Search Results for Production control - Narrowed by: Masine Md. Tap, supervisor - Production control
SirsiDynix Enterprise
http://portal.utm.my/client/en_AU/main/main/qu$003dProduction$002bcontrol$0026qf$003dAUTHOR$002509Author$002509Masine$002bMd.$002bTap$00252C$002bsupervisor$002509Masine$002bMd.$002bTap$00252C$002bsupervisor$0026qf$003dSUBJECT$002509Subject$002509Production$002bcontrol$002509Production$002bcontrol$0026ps$003d300?dt=list
2024-05-15T20:42:58Z
Modeling lifetime warranty policy involving cost sharing between manufacturer and module supplier
ent://SD_ILS/0/SD_ILS:829185
2024-05-15T20:42:58Z
2024-05-15T20:42:58Z
by Ranjbaran, Alireza, 1982-<br/>Author Ranjbaran, Alireza, 1982-, Masine Md. Tap, supervisor, Fakulti Kejuruteraan Mekanikal<br/>Format: Books<br/>Call Number TS156 R36 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Kejuruteraan (Kejuruteraan Industri)) - Universiti Teknologi Malaysia, 2013<br/>
Modeling of warranty cost for a lifetime warranty policy
ent://SD_ILS/0/SD_ILS:828839
2024-05-15T20:42:58Z
2024-05-15T20:42:58Z
by Pezhman Ahmadi Khoshbakht, 1986-<br/>Author Pezhman Ahmadi Khoshbakht, 1986-, Masine Md. Tap, supervisor, Fakulti Kejuruteraan Mekanikal<br/>Format: Books<br/>Call Number TS156 P49 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Kejuruteraan (Kejuruteraan Industri)) - Universiti Teknologi Malaysia, 2013<br/>
A mixed integer programming model formulation for solving the lot sizing problem
ent://SD_ILS/0/SD_ILS:785642
2024-05-15T20:42:58Z
2024-05-15T20:42:58Z
by Maryam Mohammadi, 1987-<br/>Author Maryam Mohammadi, 1987-, Masine Md. Tap, supervisor, Fakulti Kejuruteraan Mekanikal<br/>Format: Books<br/>Call Number TS155.6 M37 2012 raf<br/>Publication Date 2012<br/>Thesis (Sarjana Kejuruteraan (Kejuruteraan Industri)) – Universiti Teknologi Malaysia, 2012<br/>