19 : wacana moral ent://SD_ILS/0/SD_ILS:816907 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohamad Tajuddin Mohamad Rasdi, 1962-<br/>Author&#160;Mohamad Tajuddin Mohamad Rasdi, 1962-,&#160;Rosdan Abdul Manan, 1972-<br/>Format:&#160;Books<br/>Call Number&#160;NA642 M64 2012<br/>Publisher&#160;Dewan Bahasa Dan Pustaka,<br/>Publication Date&#160;2012<br/>ISBN&#160;9789834606749<br/> Dokumen Kontrak : bagi membekal, memasang, mengujiterima dan mentauliah pemasangan kebuk wasap makmal (Laboratory Fume Cupboards) serta kerja-kerja berkaitan untuk cadangan membina dan menyiapkan Bangunan Tambahan Fakulti Sains (RMKe-9) di Universiti Teknologi Malaysia, Skudai, Johor ent://SD_ILS/0/SD_ILS:779798 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;Universiti Teknologi Malaysia. Fakulti Sains,&#160;DTP Development Sdn. Bhd,&#160;Kejuruteraan Meera<br/>Format:&#160;Books<br/>Call Number&#160;DK 0027 ra<br/>Publication Date&#160;2011<br/> Pelaksanaan sistem pengurusan alam sekitar (ISO 14000) dalam proses rekabentuk bangunan ent://SD_ILS/0/SD_ILS:247437 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Yap, Chiaw Guan, 1985-<br/>Author&#160;Yap, Chiaw Guan, 1985-,&#160;Syamsul Hendra Mahmud, supervisor,&#160;Fakulti Alam Bina<br/>Format:&#160;Books<br/>Call Number&#160;TH438 Y364 2008 raf<br/>Publication Date&#160;2008<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2008<br/> Dokumen kontrak : cadangan membina dan menyiapkan bangunan tambahan Fakulti Kejuruteraan Kimia dan Kejuruteraan Sumber Asli (RMke-9) di Universiti Teknologi Malaysia Skudai, Johor ent://SD_ILS/0/SD_ILS:623996 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Universiti Teknologi Malaysia<br/>Author&#160;Universiti Teknologi Malaysia,&#160;Pembinaan Impian Sdn. Bhd<br/>Format:&#160;Books<br/>Call Number&#160;TH845 D64 2008 v.2<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/> Dokumen kontrak : cadangan membina dan menyiapkan bangunan tambahan Fakuliti Sains Komputer dan Sistem Maklumat (RMKe-9) di Universiti Teknologi Malaysia, Skudai, Johor ent://SD_ILS/0/SD_ILS:624001 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Universiti Teknologi Malaysia<br/>Author&#160;Universiti Teknologi Malaysia,&#160;Technochase Sdn. Bhd<br/>Format:&#160;Books<br/>Call Number&#160;TH845 D644 2008 v.1<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/> Dokumen kontrak : cadangan membina dan menyiapkan bangunan tambahan Fakulti Kejuruteraan Awam (RM ke-9) di Universiti Teknologi Malaysia, Johor ent://SD_ILS/0/SD_ILS:624002 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Universiti Teknologi Malaysia<br/>Author&#160;Universiti Teknologi Malaysia,&#160;GLR Builders Sdn. Bhd.<br/>Format:&#160;Books<br/>Call Number&#160;TH845 D645 2008 af v.1<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/> Dokumen kontrak : cadangan meroboh bangunan sedia ada dan membina semua bangunan Kolej Sains dan Teknologi (Parcel B) yang mengandungi bangunan menara 10 tingkat, dewan kuliah dan seminar dan kerja-kerja yang berkaitan di atas sebahagian Lot 4582 (UTM) Jalan Semarak, Mukim Setapak, Wilayah Persekutuan, Kuala lumpur ent://SD_ILS/0/SD_ILS:624008 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina<br/>Author&#160;Universiti Teknologi Malaysia. Pejabat Harta Bina,&#160;Universiti Teknologi Malaysia,&#160;GTS Contractor Sdn. Bhd<br/>Format:&#160;Books<br/>Call Number&#160;TH845 D32 2008 v.1<br/>Publication Date&#160;2008<br/> Dokumen kontrak : cadangan membina dan menyiapkan bangunan tambahan Fakulti Kejuruteraan Elektrik (RMKe-9) di Universiti Teknologi Malaysia, Skudai, Johor Darul Takzim ent://SD_ILS/0/SD_ILS:624011 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Universiti Teknologi Malaysia<br/>Author&#160;Universiti Teknologi Malaysia,&#160;Bandi Bina Sdn. Bhd<br/>Format:&#160;Books<br/>Call Number&#160;TH845 D56 2008 v.1<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2008<br/> The privatization projects implemented by ministry of defence ent://SD_ILS/0/SD_ILS:138065 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abdul Rahman Ibrahim<br/>Author&#160;Abdul Rahman Ibrahim<br/>Format:&#160;Books<br/>Call Number&#160;TA113.M32 A72 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=48840">Preview</a><br/>Thesis (Sarjana sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> The privatization projects implemented by ministry of defence ent://SD_ILS/0/SD_ILS:566625 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abdul Rahman Ibrahim<br/>Author&#160;Abdul Rahman Ibrahim<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 015090 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Variation control affecting construction works for Lembaga Kemajuan Persekutuan (FELDA) ent://SD_ILS/0/SD_ILS:566627 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Nurul Uyun Mohd. Yunus<br/>Author&#160;Nurul Uyun Mohd. Yunus<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 015091<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/>Thesis (Sarjana Sains (Pengurusan Pembangunan)) - Universiti Teknologi Malaysia, 2007<br/> Variation control affecting construction works for Lembaga Kemajuan Persekutuan (FELDA) ent://SD_ILS/0/SD_ILS:138075 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Nurul Uyun Mohd. Yunus<br/>Author&#160;Nurul Uyun Mohd. Yunus<br/>Format:&#160;Books<br/>Call Number&#160;TH438 N89 2007<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2007<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=48842">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2007<br/> Kebolehbinaan : masalah-masalah berkaitan perincian rekabentuk ent://SD_ILS/0/SD_ILS:113466 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abd. Rahman Othman<br/>Author&#160;Abd. Rahman Othman<br/>Format:&#160;Books<br/>Call Number&#160;TH153 A72 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/> Masalah pada pembinaan masonry ent://SD_ILS/0/SD_ILS:113521 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ridhwan Hadzeri<br/>Author&#160;Ridhwan Hadzeri<br/>Format:&#160;Books<br/>Call Number&#160;TH5311 R52 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=59768">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/> Development of static designs program for concrete building ent://SD_ILS/0/SD_ILS:620217 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Sahferi Mohamed Isa<br/>Author&#160;Sahferi Mohamed Isa<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 7730<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/> Kebolehbinaan masalah-masalah berkaitan perincian rekabentuk ent://SD_ILS/0/SD_ILS:562913 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abd. Rahman Othman<br/>Author&#160;Abd. Rahman Othman<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 8105<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/> Masalah pada pembinaan masonry ent://SD_ILS/0/SD_ILS:562922 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ridhwan Hadzeri<br/>Author&#160;Ridhwan Hadzeri<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 8108<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/> Profil projek pembinaan terbengkalai di negeri Sabah ent://SD_ILS/0/SD_ILS:471883 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Asniah Abidin<br/>Author&#160;Asniah Abidin<br/>Format:&#160;Books<br/>Call Number&#160;TH438 A86 2006 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> Profil projek pembinaan terbengkalai di negeri Sabah ent://SD_ILS/0/SD_ILS:9154 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Asniah Abidin<br/>Author&#160;Asniah Abidin<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13631<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2006<br/> Development of static designs program for concrete building ent://SD_ILS/0/SD_ILS:483637 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Sahferi Mohamed Isa<br/>Author&#160;Sahferi Mohamed Isa<br/>Format:&#160;Books<br/>Call Number&#160;TH1095 S23 2006<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2006<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=59759">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/> Faktor kejayaan kaedah reka dan bina : kajian terhadap kontraktor kerjasama ent://SD_ILS/0/SD_ILS:611286 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Omar Md. Ludin<br/>Author&#160;Omar Md. Ludin<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 11352<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> Analisa implikasi arahan perubahan kerja terhadap kos perbezaan antara kaedah tradisional dengan reka dan bina ent://SD_ILS/0/SD_ILS:614237 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ahmad Firdaus Mohamad<br/>Author&#160;Ahmad Firdaus Mohamad<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 7690<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> Kajian kesan penggunaan teknologi pembinaan dalam mempercepatkan projek perumahan di Malaysia ent://SD_ILS/0/SD_ILS:612042 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Feroz Hanif Mohamed Ahmad<br/>Author&#160;Feroz Hanif Mohamed Ahmad<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 7750<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/> Faktor kejayaan kaedah reka dan bina : kajian terhadap kontraktor kerjasama ent://SD_ILS/0/SD_ILS:447336 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Omar Md. Ludin<br/>Author&#160;Omar Md. Ludin<br/>Format:&#160;Books<br/>Call Number&#160;TH438 O434 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=40373">Preview</a><br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> Kajian kesan penggunaan teknologi pembinaan dalam mempercepatkan projek perumahan di Malaysia ent://SD_ILS/0/SD_ILS:451668 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Feroz Hanif Mohamed Ahmad<br/>Author&#160;Feroz Hanif Mohamed Ahmad<br/>Format:&#160;Books<br/>Call Number&#160;TH153 F47 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2005<br/> Analisa implikasi arahan perubahan kerja terhadap kos : perbezaan antara kaedah tradisional dengan reka dan bina ent://SD_ILS/0/SD_ILS:457658 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ahmad Firdaus Mohamad<br/>Author&#160;Ahmad Firdaus Mohamad<br/>Format:&#160;Books<br/>Call Number&#160;TH438 A37 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=68510">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2005<br/> Pelaksanaan projek reka dan bina dari persepsi pihak klien, kontraktor dan perunding ent://SD_ILS/0/SD_ILS:411976 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Norshimah Meon<br/>Author&#160;Norshimah Meon<br/>Format:&#160;Books<br/>Call Number&#160;TH153 N67 2005<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Thesis (Sarjana Sains (Pengurusan Fasiliti)) - Universiti Teknologi Malaysia, 2005<br/> Analisa implikasi arahan perubahan kerja terhadap kos : perbezaan antara kaedah tradisional dengan reka dan bina ent://SD_ILS/0/SD_ILS:8990 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ahmad Firdaus Mohamad<br/>Author&#160;Ahmad Firdaus Mohamad<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 13621<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2005<br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan) - Universiti Teknologi Malaysia, 2005<br/> Penganggaran kadaralir puncak kawasan tadahan kecil tanpa cerap kaedah UH sintetik dan rational (MASMA) ent://SD_ILS/0/SD_ILS:8012 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Adeli Nawi<br/>Author&#160;Adeli Nawi<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12975<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2004<br/> Perbandingan secara sistem konvensional dan sistem kerangka keluli - satu kajian kes ent://SD_ILS/0/SD_ILS:605247 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Goh, Pey Shan<br/>Author&#160;Goh, Pey Shan<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 5324<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2004<br/> Perbandingan secara sistem konvensional dan sistem kerangka keluli - satu kajian kes ent://SD_ILS/0/SD_ILS:406464 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Goh, Pey Shan<br/>Author&#160;Goh, Pey Shan<br/>Format:&#160;Books<br/>Call Number&#160;TH153 G63 2004<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2004<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=64847">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2004<br/> Analisis dan penerbitan jadual-jadual reka bentuk anggota rembatan bangunan industri ent://SD_ILS/0/SD_ILS:21376 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Choo, Chiang Khiang<br/>Author&#160;Choo, Chiang Khiang<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12350<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Pengaruh kadar campuran dan nisbah air-simen terhadap konkrit ringan tanpa halus ent://SD_ILS/0/SD_ILS:21702 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohd. Rohaizal Musa<br/>Author&#160;Mohd. Rohaizal Musa<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12565<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Perbandingan pembinaan secara konvensional dan sistem acuan tunnel : satu kajian kes ent://SD_ILS/0/SD_ILS:599190 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Tay, Hock Seng<br/>Author&#160;Tay, Hock Seng<br/>Format:&#160;Computer file<br/>Call Number&#160;CP 2978<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Analisis dan penerbitan jadual-jadual reka bentuk anggota rembatan bangunan industri ent://SD_ILS/0/SD_ILS:347121 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Choo, Chiang Khiang<br/>Author&#160;Choo, Chiang Khiang<br/>Format:&#160;Books<br/>Call Number&#160;TH153 C47 2003<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Perbandingan pembinaan secara konvensional dan sistem acuan tunnel : satu kajian kes ent://SD_ILS/0/SD_ILS:366263 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Tay, Hock Seng<br/>Author&#160;Tay, Hock Seng<br/>Format:&#160;Books<br/>Call Number&#160;TH153 T39 2003<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=63255">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Kaedah perolehan rekabentuk dan bina ent://SD_ILS/0/SD_ILS:347725 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Lim, Lee Wee<br/>Author&#160;Lim, Lee Wee<br/>Format:&#160;Books<br/>Call Number&#160;TH153 L55 2003<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2003<br/> Testing in water distribution system ent://SD_ILS/0/SD_ILS:21012 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Lee, Swee Yong<br/>Author&#160;Lee, Swee Yong<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12138<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2003<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2003<br/> Penyelidikan prestasi sambungan dalam binaan berindustri (Industrialized Construction) ent://SD_ILS/0/SD_ILS:17251 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Cheong, Ju Leong<br/>Author&#160;Cheong, Ju Leong<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11491<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Kualiti dalam pembinaan bangunan ent://SD_ILS/0/SD_ILS:17296 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Muhammad Mirzan Ishak<br/>Author&#160;Muhammad Mirzan Ishak<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11480<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Rayapan plastik bertetulang gentian kaca (GFRP) terhadap beban mampatan ent://SD_ILS/0/SD_ILS:19631 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Lee, Yih Hau<br/>Author&#160;Lee, Yih Hau<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11452<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Kajian terhadap faktor pemilihan dan prosedur kerja asas cerucuk ent://SD_ILS/0/SD_ILS:19633 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Kho, Tian Chyi<br/>Author&#160;Kho, Tian Chyi<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11463 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Kajian ke atas faktor-faktor yang mempengaruhi penentuan harga lot tanah perkuburan di taman peringatan ent://SD_ILS/0/SD_ILS:21500 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Choong, Kim Chuan<br/>Author&#160;Choong, Kim Chuan<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12369<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Sains (Pengurusan Harta Tanah)) - Universiti Teknologi Malaysia, 2002<br/> Kaedah perhitungan masa dan peruntukan sumber manusia oleh sub-kontraktor dalam projek binaan ent://SD_ILS/0/SD_ILS:113389 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Navamani Anthonisami<br/>Author&#160;Navamani Anthonisami<br/>Format:&#160;Books<br/>Call Number&#160;TH438 N38 2002 raf<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2002<br/> Pembinaan berelektronik : pembangunan pengurusan dan pengawasan projek secara masa benar dalam industri pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:591183 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Omar Abd Kudus<br/>Author&#160;Omar Abd Kudus<br/>Format:&#160;Computer file<br/>Call Number&#160;DSK 1920<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/> Bon dalam pengurusan risiko projek pembinaan di Malaysia : kajian terhadap kontraktor ent://SD_ILS/0/SD_ILS:306254 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Hasnol Wakiran<br/>Author&#160;Hasnol Wakiran<br/>Format:&#160;Books<br/>Call Number&#160;TH438 H376 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Sistem perolehan rekabentuk dan bina bagi projek binaan ent://SD_ILS/0/SD_ILS:307885 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Marlia Osman<br/>Author&#160;Marlia Osman<br/>Format:&#160;Books<br/>Call Number&#160;TH153 M37 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2002<br/> Aplikasi konsep pengurusan Just-In-Time dalam industri pembinaan ent://SD_ILS/0/SD_ILS:308046 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Lee, Kiang Yen<br/>Author&#160;Lee, Kiang Yen<br/>Format:&#160;Books<br/>Call Number&#160;TH153 L43 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Kualiti dalam pembinaan bangunan ent://SD_ILS/0/SD_ILS:308189 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Muhammad Mirzan Ishak<br/>Author&#160;Muhammad Mirzan Ishak<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M54 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Satu kajian kes : ujian kimia ke atas lepaan di kawasan perumahan sekitar UTM ent://SD_ILS/0/SD_ILS:308213 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ooi, Choy Hoong<br/>Author&#160;Ooi, Choy Hoong<br/>Format:&#160;Books<br/>Call Number&#160;TH4818.P53 O64 2002<br/>Publisher&#160;Universiti Teknologoi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Rekabentuk tiang keluli dengan menggunakan Microsoft Visual Basic 6.0 ent://SD_ILS/0/SD_ILS:308269 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Tan, Mee Yean<br/>Author&#160;Tan, Mee Yean<br/>Format:&#160;Books<br/>Call Number&#160;TH4818.S73 T36 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Satu kajian kes : ujian kimia ke atas lepaan di kawasan perumahan sekitar UTM ent://SD_ILS/0/SD_ILS:308318 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;You, Li Fah<br/>Author&#160;You, Li Fah<br/>Format:&#160;Books<br/>Call Number&#160;TH4818.P53 Y68 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Kajian projek terbengkalai sekitar Negeri Johor ent://SD_ILS/0/SD_ILS:325716 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Norhanisam Mat Saman<br/>Author&#160;Norhanisam Mat Saman<br/>Format:&#160;Books<br/>Call Number&#160;TH438 N43 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Pembinaan berelektronik : pembangunan pengurusan dan pengawasan projek secara masa benar dalam industri pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:326581 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Omar Abd Kudus<br/>Author&#160;Omar Abd Kudus<br/>Format:&#160;Books<br/>Call Number&#160;TH438 O44 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Penyelidikan prestasi sambungan dalam binaan berindustri (Industrialized Construction) ent://SD_ILS/0/SD_ILS:307007 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Cheong, Ju Leong<br/>Author&#160;Cheong, Ju Leong<br/>Format:&#160;Books<br/>Call Number&#160;TA660.J64 C43 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Kaedah reka dan bina ent://SD_ILS/0/SD_ILS:307376 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohd. Riduwan Nor<br/>Author&#160;Mohd. Riduwan Nor<br/>Format:&#160;Books<br/>Call Number&#160;TH153 M74 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Sistem koordinasi modular : perkembangan dan cabaran dalam industri pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:308183 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Norizal Rosli<br/>Author&#160;Norizal Rosli<br/>Format:&#160;Books<br/>Call Number&#160;TH860 N67 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Analisis penambahan bangunan sedia ada ent://SD_ILS/0/SD_ILS:308265 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Tan, Lee Lian<br/>Author&#160;Tan, Lee Lian<br/>Format:&#160;Books<br/>Call Number&#160;TH153 T36 2002<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Aplikasi konsep pengurusan Just-In-Time dalam industri pembinaan ent://SD_ILS/0/SD_ILS:16249 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Lee, Kiang Yen<br/>Author&#160;Lee, Kiang Yen<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11513<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Ujian tanpa musnah dalam penilaian keupayaan struktur ent://SD_ILS/0/SD_ILS:17305 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Leong, Kok Hoe<br/>Author&#160;Leong, Kok Hoe<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11561<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Kajian penggunaan kod amalan dalam rekabentuk struktur di Malaysia ent://SD_ILS/0/SD_ILS:17243 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Au, Yong Boon<br/>Author&#160;Au, Yong Boon<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11481<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Pemantauan kemajuan kerja menggunakan kaedah ukuran masa ent://SD_ILS/0/SD_ILS:18611 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Azahan Ali<br/>Author&#160;Azahan Ali<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Kriteria pemilihan cerucuk di Malaysia ent://SD_ILS/0/SD_ILS:21002 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Alias Arshad<br/>Author&#160;Alias Arshad<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 12132<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2002<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2002<br/> Kesan projek terbengkalai terhadap industri pembangunan ent://SD_ILS/0/SD_ILS:16080 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Gan, Seng Kian<br/>Author&#160;Gan, Seng Kian<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11019<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Pengaruh rekabentuk jalan raya terhadap kemalangan ent://SD_ILS/0/SD_ILS:16417 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Jamsari Ali<br/>Author&#160;Jamsari Ali<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11041<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Rekabentuk tiang keluli dengan menggunakan kaedah separa tegar ent://SD_ILS/0/SD_ILS:16522 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ahmad Syafawy Mohd. Samuri<br/>Author&#160;Ahmad Syafawy Mohd. Samuri<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10875<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Struktur konkrit pratuang : kajian kes di negeri Selangor ent://SD_ILS/0/SD_ILS:16543 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ismail Ibrahim<br/>Author&#160;Ismail Ibrahim<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11183<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Pertalian di antara aliran sungai dan pemendapan tanah gambut ent://SD_ILS/0/SD_ILS:17094 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Azri Md. Akib<br/>Author&#160;Azri Md. Akib<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10928<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Kajian kaedah perancangan projek pembinaan bangunan sekolah di Daerah Hulu Langat ent://SD_ILS/0/SD_ILS:17255 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abd. Razak Abd. Samad<br/>Author&#160;Abd. Razak Abd. Samad<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11472<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Risiko projek pembinaan - perpindahan melalui kaedah pengendalian kontrak ent://SD_ILS/0/SD_ILS:160962 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ahmad Fitri Md. Noor<br/>Author&#160;Ahmad Fitri Md. Noor<br/>Format:&#160;Books<br/>Call Number&#160;TH145 A37 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia/ATMA, 2001<br/> Pembinaan berelektronik : pembangunan pengurusan dan pengawasan projek secara masa benar dalam industri pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:161809 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Hoo, Swee Loon<br/>Author&#160;Hoo, Swee Loon<br/>Format:&#160;Books<br/>Call Number&#160;TH438 H68 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2001<br/> Kesan projek terbengkalai terhadap industri pembangunan ent://SD_ILS/0/SD_ILS:161834 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Gan, Seng Kian<br/>Author&#160;Gan, Seng Kian<br/>Format:&#160;Books<br/>Call Number&#160;TH438 G37 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Kesan projek terbengkalai terhadap industri pembangunan ent://SD_ILS/0/SD_ILS:161860 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Kong, Kin Meng<br/>Author&#160;Kong, Kin Meng<br/>Format:&#160;Books<br/>Call Number&#160;TH438 K66 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Kajian kes pembinaan bangunan menggunakan teknik konkrit pra - tuang ent://SD_ILS/0/SD_ILS:161592 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Idawati Ismail<br/>Author&#160;Idawati Ismail<br/>Format:&#160;Books<br/>Call Number&#160;TH4818.P7 I33 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> E-commerce in construction ent://SD_ILS/0/SD_ILS:161794 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Hoo, Sze Yen<br/>Author&#160;Hoo, Sze Yen<br/>Format:&#160;Books<br/>Call Number&#160;TH438 H67 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2001<br/> Pengaplikasian falsafah just in time (JIT) ke dalam industri pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:162059 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Liang, Fook Hong<br/>Author&#160;Liang, Fook Hong<br/>Format:&#160;Books<br/>Call Number&#160;TH438 L54 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Kajian terhadap proses kelulusan pelan pembangunan projek oleh pihak berkuasa tempatan ent://SD_ILS/0/SD_ILS:162119 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mazlan Mohd. Said<br/>Author&#160;Mazlan Mohd. Said<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M39 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Pengurusan berkesan dalam perlaksanaan projek pembangunan Polis Di Raja Malaysia ent://SD_ILS/0/SD_ILS:162325 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohd. Yusoff Mamat<br/>Author&#160;Mohd. Yusoff Mamat<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M98 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Penggunaan konkrit kekuatan tinggi di bangunan-bangunan pencakar langit di sekitar Kuala Lumpur ent://SD_ILS/0/SD_ILS:162528 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Norazam Taib<br/>Author&#160;Norazam Taib<br/>Format:&#160;Books<br/>Call Number&#160;TH1461 N67 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Perisian pengurusan dalam pengurusan pembinaan ent://SD_ILS/0/SD_ILS:162551 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ong, Wen How<br/>Author&#160;Ong, Wen How<br/>Format:&#160;Books<br/>Call Number&#160;TH438 O54 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Pengaplikasian falsafah pengurusan sektor pengeluaran Jepun ke dalam sektor pembinaan : kaedah kanban ent://SD_ILS/0/SD_ILS:163009 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Tetty Irma Abdul Shokri<br/>Author&#160;Tetty Irma Abdul Shokri<br/>Format:&#160;Books<br/>Call Number&#160;TH438 T47 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Rekabentuk tiang keluli dengan menggunakan kaedah separa tegar ent://SD_ILS/0/SD_ILS:300151 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ahmad Syafawy Mohd. Samuri<br/>Author&#160;Ahmad Syafawy Mohd. Samuri<br/>Format:&#160;Books<br/>Call Number&#160;TA683.5.C7 A35 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Kaedah koordinasi modular di dalam industri pembinaan ent://SD_ILS/0/SD_ILS:300580 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Siti Maizatul Harmi Mohd. Taserip<br/>Author&#160;Siti Maizatul Harmi Mohd. Taserip<br/>Format:&#160;Books<br/>Call Number&#160;TH860 S53 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Kesan keretakan dan kaedah baikpulih struktur konkrit ent://SD_ILS/0/SD_ILS:300336 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Khairey Anuar Johari<br/>Author&#160;Khairey Anuar Johari<br/>Format:&#160;Books<br/>Call Number&#160;TA656 K53 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Interlocking blockwork system for cost effective low and medium rise building = Sistem blok saling mengunci untuk bangunan rendah dan sederhana tinggi ent://SD_ILS/0/SD_ILS:350665 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abdul Karim Mirasa, 1953-<br/>Author&#160;Abdul Karim Mirasa, 1953-,&#160;Muhammad Syazli Fathi,&#160;Wan Nasruddin Wan Abdul Karim,&#160;Norazlin Nordin<br/>Format:&#160;Books<br/>Call Number&#160;TH1491 I58 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/> Kajian kaedah perancangan projek pembinaan bangunan sekolah di Daerah Hulu Langat ent://SD_ILS/0/SD_ILS:306726 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abd. Razak Abd. Samad<br/>Author&#160;Abd. Razak Abd. Samad<br/>Format:&#160;Books<br/>Call Number&#160;TH438 A73 2001<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Risiko projek pembinaan - perpindahan melalui kaedah pengendalian kontrak ent://SD_ILS/0/SD_ILS:15589 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ahmad Fitri Md. Noor<br/>Author&#160;Ahmad Fitri Md. Noor<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11417<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia /ATMA, 2001<br/> Analisis pintasan di dalam ladang getah : (hevea Braziliansis) - stemflow ent://SD_ILS/0/SD_ILS:15789 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Chong, Jenn Huei<br/>Author&#160;Chong, Jenn Huei<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11220<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Kajian penilaian kualiti air Sungai Tebrau ent://SD_ILS/0/SD_ILS:16291 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Kiing, Teck Yuing<br/>Author&#160;Kiing, Teck Yuing<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11012<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam (Alam Sekitar)) - Universiti Teknologi Malaysia, 2001<br/> Pembangunan sistem pengurusan alam sekitar bagi makmal kejuruteraan alam sekitar, Fakulti Kejuruteraan Awam (FKA), Universiti Teknologi Malaysia (UTM) ent://SD_ILS/0/SD_ILS:16361 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Chai, Ming Fong<br/>Author&#160;Chai, Ming Fong<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10365<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Kajian kelakunan sambungan sistem dinding blok konkrit saling mengunci dengan papak konkrit tuang di situ ent://SD_ILS/0/SD_ILS:16372 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Loh, Su Jun<br/>Author&#160;Loh, Su Jun<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11029<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Kajian kelakuan empangan di bawah kesan gempa bumi berkeamatan rendah ent://SD_ILS/0/SD_ILS:16376 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Armi Nizam Abdul Latif<br/>Author&#160;Armi Nizam Abdul Latif<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10815<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Pengurusan berkesan dalam perlaksanaan projek pembangunan Polis Di Raja Malaysia ent://SD_ILS/0/SD_ILS:16523 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohd. Yusoff Mamat<br/>Author&#160;Mohd. Yusoff Mamat<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10822<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Kajian pengangkutan barangan di Malaysia : (kajian kes di Johor Darul Takzim) ent://SD_ILS/0/SD_ILS:17059 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ahmad Zaki Che Ismail<br/>Author&#160;Ahmad Zaki Che Ismail<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10903<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Pengurusan pengangkutan awam (bas) di luar bandar : kajian kes : Ketereh, Kelantan ent://SD_ILS/0/SD_ILS:17084 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Fadhlan Abdul Hadi<br/>Author&#160;Fadhlan Abdul Hadi<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11015<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Mengindutrialisasikan sektor binaan : penggunaan struktur keluli sebagai alternatif kepada konkrit bertetulang ent://SD_ILS/0/SD_ILS:17103 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Koh, John Seng Ern<br/>Author&#160;Koh, John Seng Ern<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10906<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Pergerakan tompokan minyak di permukaan air saluran terbuka segi empat ent://SD_ILS/0/SD_ILS:17130 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Hamimah Samsuri<br/>Author&#160;Hamimah Samsuri<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11016<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2001<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2001<br/> Penilaian semula rekabentuk kolam penstabilan sisa ent://SD_ILS/0/SD_ILS:15833 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Khairul Rizal Zulkafli<br/>Author&#160;Khairul Rizal Zulkafli<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10786<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Penilaian kebolehbinaan : kajian kes ent://SD_ILS/0/SD_ILS:15980 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Faizul Ideris<br/>Author&#160;Faizul Ideris<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10770<br/>Publisher&#160;Universiti Teknologi Malaysia<br/>Publication Date&#160;2000<br/>Project Paper (Sarjan Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Penggunaan lengkung air tanah bagi penentuan keseimbangan air bagi aplikasi rekabentuk penutup mutakhir tapak pelupusan sisa ent://SD_ILS/0/SD_ILS:16060 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Julian Joseph Xavier<br/>Author&#160;Julian Joseph Xavier<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10877<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Perlaksanaan dan pematuhan mengikut akta keselamatan dan kesihatan pekerjaan dan peraturan kilang dan jentera (operasi bangunan dan kerja-kerja pembinaan) (keselamatan) 1986 ent://SD_ILS/0/SD_ILS:16340 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Azman Umar<br/>Author&#160;Azman Umar<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10771<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Kajian sistem saliran (1) di Universiti Teknologi Malaysia kampus Skudai ent://SD_ILS/0/SD_ILS:16419 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ahmad Sujairi Md. Hasan<br/>Author&#160;Ahmad Sujairi Md. Hasan<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10813<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Kajian perbandingan antara struktur galas beban dan struktur berkerangka menggunakan dinding pra-tuang ent://SD_ILS/0/SD_ILS:154372 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Cheng, Kim Keong<br/>Author&#160;Cheng, Kim Keong<br/>Format:&#160;Books<br/>Call Number&#160;TH153 C43 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Penguatan dan pembaikpulihan struktur konkrit bertetulang dengan menggunakan kepingan polimer bertetulang gentian karbon (CFRP) ent://SD_ILS/0/SD_ILS:154416 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Chua, Hiok Siang<br/>Author&#160;Chua, Hiok Siang<br/>Format:&#160;Books<br/>Call Number&#160;TH1461 C59 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Penilaian kebolehbinaan : kajian kes ent://SD_ILS/0/SD_ILS:154990 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Faizul Ideris<br/>Author&#160;Faizul Ideris<br/>Format:&#160;Books<br/>Call Number&#160;TH145 F34 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Perlaksanaan dan pematuhan mengikut akta keselamatan dan kesihatan pekerjaan dan peraturan kilang dan jentera (operasi bangunan dan kerja-kerja pembinaan) (keselamatan) 1986 ent://SD_ILS/0/SD_ILS:156303 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Azman Umar<br/>Author&#160;Azman Umar<br/>Format:&#160;Books<br/>Call Number&#160;TA192 A96 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Peningkatan produktiviti dalam pembinaan ent://SD_ILS/0/SD_ILS:132457 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Razman Md. Darus<br/>Author&#160;Razman Md. Darus<br/>Format:&#160;Books<br/>Call Number&#160;TH153 R395 1998<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000&#160;1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/> Kursus binaan bangunan - modul 4 Program latihan untuk tahun 2000 ent://SD_ILS/0/SD_ILS:134098 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Institut Latihan dan Pendidikan Kembangan<br/>Author&#160;Institut Latihan dan Pendidikan Kembangan<br/>Format:&#160;Books<br/>Call Number&#160;TH165 K87<br/>Publisher&#160;[s.n.],<br/>Publication Date&#160;2000<br/> Pengurusan dokumen rekabentuk struktur dalam pembinaan bangunan konkrit bertetulang ent://SD_ILS/0/SD_ILS:145190 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mizi Hussin<br/>Author&#160;Mizi Hussin<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M59 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Pelan pengurusan risiko gempabumi di Lembah Kelang ent://SD_ILS/0/SD_ILS:153125 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Dilashini Karunanithi<br/>Author&#160;Dilashini Karunanithi<br/>Format:&#160;Books<br/>Call Number&#160;TA654.6 D54 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Penggunaan frp di dalam industri pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:153242 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohd. Rizal Abdul Rahim<br/>Author&#160;Mohd. Rizal Abdul Rahim<br/>Format:&#160;Books<br/>Call Number&#160;TA418.9.R4 M74 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Mengenalpasti keberkesanan penggunaan jadual di dalam projek pembinaan ent://SD_ILS/0/SD_ILS:153246 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohd. Ridzwan Bidin<br/>Author&#160;Mohd. Ridzwan Bidin<br/>Format:&#160;Books<br/>Call Number&#160;TH438.4 M74 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Rekabentuk bangunan tinggi tergantung : dinding riceh ent://SD_ILS/0/SD_ILS:153345 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Choo, Tze Kean<br/>Author&#160;Choo, Tze Kean<br/>Format:&#160;Books<br/>Call Number&#160;TH1611 C46 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Kajian kes terhadap pembinaan bersistem menggunakan acuan terowong ent://SD_ILS/0/SD_ILS:154230 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abdul Halid Salamon<br/>Author&#160;Abdul Halid Salamon<br/>Format:&#160;Books<br/>Call Number&#160;TA660.W3 A43 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Penyelenggaraan tiang bangunan rendah konkrit bertetulang akibat gempa bumi ent://SD_ILS/0/SD_ILS:154364 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Chew, Siew Jip<br/>Author&#160;Chew, Siew Jip<br/>Format:&#160;Books<br/>Call Number&#160;TA683.5.C7 C43 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Towards an open building system ent://SD_ILS/0/SD_ILS:144674 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;National Seminar on Industrialised Building System (2000 : Selangor)<br/>Author&#160;National Seminar on Industrialised Building System (2000 : Selangor)<br/>Format:&#160;Books<br/>Call Number&#160;TH1000 N37 2000 f<br/>Publication Date&#160;2000<br/> Penilaian struktur terbakar ent://SD_ILS/0/SD_ILS:144905 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Khairul Faizi Saim<br/>Author&#160;Khairul Faizi Saim<br/>Format:&#160;Books<br/>Call Number&#160;TA656 K54 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2000<br/> Kajian mengenai penilaian kebolehbinaan ent://SD_ILS/0/SD_ILS:145196 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohamad Sidek Ngdari<br/>Author&#160;Mohamad Sidek Ngdari<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M75 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Kajian penggunaaan perancah rangka tiub keluli di tapak bina (kajian kes : rekabentuk, pemasangan, kos dan aspek keselamatan di tapak bina) ent://SD_ILS/0/SD_ILS:145536 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohd. Hisham Sapuan<br/>Author&#160;Mohd. Hisham Sapuan<br/>Format:&#160;Books<br/>Call Number&#160;TH5281 M54 2000<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Kursus Asas Penggunaan Koordinasi Modular Dalam Industri Pembinaan, 23 Mac 2000, Hyatt Regency Hotel, Johor Bahru ent://SD_ILS/0/SD_ILS:301369 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Malaysia. Kementerian Kesejahteraan Bandar, Perumahan dan Kerajaan Tempatan. Jabatan Perumahan Negara<br/>Author&#160;Malaysia. Kementerian Kesejahteraan Bandar, Perumahan dan Kerajaan Tempatan. Jabatan Perumahan Negara,&#160;Lembaga Pembangunan Industri Pembinaan Malaysia<br/>Format:&#160;Books<br/>Call Number&#160;TH860 K88 2000<br/>Publisher&#160;s.n.],<br/>Publication Date&#160;2000<br/> Semakan rekabentuk jambatan konkrit segmen galang kekotak prategasan ent://SD_ILS/0/SD_ILS:15954 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abdul Halim Ramli<br/>Author&#160;Abdul Halim Ramli<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10764<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Pengurusan dokumen rekabentuk struktur dalam pembinaan bangunan konkrit bertetulang ent://SD_ILS/0/SD_ILS:16250 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mizi Hussin<br/>Author&#160;Mizi Hussin<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11165<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Rekabentuk bangunan tinggi tergantung : dinding riceh ent://SD_ILS/0/SD_ILS:16280 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Choo, Tze Kean<br/>Author&#160;Choo, Tze Kean<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10778<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Kajian kes terhadap pembinaan bersistem menggunakan acuan terowong ent://SD_ILS/0/SD_ILS:16284 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abdul Halid Salamon<br/>Author&#160;Abdul Halid Salamon<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11233<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Keberkesanan papan tanda di kampus Universiti Teknologi Malaysia,Skudai ent://SD_ILS/0/SD_ILS:16324 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Azahari Adnan<br/>Author&#160;Azahari Adnan<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10876<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Kertas Projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Prestasi bangunan keluli rendah (kilang) di bawah pengaruh beban gempa bumi ent://SD_ILS/0/SD_ILS:16336 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Hasanuddin Buyong<br/>Author&#160;Hasanuddin Buyong<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10347<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Pembaikan tanah menggunakan kaedah tiang batu ent://SD_ILS/0/SD_ILS:16754 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abd. Aziz Hussain<br/>Author&#160;Abd. Aziz Hussain<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10868<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Penggunaan karbon teraktif tekesa dalam penyingkiran bahan organik (alkly benzene sulfonate) ent://SD_ILS/0/SD_ILS:17112 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Azhar Ahmad @ Che Aat<br/>Author&#160;Azhar Ahmad @ Che Aat<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 11167<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;2000<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2000<br/> Struktur bangunan pada suhu tinggi ent://SD_ILS/0/SD_ILS:15841 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Kong, Khai Yean<br/>Author&#160;Kong, Khai Yean<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10809<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Kajian kes sistem kumbahan di kem-kem angkatan tentera Malaysia kawasan Kuala Lumpur dan Port Dickson ent://SD_ILS/0/SD_ILS:16195 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abu Almohtar Jaafar<br/>Author&#160;Abu Almohtar Jaafar<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10699<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Kajian pengurusan keselamatan pekerja tapak binaan projek di cadangan membina persimpangan bertingkat di Jalan Ampang / Jalan Tun Razak, Kuala Lumpur ent://SD_ILS/0/SD_ILS:16201 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Aminuddin Muhamad Saleh<br/>Author&#160;Aminuddin Muhamad Saleh<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10705<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Perbandingan analisis dan rekabentuk papak selanjar dan disokong mudah ent://SD_ILS/0/SD_ILS:16206 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Chen, Fun Tee<br/>Author&#160;Chen, Fun Tee<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10707<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Kajian prestasi simpang berlampu isyarat dengan menggunakan program sidra ent://SD_ILS/0/SD_ILS:16312 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Raizaleffendi Abdul Rashid<br/>Author&#160;Raizaleffendi Abdul Rashid<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10230<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Penilaian impak lalulintas : kajian kes : pembangunan stesen 18 Pasir Puteh, Perak ent://SD_ILS/0/SD_ILS:16316 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Noor Rohimi Saleh<br/>Author&#160;Noor Rohimi Saleh<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10706<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Analisis punca kelewatan yang disebabkan oleh kelemahan sistem pengurusan bahan binaan dan tenaga manusia ent://SD_ILS/0/SD_ILS:133130 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Wong, Puoi Kong<br/>Author&#160;Wong, Puoi Kong<br/>Format:&#160;Books<br/>Call Number&#160;TH153 W66 1999<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Analisis dan rekabentuk tiang untuk kaedah pembinaan mudah bagi papak pratuang dan papak komposit menggunakan G43 keratan keluli Perwaja ent://SD_ILS/0/SD_ILS:133133 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Yeo, Thian Leong<br/>Author&#160;Yeo, Thian Leong<br/>Format:&#160;Books<br/>Call Number&#160;TA683.5.C7 Y46 1999<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Pengurusan penyelenggaraan Hospital Besar Kuala Lumpur ent://SD_ILS/0/SD_ILS:133173 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Wan Abd. Rahim Wan Mamat<br/>Author&#160;Wan Abd. Rahim Wan Mamat<br/>Format:&#160;Books<br/>Call Number&#160;TH3351 W36 1999<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Kajian pengurusan tuntutan pembayaran di dalam projek pembinaan bangunan ent://SD_ILS/0/SD_ILS:133211 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Zahari Ahmad<br/>Author&#160;Zahari Ahmad<br/>Format:&#160;Books<br/>Call Number&#160;TA210 Z33 1999<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Kajian penggunaan polisterin dalam pembinaan bangunan ent://SD_ILS/0/SD_ILS:133223 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Zulkefli Mohamed Arif<br/>Author&#160;Zulkefli Mohamed Arif<br/>Format:&#160;Books<br/>Call Number&#160;TH1092 Z84 1999<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Kajian projek bermasalah di Wilayah Persekutuan, Kuala Lumpur ent://SD_ILS/0/SD_ILS:133240 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Zulkarnain Ali<br/>Author&#160;Zulkarnain Ali<br/>Format:&#160;Books<br/>Call Number&#160;TH438 Z85 1999<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Kajian mengenai penggunaan perancah di dalam kerja-kerja pembinaan bangunan ent://SD_ILS/0/SD_ILS:131592 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ibrahim Che Din<br/>Author&#160;Ibrahim Che Din<br/>Format:&#160;Books<br/>Call Number&#160;TH5281 I27 1999<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Perindustrian bangunan di Malaysia penekanan kepada teknologi pra bina dan pemodularan ent://SD_ILS/0/SD_ILS:131480 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Chooi, Weng Kin<br/>Author&#160;Chooi, Weng Kin<br/>Format:&#160;Books<br/>Call Number&#160;TH1000 C46 1999<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Penggunaan batu bata dalam pembinaan ent://SD_ILS/0/SD_ILS:132061 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohd. Shahuddin Mustafa<br/>Author&#160;Mohd. Shahuddin Mustafa<br/>Format:&#160;Books<br/>Call Number&#160;TA433 M83 1999<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Analisis dan rekabentuk bangunan konkrit bertetulang menggunakan STAAD-III ent://SD_ILS/0/SD_ILS:132945 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Sakinah Saad<br/>Author&#160;Sakinah Saad<br/>Format:&#160;Books<br/>Call Number&#160;TH1501 S24 1999<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Kajian tentang pengawasan pembinaan (projek pembangunan) ent://SD_ILS/0/SD_ILS:133274 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Zainoor Liza Mohamed Nadzri<br/>Author&#160;Zainoor Liza Mohamed Nadzri<br/>Format:&#160;Books<br/>Call Number&#160;TH438 Z35 1999<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Pengurusan tapak pelupusan sisa pepejal di Daerah Bera ent://SD_ILS/0/SD_ILS:16134 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Lim, Kong Hong<br/>Author&#160;Lim, Kong Hong<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10702<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Amalan rekabentuk dan pembinaan asas pad bagi tangki besar untuk industrial gas dan petroleum di Malaysia ent://SD_ILS/0/SD_ILS:16208 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Lee, Mooi Chun<br/>Author&#160;Lee, Mooi Chun<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10703<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper(Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Kegagalan permukaan jalan dan langkah-langkah membaik pulih kegagalan jalan ent://SD_ILS/0/SD_ILS:16210 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ahmad Azmil Mokhtar<br/>Author&#160;Ahmad Azmil Mokhtar<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10690<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Kajian dan kawalan kehilangan hasil air dikawasan Tg. Malim / Slim River Daerah Batang Padang, Perak Darul Ridzuan ent://SD_ILS/0/SD_ILS:16217 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Ajhar Eini<br/>Author&#160;Ajhar Eini<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10711<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Pengurusan sisa pepejal di daerah Temerloh ent://SD_ILS/0/SD_ILS:16223 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Chiu, Chee Kwong<br/>Author&#160;Chiu, Chee Kwong<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10714<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1999<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1999<br/> Pengurusan bahan binaan : pengendalian dan penyimpanan bahan binaan di tapak ent://SD_ILS/0/SD_ILS:16200 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Khairulzaman Saad<br/>Author&#160;Khairulzaman Saad<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10675<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/> Pendekatan kos kitaran hayat bagi rumah bertingkat ent://SD_ILS/0/SD_ILS:132555 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Sukhaimi Marob<br/>Author&#160;Sukhaimi Marob<br/>Format:&#160;Books<br/>Call Number&#160;TH437 S94 1998<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/> Rekabentuk tiang keluli menggunakan microsoft excell berserta pengiraan terperinci ent://SD_ILS/0/SD_ILS:132977 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Tuan Mohd. Azani R. Hassan<br/>Author&#160;Tuan Mohd. Azani R. Hassan<br/>Format:&#160;Books<br/>Call Number&#160;TH4818.S73 T83 1998<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/> Tuntutan dan pertikaian didalam industri pembinaan di Malaysia ent://SD_ILS/0/SD_ILS:133150 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Yahya Md. Noh<br/>Author&#160;Yahya Md. Noh<br/>Format:&#160;Books<br/>Call Number&#160;TA210 Y33 1998<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/> Penggunaan sistem perangkap endapan di kawasan pembinaan ent://SD_ILS/0/SD_ILS:135912 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abd. Kadir Kusene<br/>Author&#160;Abd. Kadir Kusene<br/>Format:&#160;Books<br/>Call Number&#160;QE472 A43 1998<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/> Sistem asas untuk projek mega : satu kajian kes ent://SD_ILS/0/SD_ILS:132008 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohamad Anuar Othman<br/>Author&#160;Mohamad Anuar Othman<br/>Format:&#160;Books<br/>Call Number&#160;TH5201 M36 1998<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/> Pembinaan secara 'Prefab' dan konvesional : kajian &amp; perbandingan ent://SD_ILS/0/SD_ILS:132091 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohd. Arshad Suparman<br/>Author&#160;Mohd. Arshad Suparman<br/>Format:&#160;Books<br/>Call Number&#160;TH1098 M38 1998<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/> Rekabentuk tiang keluli menggunakan microsoft excell berserta pengiraan terperinci ent://SD_ILS/0/SD_ILS:566437 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Tuan Mohd. Azani R. Hassan<br/>Author&#160;Tuan Mohd. Azani R. Hassan<br/>Format:&#160;Computer file<br/>Call Number&#160;DSK 1799 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/> Dokumen kontrak : kerja-kerja mengubahsuai bangunan sedia ada dan membina bangunan baru untuk kampus cawangan sementara, Universiti Teknologi Malaysia, Kuantan, Pahang ent://SD_ILS/0/SD_ILS:622548 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Universiti Teknologi Malaysia<br/>Author&#160;Universiti Teknologi Malaysia,&#160;Comtrac Sdn. Bhd<br/>Format:&#160;Books<br/>Call Number&#160;NA6605.M3 D53 1998 v.1<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/> Pengurusan sub-kontraktor bagi projek pembangunan perumahan kediaman komersial bertingkat ent://SD_ILS/0/SD_ILS:132036 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohd. Safee Ab. Latif<br/>Author&#160;Mohd. Safee Ab. Latif<br/>Format:&#160;Books<br/>Call Number&#160;TH438 M74 1998<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Kertas projek (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/> Penggunaan sistem perangkap endapan di kawasan pembinaan ent://SD_ILS/0/SD_ILS:16117 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abd. Kadir Kusene<br/>Author&#160;Abd. Kadir Kusene<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10680<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/> Teknik pembinaan jambatan di Sungai Kayu Ara ent://SD_ILS/0/SD_ILS:16122 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Mohd. Jailani Mohd. Juzad<br/>Author&#160;Mohd. Jailani Mohd. Juzad<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 10685<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1998<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 1998<br/> Cadangan pembinaan foyer, di Fakulti kejuruteraan Elektrik, Universiti Teknologi Malaysia, Sekudai, Johor [dokumen kontrak] ent://SD_ILS/0/SD_ILS:448094 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Universiti Teknologi Malaysia<br/>Author&#160;Universiti Teknologi Malaysia,&#160;HAZRA Enterprise<br/>Format:&#160;Books<br/>Call Number&#160;TH153 C33<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1997<br/> Pengurusan kompleks : ke arah profesionalisma; Penggunaan G.I.S dalam pengurusan tanah wakaf di jajahan Kota Bharu Kelantan; Pembangunan sistem maklumat transaksi harta tanah; Penggunaan GIS (Geographic Information System) dalam pembentukan sistem maklumat bagi maksud penilaian harta tanah : kes kajian : Taman Sentosa; Penggunaan GIS dalam pengurusan maklumat urusetia perancangan Lembah Kelang; Development of a soil erosion modelling and prediction package for environmental impact assessment (EIA) using G.I.S Prime Meridian ent://SD_ILS/0/SD_ILS:21917 2024-05-25T15:09:24Z 2024-05-25T15:09:24Z by&#160;Abdul Rahman Bakar<br/>Author&#160;Abdul Rahman Bakar,&#160;Abu Rashdi Deraman,&#160;Leong, Hong Kuan,&#160;Nor Azam Mohd. Ramly,&#160;Nyon, Yong Chik<br/>Format:&#160;Visual Materials<br/>Call Number&#160;MFL 8805 ra<br/>Publisher&#160;Universiti Teknologi Malaysia,<br/>Publication Date&#160;1996<br/>Kertas projek (Sarjana Muda Ukur (Pengurusan Harta Benda)) - Universiti Teknologi Malaysia, 1996&#160;Project paper (Bachelor of Surveying (Land)) - Universiti Teknologi Malaysia, 1996<br/>