Search Results for Muzani Mustapa,SirsiDynix Enterprisehttp://portal.utm.my/client/en_AU/main/main/qu$003dMuzani$002bMustapa$00252C$0026ic$003dtrue$0026ps$003d300?dt=list2024-04-18T10:21:54ZFacilities management knowledge in private finance initiative (PFI) healthcare projectsent://SD_ILS/0/SD_ILS:8152242024-04-18T10:21:54Z2024-04-18T10:21:54Zby Muzani Mustapa<br/>Author Muzani Mustapa, Carillo, Patricia, supervisor, Ruikar, Kirti, supervisor<br/>Format: Books<br/>Call Number TS177 M89 2013 raf<br/>Publication Date 2013<br/>Thesis (Ph.D) - Loughborough University, 2013<br/>Identification and classification of project manager's knowledge needsent://SD_ILS/0/SD_ILS:4379032024-04-18T10:21:54Z2024-04-18T10:21:54Zby Muzani Mustapa<br/>Author Muzani Mustapa<br/>Format: Books<br/>Call Number HD69.P75 M89 2005<br/>Publisher Loughborough University,<br/>Publication Date 2005<br/>Thesis (Master of Science (Construction Management)) - Loughborough University, 2005<br/>Kesesuaian peruntukan fasal pindaan dan pengukuran kerja, lanjutan masa, serta perakuan dan pembayaran borang kontrak FIDIC ke atas kerja bangunanent://SD_ILS/0/SD_ILS:3066442024-04-18T10:21:54Z2024-04-18T10:21:54Zby Muzani Mustapa<br/>Author Muzani Mustapa<br/>Format: Books<br/>Call Number TA180 M89 2002<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2002<br/>Kertas Projek (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2002<br/>Variation in the standard from of contract in Malaysia and Indonesiaent://SD_ILS/0/SD_ILS:8528962024-04-18T10:21:54Z2024-04-18T10:21:54Zby Bayu Dwi Rahmatyo, 1986-<br/>Author Bayu Dwi Rahmatyo, 1986-, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number CP 056264 ra<br/>Publication Date 2016<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2016<br/>Variation in the standard form of contract in Malaysia and Indonesiaent://SD_ILS/0/SD_ILS:8528952024-04-18T10:21:54Z2024-04-18T10:21:54Zby Bayu Dwi Rahmatyo, 1986-<br/>Author Bayu Dwi Rahmatyo, 1986-, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number XX(852895.1)<br/>Publication Date 2015<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2015<br/>Salient elements to be incorporated into BIM standard contract pertaining to variation provisionent://SD_ILS/0/SD_ILS:8857332024-04-18T10:21:54Z2024-04-18T10:21:54Zby Kok, Shaun Zhen Xiong, 1994-, author<br/>Author Kok, Shaun Zhen Xiong, 1994-, author, Nur Emma Mustaffa, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina dan Ukur<br/>Format: Books<br/>Call Number XX(885733.1)<br/>Publication Date 2019<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2019<br/>Risk management practice in infrastructure project : a case-study on a highway project in Kalimantan, Indonesiaent://SD_ILS/0/SD_ILS:8857242024-04-18T10:21:54Z2024-04-18T10:21:54Zby Agung Rio Rimbanu, 1987-, author<br/>Author Agung Rio Rimbanu, 1987-, author, Muzani Mustapa, supervisor, Zuhaili Mohamad Ramly, 1984-, supervisor, Fakulti Alam Bina dan Ukur<br/>Format: Books<br/>Call Number XX(885724.1)<br/>Publication Date 2019<br/>Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2019<br/>Pre-contract cost management: a study on risk management and its effect towards costsent://SD_ILS/0/SD_ILS:8694742024-04-18T10:21:54Z2024-04-18T10:21:54Zby Nazirul Fariq Mohd. Kassim, 1991- , author<br/>Author Nazirul Fariq Mohd. Kassim, 1991- , author, Muzani Mustapa, supervisor, Fakulti Kejuruteraan. Sekolah Kejuruteraan Awam<br/>Format: Books<br/>Call Number XX(869474.2)<br/>Publication Date 2018<br/>Thesis (Sarjana Pengurusan Projek) - Universiti Teknologi Malaysia, 2018<br/>Risk allocation framework development for build-operate-transfer highway projects in Nigeriaent://SD_ILS/0/SD_ILS:8815392024-04-18T10:21:54Z2024-04-18T10:21:54Zby Fabi Jonathan Kehinde, 1976-, author<br/>Author Fabi Jonathan Kehinde, 1976-, author, Razali Abdul Hamid, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina dan Ukur<br/>Format: Books<br/>Call Number K3836 F33 2018 raf<br/>Publication Date 2018<br/>Thesis (Ph.D (Ukur Bahan)) - Universiti Teknologi Malaysia, 2018<br/>Risk allocation framework development for build-operate-transfer highway projects in Nigeriaent://SD_ILS/0/SD_ILS:8815402024-04-18T10:21:54Z2024-04-18T10:21:54Zby Fabi Jonathan Kehinde, 1976-, author<br/>Author Fabi Jonathan Kehinde, 1976-, author, Razali Abdul Hamid, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina dan Ukur<br/>Format: Electronic Resources<br/>Call Number CP 082812 ra<br/>Publication Date 2018<br/>Thesis (Ph.D (Ukur Bahan)) - Universiti Teknologi Malaysia, 2018<br/>CONTEMPORARY ISSUES IN PROJECT MANAGEMENTent://SD_ILS/0/SD_ILS:8649332024-04-18T10:21:54Z2024-04-18T10:21:54Zby Mohd Saidin Misnan, editor<br/>Author Mohd Saidin Misnan, editor, Mohammadamin Azimi, contributor, Sarajul Fikri Mohamed, contributor, Zuhaili Mohamad Ramly, contributor, Nuremma Mustafa, contributor<br/>Format: Books<br/>Call Number HD9715.A2 C668 2017 a<br/>Edition First Edition 2017<br/>Publication Date 2017<br/>ISBN 9789835213748<br/>STRATEGIC ISSUES IN PROJECT MANAGEMENTent://SD_ILS/0/SD_ILS:8649942024-04-18T10:21:54Z2024-04-18T10:21:54Zby Mohd. Saidin Misnan, 1971-, editor<br/>Author Mohd. Saidin Misnan, 1971-, editor, Mohammadamin Azimi, 1984-, editor, Mohd. Saidin Misnan, 1971-, contributor, Sarajul Fikri Mohamed, contributor, Fara Diva Mustapa, contributor<br/>Format: Books<br/>Call Number HD69.P75 S773 2017 a<br/>Edition First Edition 2017<br/>Publication Date 2017<br/>ISBN 9789835214141<br/>PENYELENGGARAAN STRUKTURent://SD_ILS/0/SD_ILS:8652392024-04-18T10:21:54Z2024-04-18T10:21:54Zby Mohd. Saidin Misnan, 1971-, editor<br/>Author Mohd. Saidin Misnan, 1971-, editor, Mohammadamin Azimi, 1984-, editor, Mohd. Saidin Misnan, contributor, Sarajul Fikri Mohamed, contributor, Fara Diva Mustapa, contributor<br/>Format: Books<br/>Call Number TA168 P46 2016 a<br/>Edition First Edition 2016<br/>Publication Date 2016<br/>ISBN 9789835213663<br/>PENGURUSAN LOGISTIK DI TAPAK BINAent://SD_ILS/0/SD_ILS:8652412024-04-18T10:21:54Z2024-04-18T10:21:54Zby Mohd. Saidin Misnan, 1971-, editor<br/>Author Mohd. Saidin Misnan, 1971-, editor, Mohammadamin Azimi, 1984-, editor, Mohd. Saidin Misnan, contributor, Sarajul Fikri Mohamed, contributor, Fara Diva Mustapa, contributor<br/>Format: Books<br/>Call Number TA144 P46 2016 a<br/>Edition First Edition 2016<br/>Publication Date 2016<br/>ISBN 9789835213656<br/>Pembinaan rumah panjang baru (moden) di Sarawak : kaedah dan kos pembinaanent://SD_ILS/0/SD_ILS:8446992024-04-18T10:21:54Z2024-04-18T10:21:54Zby Wung, Jia Hui, 1989- author<br/>Author Wung, Jia Hui, 1989- author, Muzani Mustapa, supervisor, Wan Yusoff Wan Mahmood, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD7287 W86 2014 raf<br/>Publication Date 2014<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2014<br/>Kaedah mengelakkan kelewatan bagi kerja kontraktor di Indonesiaent://SD_ILS/0/SD_ILS:7934622024-04-18T10:21:54Z2024-04-18T10:21:54Zby Ayu Primasari Andini<br/>Author Ayu Primasari Andini, Muzani Mustapa, supervisor, Wan Yusoff Wan Mahmood, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA210 A98 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) – Universiti Teknologi Malaysia, 2012<br/>Perubahan kerja pada bangunan tinggient://SD_ILS/0/SD_ILS:7935342024-04-18T10:21:54Z2024-04-18T10:21:54Zby Rossidah Halim, 1980- , author<br/>Author Rossidah Halim, 1980- , author, Fadhlin Abdullah, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH845 R67 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda) - Universiti Teknologi Malaysia, 2012<br/>A study on ICT adoption for materials management among contractors in construction industryent://SD_ILS/0/SD_ILS:7935992024-04-18T10:21:54Z2024-04-18T10:21:54Zby Chai, Sheng Jane, 1990-<br/>Author Chai, Sheng Jane, 1990-, Fara Diva Mustapa, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TS161 C43 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Perbandingan analisis kos antara kaedah penanaman cara biasa dengan penanaman menggunakan kaedah 'ROOT BARRIER' bagi pengawalan akar pokokent://SD_ILS/0/SD_ILS:7937442024-04-18T10:21:54Z2024-04-18T10:21:54Zby Wan Fuzifadli Wan Ibrahim<br/>Author Wan Fuzifadli Wan Ibrahim, Muzani Mustapa, supervisor, Norazam Othman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number SB472.535.F6 W48 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Menilai impak kenaikan harga bahan binaan dan mengenalpasti strategi-strategi yang dipraktikkan oleh kontraktor untuk memastikan daya maju projekent://SD_ILS/0/SD_ILS:7937252024-04-18T10:21:54Z2024-04-18T10:21:54Zby Lee, Lit Wei, 1989-<br/>Author Lee, Lit Wei, 1989-, Ismail Haron, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA403 L44 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2012<br/>Intranet-based tools in transfering and sharing knowledgeent://SD_ILS/0/SD_ILS:7935042024-04-18T10:21:54Z2024-04-18T10:21:54Zby Fong, Li Wen, 1989- , author<br/>Author Fong, Li Wen, 1989- , author, Muzani Mustapa, supervisor, Abdul Wahid Kamarulzaman, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TK5105.875.I6 F66 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>The awareness of high-rise office buildings' occupants towards fire safetyent://SD_ILS/0/SD_ILS:7935062024-04-18T10:21:54Z2024-04-18T10:21:54Zby Lee, Kui Jan, 1989-<br/>Author Lee, Kui Jan, 1989-, Yahya Mohamad Yatim, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH9145 L44 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Pelaksanaan pengurusan nilai di dalam industri pembinaanent://SD_ILS/0/SD_ILS:7936632024-04-18T10:21:54Z2024-04-18T10:21:54Zby Nur Izieadiana Abidin, 1989-<br/>Author Nur Izieadiana Abidin, 1989-, Ismail Haroni, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 N59 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Punca kerosakan dan kos pembiakpulihan bagi bangunan pejabat kerajanent://SD_ILS/0/SD_ILS:7936732024-04-18T10:21:54Z2024-04-18T10:21:54Zby Maimunah Abdullah, 1972-<br/>Author Maimunah Abdullah, 1972-, Roslan Amirudin supervisor, Muzani Mustapa supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH3351 M353 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Risiko di tapak bina bagi projek pembinaan yang menggunakan sistem pembinaan berindustri (IBS)ent://SD_ILS/0/SD_ILS:7937412024-04-18T10:21:54Z2024-04-18T10:21:54Zby Sangeetha Arjinan, 1990- , author<br/>Author Sangeetha Arjinan, 1990- , author, Muzani Mustapa, supervisor, Jamaludin Yaakob, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number HD9715.A2 S26 2012 raf<br/>Publication Date 2012<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2012<br/>Jurukur bahan dalam kontrak kaedah reka dan bina: tanggungjawab dan kadar bayaran profesionalent://SD_ILS/0/SD_ILS:8057922024-04-18T10:21:54Z2024-04-18T10:21:54Zby Zaiton Kadir, 1969-<br/>Author Zaiton Kadir, 1969-, Sarajul Fikri Mohamed, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH435 Z35 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan) - Universiti Teknologi Malaysia, 2011<br/>The construction workers awareness on using first aid (FA) in construction industryent://SD_ILS/0/SD_ILS:7773782024-04-18T10:21:54Z2024-04-18T10:21:54Zby R. Sugaindren A. Rajendran, 1988-, author<br/>Author R. Sugaindren A. Rajendran, 1988-, author, Nur Emma Mustaffa, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA192 R78 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Pemahaman kontraktor mengenai peruntukan fasal ganti rugi ditetapkan (LAD)ent://SD_ILS/0/SD_ILS:7773592024-04-18T10:21:54Z2024-04-18T10:21:54Zby Ab. Rashid Jaffar, 1988- , author<br/>Author Ab. Rashid Jaffar, 1988- , author, Jamaludin Yaakob, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TA210 A27 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Ukur Bahan)) - Universiti Teknologi Malaysia, 2011<br/>Pengurusan kualiti kerja-kerja pembinaanent://SD_ILS/0/SD_ILS:7773682024-04-18T10:21:54Z2024-04-18T10:21:54Zby Abdul Razalan Hassanul Basri, 1988- , author<br/>Author Abdul Razalan Hassanul Basri, 1988- , author, Fadhlin Abdullah, supervisor, Muzani Mustapa, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH438 A236 2011 raf<br/>Publication Date 2011<br/>Project Paper (Sarjana Muda Sains (Pembinaan)) - Universiti Teknologi Malaysia, 2011<br/>Quantification and cost of scaffoldingent://SD_ILS/0/SD_ILS:8601292024-04-18T10:21:54Z2024-04-18T10:21:54Zby Ten, Yuen Her, 1991-, author<br/>Author Ten, Yuen Her, 1991-, author, Muzani Mustapa, supervisor, Norazam Othman, 1963-, supervisor, Fakulti Alam Bina<br/>Format: Books<br/>Call Number TH435 T46 2015 raf<br/>Project Paper (Sarjana Muda (Ukur Bahan)) - Universiti Teknologi Malaysia, 2015<br/>