Search Results for Scheduling -- Data processing - Narrowed by: EnglishSirsiDynix Enterprisehttp://portal.utm.my/client/en_AU/main/main/qu$003dScheduling$002b--$002bData$002bprocessing$0026qf$003dLANGUAGE$002509Language$002509ENG$002509English$0026ic$003dtrue$0026ps$003d300$0026isd$003dtrue?dt=list2024-05-06T14:20:42ZInternode router for hypercube parallel computer; Multiarchitecture back-end distribution processing task scheduling development; An investigationof an object-oriented design implementation of a speech recognition system based on N-tuple algorithm; Static stimulus testing; Smart employee identification card; Basic micropeocessor learning system; Micro controller based data logger; Security access system using smart cardent://SD_ILS/0/SD_ILS:3339832024-05-06T14:20:42Z2024-05-06T14:20:42Zby Chen, Yen Kuang<br/>Author Chen, Yen Kuang, Hussaini Nordin Ali, Mas'od Mustafa, Norhilal Hashim, Ong, Weng Hang<br/>Format: Books<br/>Call Number MFL 7920 ra<br/>Publisher UTM,<br/>Publication Date 1993<br/>Project paper (Bachelor of Electrical Engineering) - Universiti Teknologi Malaysia, 1993<br/>IoT-based automatic irrigation system using particle photonent://SD_ILS/0/SD_ILS:8723772024-05-06T14:20:42Z2024-05-06T14:20:42Zby Noor Hazira Yusof, 1993- , author<br/>Author Noor Hazira Yusof, 1993- , author, Nik Noordini Nik Abd. Malik, 1980- , supervisor, Fakulti Kejuruteraan Elektrik<br/>Format: Books<br/>Call Number S 619.E34 N66 2017 raf<br/>Publication Date 2017<br/>Project Paper (Sarjana Muda Kejuruteraan (Elektrik)) - Universiti Teknologi Malaysia, 2017<br/>IoT-based automatic irrigation system using particle photonent://SD_ILS/0/SD_ILS:8723812024-05-06T14:20:42Z2024-05-06T14:20:42Zby Noor Hazira Yusof, 1993- , author<br/>Author Noor Hazira Yusof, 1993- , author<br/>Format: Books<br/>Call Number CP 066128 ra<br/>Publication Date 2017<br/>Project Paper (Sarjana Muda Kejuruteraan (Elektrik)) - Universiti Teknologi Malaysia, 2017<br/>NETWORKING BIG DATAent://SD_ILS/0/SD_ILS:8652712024-05-06T14:20:42Z2024-05-06T14:20:42Zby Yu, Shui, editor<br/>Author Yu, Shui, editor, Lin, Xiaodong, editor, Misic, Jelena, editor, Shen, X. (Xuemin), 1958-, editor<br/>Format: Books<br/>Call Number QA76.9.C92 N48 2016<br/>Publication Date 2016<br/>ISBN 9781482263497<br/>Tabu search method for solving multiobjective job shop scheduling problement://SD_ILS/0/SD_ILS:8507222024-05-06T14:20:42Z2024-05-06T14:20:42Zby Nor Fauzana Awang, 1989-<br/>Author Nor Fauzana Awang, 1989-, Rashidah Ahmad, supervisor, Fakulti Sains<br/>Format: Books<br/>Call Number TS157.5 N67 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana Sains (Matematik)) - Universiti Teknologi Malaysia, 2015<br/>Tabu search method for solving multiobjective job shop scheduling problement://SD_ILS/0/SD_ILS:8507252024-05-06T14:20:42Z2024-05-06T14:20:42Zby Nor Fauzana Awang, 1989-<br/>Author Nor Fauzana Awang, 1989-, Rashidah Ahmad, supervisor, Fakulti Sains<br/>Format: Books<br/>Call Number CP 054442 ra<br/>Publication Date 2015<br/>Thesis (Sarjana Sains (Matematik)) - Universiti Teknologi Malaysia, 2015<br/>Data sampling time scheduling algorithm based on maximum allowable loop delay for networked control systement://SD_ILS/0/SD_ILS:8507442024-05-06T14:20:42Z2024-05-06T14:20:42Zby Amira Sarayati Ahmad Dahalan, 1986-, author<br/>Author Amira Sarayati Ahmad Dahalan, 1986-, author<br/>Format: Books<br/>Call Number CP 054450 ra<br/>Publication Date 2015<br/>Thesis (Sarjana Kejuruteraan (Elektrik)) - Universiti Teknologi Malaysia, 2015<br/>Data sampling time scheduling algorithm based on maximum allowable loop delay for networked control systement://SD_ILS/0/SD_ILS:8467332024-05-06T14:20:42Z2024-05-06T14:20:42Zby Amira Sarayati Ahmad Dahalan, 1986-, author<br/>Author Amira Sarayati Ahmad Dahalan, 1986-, author, Abdul Rashid Husain, Fakulti Kejuruteraan Elektrik<br/>Format: Books<br/>Call Number TJ213 A45 2015 raf<br/>Publication Date 2015<br/>Thesis (Sarjana Kejuruteraan (Elektrik)) - Universiti Teknologi Malaysia, 2015<br/>Online scheduling in manufacturing: a cumulative delay approachent://SD_ILS/0/SD_ILS:8045842024-05-06T14:20:42Z2024-05-06T14:20:42Zby Suwa, Haruhiko<br/>Author Suwa, Haruhiko, Sandoh, Hiroaki<br/>Format: Books<br/>Call Number TS157.5 S88 2013<br/>Publisher Springer-Verlag,<br/>Publication Date 2013<br/>ISBN 9781447145608<br/>A scheduling analysis framework for predicting the weakly hard real-time systemsent://SD_ILS/0/SD_ILS:8119492024-05-06T14:20:42Z2024-05-06T14:20:42Zby Habibah Ismail, 1982-<br/>Author Habibah Ismail, 1982-, Dayang Norhayati Abang Jawawi, Fakulti Komputeran<br/>Format: Books<br/>Call Number HF5548.3 H33 2013 raf<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Sains Komputer)) - Universiti Teknologi Malaysia, 2013<br/>A scheduling analysis framework for predicting the weakly hard real-time systemsent://SD_ILS/0/SD_ILS:8119502024-05-06T14:20:42Z2024-05-06T14:20:42Zby Habibah Ismail, 1982-<br/>Author Habibah Ismail, 1982-<br/>Format: Books<br/>Call Number CP 031138 ra<br/>Publication Date 2013<br/>Thesis (Sarjana Sains (Sains Komputer)) - Universiti Teknologi Malaysia, 2013<br/>Metaheuristics for production schedulingent://SD_ILS/0/SD_ILS:8224542024-05-06T14:20:42Z2024-05-06T14:20:42Zby Jarboui, Bassem<br/>Author Jarboui, Bassem, Siarry, Patrick, Teghem, Jacques, 1948-<br/>Format: Books<br/>Call Number TS157.5 M48 2013<br/>Publisher ISTE Ltd. ; Hoboken : Wiley-ISTE,<br/>Publication Date 2013<br/>ISBN 9781848214972<br/>Applied predictive modelingent://SD_ILS/0/SD_ILS:8333502024-05-06T14:20:42Z2024-05-06T14:20:42Zby Kuhn, Max, author<br/>Author Kuhn, Max, author, Johnson, Kjell, author<br/>Format: Books<br/>Call Number QA276 K84 2013<br/>Publisher Springer,<br/>Publication Date 2013<br/>ISBN 9781461468486<br/>Location-based management for construction : planning, scheduling and controlent://SD_ILS/0/SD_ILS:3739482024-05-06T14:20:42Z2024-05-06T14:20:42Zby Kenley, Russell<br/>Author Kenley, Russell, Seppanen, Olli<br/>Format: Books<br/>Call Number TH438.4 K46 2010<br/>Publisher Spon Press,<br/>Publication Date 2010<br/>ISBN 9780415370509<br/>Managing construction logisticsent://SD_ILS/0/SD_ILS:6278272024-05-06T14:20:42Z2024-05-06T14:20:42Zby Sullivan, Gary, 1959-<br/>Author Sullivan, Gary, 1959-, Barthorpe, Stephen, Robbins, Stephen, 1979-<br/>Format: Books<br/>Call Number TH437 S95 2010<br/>Publisher Blackwell,<br/>Publication Date 2010<br/>ISBN 9781405151245<br/>Introduction to schedulingent://SD_ILS/0/SD_ILS:7307522024-05-06T14:20:42Z2024-05-06T14:20:42Zby Robert, Yves, 1938-<br/>Author Robert, Yves, 1938-, Vivien, Frederic<br/>Format: Books<br/>Call Number QA76.9.D5 I673 2010<br/>Publisher CRC Press,<br/>Publication Date 2010<br/>ISBN 9781420072730<br/>The deadline - based scheduling of divisible real - time workloads on multiprocessor platformsent://SD_ILS/0/SD_ILS:3792992024-05-06T14:20:42Z2024-05-06T14:20:42Zby Suriayati Chuprat, 1973-<br/>Author Suriayati Chuprat, 1973-, Shaharuddin Salleh, supervisor, Fakulti Sains<br/>Format: Books<br/>Call Number QA76.5 S974 2009 raf<br/>Publication Date 2009<br/>Thesis (Ph.D (Matematik))- Universiti Teknologi Malaysia, 2009<br/>Development of scheduling system for job shopent://SD_ILS/0/SD_ILS:6041572024-05-06T14:20:42Z2024-05-06T14:20:42Zby Chew, Stanley Teck Hwa, 1986-<br/>Author Chew, Stanley Teck Hwa, 1986-<br/>Format: Computer file<br/>Call Number CP 029022 ra<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Mekanikal - Industri)) - Universiti Teknologi Malaysia, 2009<br/>Development of scheduling system for job shopent://SD_ILS/0/SD_ILS:3981512024-05-06T14:20:42Z2024-05-06T14:20:42Zby Chew, Stanley Teck Hwa, 1986-<br/>Author Chew, Stanley Teck Hwa, 1986-, Sha'ri Mohd. Yusof, Fakulti Kejuruteraan Mekanikal<br/>Format: Books<br/>Call Number TS157.5 C44 2009 raf<br/>Publication Date 2009<br/>Project Paper (Sarjana Muda Kejuruteraan (Mekanikal - Industri)) - Universiti Teknologi Malaysia, 2009<br/>Construction supply chain economicsent://SD_ILS/0/SD_ILS:2397342024-05-06T14:20:42Z2024-05-06T14:20:42Zby London, Kerry<br/>Author London, Kerry<br/>Format: Books<br/>Call Number TH437 L66 2008<br/>Publisher Taylor & Francis,<br/>Publication Date 2008<br/>ISBN 9780415409711<br/>Systematic methodology for real-time cost-effective mapping of dynamic concurrent task-based systems on heterogenous platformsent://SD_ILS/0/SD_ILS:2105992024-05-06T14:20:42Z2024-05-06T14:20:42Zby Ma, Zhe<br/>Author Ma, Zhe<br/>Format: Books<br/>Call Number TK7895.E42 S976 2007<br/>Publisher Springer,<br/>Publication Date 2007<br/>ISBN 9781402063282 9781402063442<br/><a href="http://dx.doi.org/10.1007/978-1-4020-6344-2">Fulltext</a><br/>Remote access restricted to users with a valid UTM ID via VPN<br/>Kajian terhadap penjadualan pengeluaran di syarikat Tunglip Precision Industry Sdn. Bhd.ent://SD_ILS/0/SD_ILS:7845892024-05-06T14:20:42Z2024-05-06T14:20:42Zby Kong Kim Leng<br/>Author Kong Kim Leng, FPPSM<br/>Format: Visual Materials<br/>Call Number MFL 014175 ra c.1<br/>Publication Date 2007<br/>Project Paper (Sarjana Muda Pengurusan (Teknologi)) - Universiti Teknologi Malaysia, 2007<br/>Observation on flow characteristics in grass swaleent://SD_ILS/0/SD_ILS:91042024-05-06T14:20:42Z2024-05-06T14:20:42Zby Farashafina Saipollah<br/>Author Farashafina Saipollah<br/>Format: Visual Materials<br/>Call Number MFL 13624<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Kejuruteraan Awam) - Universiti Teknologi Malaysia, 2006<br/>Real time scheduling for autonomous mobile robots using genetic algorithm and constraint based reasoningent://SD_ILS/0/SD_ILS:6181102024-05-06T14:20:42Z2024-05-06T14:20:42Zby Ammar Abdo Mohammed Hasan<br/>Author Ammar Abdo Mohammed Hasan<br/>Format: Computer file<br/>Call Number CP 11959<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Thesis (Sarjana Sains (Sains Komputer)) - Universiti Teknologi Malaysia, 2006<br/>Real time scheduling for autonomous mobile robots using genetic algorithm and constraint based reasoningent://SD_ILS/0/SD_ILS:4721622024-05-06T14:20:42Z2024-05-06T14:20:42Zby Ammar Abdo Mohammed Hasan<br/>Author Ammar Abdo Mohammed Hasan<br/>Format: Books<br/>Call Number QA76.54 A45 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=41061">Preview</a><br/>Thesis (Sarjana Sains (Sains Komputer)) - Universiti Teknologi Malaysia, 2006<br/>Application of simulation in scheduling strategies in a manufacturing companyent://SD_ILS/0/SD_ILS:889702024-05-06T14:20:42Z2024-05-06T14:20:42Zby Chan, Cheng Hing<br/>Author Chan, Cheng Hing<br/>Format: Books<br/>Call Number TS157.5 C42 2006<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=56396">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan (Mekanikal)) - Universiti Teknologi Malaysia, 2006<br/>Application of simulation in scheuling strategies in a manufacturing companyent://SD_ILS/0/SD_ILS:5131522024-05-06T14:20:42Z2024-05-06T14:20:42Zby Chan, Cheng Hing<br/>Author Chan, Cheng Hing<br/>Format: Computer file<br/>Call Number CP 012960<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2006<br/>Project Paper (Sarjana Muda Kejuruteraan (Mekanikal)) - Universiti Teknologi Malaysia, 2006<br/>Technical drawings : accompanied with computer integrated construction project schedulingent://SD_ILS/0/SD_ILS:8406722024-05-06T14:20:42Z2024-05-06T14:20:42Zby Buttelwerth, John<br/>Author Buttelwerth, John<br/>Format: Books<br/>Call Number LTK TH438.4 B88 2005 v.1<br/>Publisher Prentice Hall,<br/>Publication Date 2005<br/>ISBN 9780131114654<br/>Evaluation of strategies in managing a job shop with random routingt through simulationent://SD_ILS/0/SD_ILS:6185062024-05-06T14:20:42Z2024-05-06T14:20:42Zby Sarah Balangalibun<br/>Author Sarah Balangalibun<br/>Format: Computer file<br/>Call Number CP 4557<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan Mekanikal (Industri)) - Universiti Teknologi Malaysia, 2005<br/>Scheduling strategies for batch production in a plating companyent://SD_ILS/0/SD_ILS:6185302024-05-06T14:20:42Z2024-05-06T14:20:42Zby Leong, Kee Yann<br/>Author Leong, Kee Yann<br/>Format: Computer file<br/>Call Number CP 10696<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/>Project Paper (Sarjana Muda Kejuruteraan (Mekanikal - Industri)) - Universiti Teknologi Malaysia, 2005<br/>Evaluation of strategies in managing a job shop with random routingt through simulationent://SD_ILS/0/SD_ILS:4734412024-05-06T14:20:42Z2024-05-06T14:20:42Zby Sarah Balangalibun<br/>Author Sarah Balangalibun<br/>Format: Books<br/>Call Number TS157.5 S27 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=54973">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan Mekanikal (Industri)) - Universiti Teknologi Malaysia, 2005<br/>Scheduling strategies for batch production in a plating companyent://SD_ILS/0/SD_ILS:4735522024-05-06T14:20:42Z2024-05-06T14:20:42Zby Leong, Kee Yann<br/>Author Leong, Kee Yann<br/>Format: Books<br/>Call Number TS157.5 L46 2005<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2005<br/><a href="http://www.psz.utm.my/sla/billing/login.asp?mid=53893">Full text</a><br/>Project Paper (Sarjana Muda Kejuruteraan (Mekanikal - Industri)) - Universiti Teknologi Malaysia, 2005<br/>Automation system for measuring the gas sensor resistance using electrometer 617 through computer and GPIB interfaceent://SD_ILS/0/SD_ILS:81262024-05-06T14:20:42Z2024-05-06T14:20:42Zby Lim, Kheng Boo<br/>Author Lim, Kheng Boo<br/>Format: Visual Materials<br/>Call Number MFL 13071<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Project Paper (Sarjana Muda Sains (Fizik Bahan)) - Universiti Teknologi Malaysia, 2004<br/>A branch and bound and simulated annealing approach for job shop schedulingent://SD_ILS/0/SD_ILS:3705342024-05-06T14:20:42Z2024-05-06T14:20:42Zby Tan, Hui Woon<br/>Author Tan, Hui Woon<br/>Format: Books<br/>Call Number TS157.5 T364 2004<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Project Paper (Bachelor of Science (Industrial Mathematics)) - Universiti Teknologi Malaysia, 2004<br/>Implementation of constraint based in scheduling nurse shift at crystal ward, Hospital University Malaysia (HUSM)ent://SD_ILS/0/SD_ILS:3712262024-05-06T14:20:42Z2024-05-06T14:20:42Zby Hazlina Kamarul Zaman<br/>Author Hazlina Kamarul Zaman<br/>Format: Books<br/>Call Number HD69.T54 H394 2004<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Thesis (Sarjana Sains (Sains Komputer - Kejuruteraan Perisian Masa Nyata)) - Universiti Teknologi Malaysia, 2004<br/>Implementation of constraint based in scheduling nurse shift at crystal ward, Hospital University Malaysia (HUSM)ent://SD_ILS/0/SD_ILS:6010202024-05-06T14:20:42Z2024-05-06T14:20:42Zby Hazlina Kamarul Zaman<br/>Author Hazlina Kamarul Zaman<br/>Format: Computer file<br/>Call Number CP 10215<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Thesis (Sarjana Sains (Sarjana Sains - Kejuruteraan Perisian Masa Nyata)) - Universiti Teknologi Malaysia, 2004<br/>Information management to integrate cost and schedule for infrastructure projectsent://SD_ILS/0/SD_ILS:6039382024-05-06T14:20:42Z2024-05-06T14:20:42Zby Chung, Keat Wei<br/>Author Chung, Keat Wei<br/>Format: Computer file<br/>Call Number CP 10449<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2004<br/>Information management to integrate cost and schedule for infrastructure projectsent://SD_ILS/0/SD_ILS:3958742024-05-06T14:20:42Z2024-05-06T14:20:42Zby Chung, Keat Wei<br/>Author Chung, Keat Wei<br/>Format: Books<br/>Call Number TH438 C484 2004<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2004<br/>Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2004<br/>Hierarchical scheduling in parallel and cluster systemsent://SD_ILS/0/SD_ILS:3640652024-05-06T14:20:42Z2024-05-06T14:20:42Zby Dandamudi, Sivarama P., 1955-<br/>Author Dandamudi, Sivarama P., 1955-<br/>Format: Books<br/>Call Number QA76.58 D36 2003<br/>Publisher Kluwer Academic/Plenum Publishers,<br/>Publication Date 2003<br/>ISBN 9780306477614<br/>Agent-based architecture for the dynamic timetabling problement://SD_ILS/0/SD_ILS:3884642024-05-06T14:20:42Z2024-05-06T14:20:42Zby Hany Taher Alashwal<br/>Author Hany Taher Alashwal, Safa'ai Deris, 1955-, Advanced Technology Congress (2003 : Universiti Putra Malaysia, Serdang, Selangor)<br/>Format: Books<br/>Call Number QA76.76.I58 H36 2003<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2003<br/>Real-time systems : scheduling, analysis, and verificationent://SD_ILS/0/SD_ILS:3279482024-05-06T14:20:42Z2024-05-06T14:20:42Zby Cheng, Albert M. K.<br/>Author Cheng, Albert M. K.<br/>Format: Books<br/>Call Number QA76.54 C33 2002<br/>Publisher Wiley Interscience,<br/>Publication Date 2002<br/>ISBN 9780471184065<br/>Scheduling in real-time systemsent://SD_ILS/0/SD_ILS:3272702024-05-06T14:20:42Z2024-05-06T14:20:42Zby Cottet, Francis<br/>Author Cottet, Francis, Delacroix, Joelle, Mammeri, Zoubir<br/>Format: Books<br/>Call Number QA76.54 C68 2002<br/>Publisher John Wiley & Sons,<br/>Publication Date 2002<br/>ISBN 9780470847664<br/>Online coursework results system for institutions of higher learningent://SD_ILS/0/SD_ILS:73172024-05-06T14:20:42Z2024-05-06T14:20:42Zby Nasly Mohamed Ali<br/>Author Nasly Mohamed Ali<br/>Format: Visual Materials<br/>Call Number MFL 12832<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2001<br/>Thesis (Sarjana Sains (Teknologi Maklumat)) - Universiti Teknologi Malaysia, 2001<br/>Sistem penapisan mel elektronik (E-mail filtering system) ... [et al.]ent://SD_ILS/0/SD_ILS:138642024-05-06T14:20:42Z2024-05-06T14:20:42Zby Noraini Abdullah<br/>Author Noraini Abdullah, Norazalila Komar, Nuraliza Abdul Khalit, Raja Intan Mahtera Raja Kamaludin, Sharifah Khairun Nisa' Habib Elias<br/>Format: Visual Materials<br/>Call Number MFL 10626<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 2000<br/>Kertas Projek (Sarjana Muda Sains Komputer) - Universiti Teknologi Malaysia, 2000<br/>Developing optimal timetable scheduling using microsoft visual basicent://SD_ILS/0/SD_ILS:1233622024-05-06T14:20:42Z2024-05-06T14:20:42Zby Chong, Onn Fei<br/>Author Chong, Onn Fei<br/>Format: Books<br/>Call Number LB1038 C56 1999 raf<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1999<br/>Project Paper (Bachelor of Electrical Engineering) - Universiti Teknologi Malaysia, 1999<br/>Rangkaian berkelajuan tinggi di MSCent://SD_ILS/0/SD_ILS:78632024-05-06T14:20:42Z2024-05-06T14:20:42Zby Kamarul Zamri Mohd. Zam<br/>Author Kamarul Zamri Mohd. Zam, Osman Aripin, Mohammad Rizal Julaihi, Lee, Ak Jenang, Mohd. Bakaruddin Abu Bakar<br/>Format: Visual Materials<br/>Call Number MFL 9152 ra<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Kertas projek (Sarjana Muda Sains Komputer) - Universiti Teknolo gi Malaysia, 1998<br/>Automated laboratory management system ... [et al.]ent://SD_ILS/0/SD_ILS:130182024-05-06T14:20:42Z2024-05-06T14:20:42Zby Foo, Chiew Mee<br/>Author Foo, Chiew Mee, Mohd. Afandi Maamon, Saifullizan Muhammad, Sevia Mahdaliza Idrus Sutan Nameh, Yap, Keem Siah<br/>Format: Visual Materials<br/>Call Number MFL 9287<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1998<br/>Project Paper (Bachelor of Electrical Engineering) - Universiti Teknologi Malaysia, 1998<br/>Shop floor integration between a cell controller and machining centreent://SD_ILS/0/SD_ILS:6190382024-05-06T14:20:42Z2024-05-06T14:20:42Zby Lock, Yew Chong<br/>Author Lock, Yew Chong<br/>Format: Computer file<br/>Call Number DSK 1389 ra<br/>Publisher UTM,<br/>Publication Date 1998<br/>Visual basic application in scheduling controlent://SD_ILS/0/SD_ILS:4722362024-05-06T14:20:42Z2024-05-06T14:20:42Zby Yap, Keem Siah<br/>Author Yap, Keem Siah<br/>Format: Books<br/>Call Number TS157.5 Y53 1998 raf<br/>Publisher UTM,<br/>Publication Date 1998<br/>Project paper (Bachelor of Electrical Engineering) - Universiti Teknologi Malaysia, 1998<br/>Cybermeeting : how to link people and technology in your organizationent://SD_ILS/0/SD_ILS:941222024-05-06T14:20:42Z2024-05-06T14:20:42Zby Creighton, James L.<br/>Author Creighton, James L., Adams, James W. R.<br/>Format: Books<br/>Call Number HF5734.7 C37 1998<br/>Publisher AMACOM,<br/>Publication Date 1998<br/>ISBN 9780814403525<br/>Shop floor integration between a cell controller and machining centreent://SD_ILS/0/SD_ILS:4781702024-05-06T14:20:42Z2024-05-06T14:20:42Zby Lock, Yew Chong<br/>Author Lock, Yew Chong<br/>Format: Books<br/>Call Number TS157.5 L62 1998 raf<br/>Publisher UTM,<br/>Publication Date 1998<br/>Project Paper (Bachelor of Mechanical Engineering) - Universiti Teknologi Malaysia, 1998<br/>Optimal time table schedulingent://SD_ILS/0/SD_ILS:4538652024-05-06T14:20:42Z2024-05-06T14:20:42Zby Pavala Malar Kannan<br/>Author Pavala Malar Kannan<br/>Format: Books<br/>Call Number LB1038 P38 1997 raf<br/>Publisher UTM,<br/>Publication Date 1997<br/>Project paper (Bachelor of Electrical Engineering) - Universiti Teknologi Malaysia, 1997<br/>Fuzzy and annealing models for task scheduling in multiprocessors systemsent://SD_ILS/0/SD_ILS:4812272024-05-06T14:20:42Z2024-05-06T14:20:42Zby Shaharuddin Salleh<br/>Author Shaharuddin Salleh<br/>Format: Books<br/>Call Number QA76.58 S63 1997<br/>Publisher UTM,<br/>Publication Date 1997<br/>Thesis (Doctor of Philosophy) - Universiti Teknologi Malaysia, 1997<br/>Sistem panduan perubatan keluarga; Sistem pakar rawatan menurut al-quran dan as-sunnah; Sistem penjadualan tugas doktor di Jabatan Pediatrik, Hospital Sultanah Aminah, Johor Bahru; A rule based computer assisted pre-diagnosis system for eye diseasesent://SD_ILS/0/SD_ILS:212492024-05-06T14:20:42Z2024-05-06T14:20:42Zby Hamidon Mahfoz<br/>Author Hamidon Mahfoz, Mohd. Yazid Idris, Norfiza Mahput, Surendra Kumar Balakrishnan<br/>Format: Visual Materials<br/>Call Number MFL 8690 ra<br/>Publisher Universiti Teknologi Malaysia,<br/>Publication Date 1996<br/>Kertas projek (Sarjana Muda Sains Komputer) - Universiti Teknologi Malaysia, 1996<br/>An optimum design of low-noise microwave transistor amplifiers for mobile communication receivers in 0.8 GHZ and 1.7 GHZ bands; Computer-aided design and testing of microwave oscillators; Penyelesaian masalah unit commitment dengan kaedah aturan-asas dan penjadualan optimum penjanaan hidro-terma; Design methology and model-based control of prototype scara robot arm; Intelligent minimum-time trajectory path tracking control for industrial robotsent://SD_ILS/0/SD_ILS:173592024-05-06T14:20:42Z2024-05-06T14:20:42Zby Asiah Ramli<br/>Author Asiah Ramli, Menshawi K. Menshawi, Mohamad Shafiri Ismail, Mohamed M. Ben Omran, Otman Musa Said Ahtiwash<br/>Format: Visual Materials<br/>Call Number MFL 8446 ra<br/>Publisher UTM,<br/>Publication Date 1995<br/>Thesis (Master in Electrical Engineering) - Universiti Teknologi Malaysia, 1995<br/>Simulasi penjadualan pengangkutan simen; Scheduling of police force deployment in Petaling Jaya; Analisis statistik pencemaran industri terhadap alam sekitar; Pembangunan pakej CAD/CAM Bahasa Melayu; Kajian kes perbandingan kaedah peramalan dalam perancangan agregat industri bekalan elektrikent://SD_ILS/0/SD_ILS:211112024-05-06T14:20:42Z2024-05-06T14:20:42Zby Juma'ah Haron<br/>Author Juma'ah Haron, Murni Mohammad Ali, Siti Rohaidah Ahmad, Wahidah Abu Bakar, Zainab Zaini<br/>Format: Visual Materials<br/>Call Number MFL 8633 ra<br/>Publisher UTM,<br/>Publication Date 1995<br/>Kertas projek (Sarjana Muda Sains Komputer) - Universiti Teknologi Malaysia, 1995<br/>Scheduling and load balancing in parallel and distributed systemsent://SD_ILS/0/SD_ILS:3845272024-05-06T14:20:42Z2024-05-06T14:20:42Zby Shirazi, Behrooz A.<br/>Author Shirazi, Behrooz A., Hurson, Ali R., Kavi, Krishna M.<br/>Format: Books<br/>Call Number QA76.58 S45 1995 f<br/>Publisher IEEE Computer Society Press,<br/>Publication Date 1995<br/>ISBN 9780818665875<br/>Using Novell GroupWise 4ent://SD_ILS/0/SD_ILS:3831932024-05-06T14:20:42Z2024-05-06T14:20:42Zby Bruck, Bill<br/>Author Bruck, Bill<br/>Format: Books<br/>Call Number HF5548.4.N68 B78 1994<br/>Publisher Que,<br/>Publication Date 1994<br/>ISBN 9780789700865<br/>Task scheduling in parallel and distributed systemsent://SD_ILS/0/SD_ILS:3548572024-05-06T14:20:42Z2024-05-06T14:20:42Zby El-Rewini, Hesham<br/>Author El-Rewini, Hesham, Lewis, Theodore Gyle, Ali, Hesham H<br/>Format: Books<br/>Call Number QA76.58 E73 1994<br/>Publisher Prentice Hall,<br/>Publication Date 1994<br/>ISBN 9780130992352<br/>Kajian perbandingan kebisingan pembakaran enjin disel menggunakan bahanapi gantian dan bahanapi disel konvensional; The effect of cyclic variation in combustion pressure and heat release in D I diesel engine; Merekebentuk dan fabrikasi acuan ansur; Pengujian prestasi pendesak pam empar yang di perbuat daripada aduanan getah asli; Kajian meramal daya seret ke atas peluru berpandu; An application of CAD/CAM in air pollution control system; Application of network analysis, resource scheduling and cost analysis in the selection of the optimum work schedule for the production of trommels in a factory; Merekebentuk membuat dan menguji alat pegering hasil pertanian - kaedah longwave infrared heater; Merekabentuk dan membina sebuah pencengkam robot 3 - jarient://SD_ILS/0/SD_ILS:145152024-05-06T14:20:42Z2024-05-06T14:20:42Zby Hairozaman Zaini<br/>Author Hairozaman Zaini, Hapida Ghazali, Haslan Mohd. Yusop, Haszaini Harun, Hisham Hj Kodiran<br/>Format: Visual Materials<br/>Call Number MFL 7857 ra<br/>Publisher UTM,<br/>Publication Date 1993<br/>Kertas Projek (Sarjana Muda Kejuruteraan Jentera) - Universiti Teknologi Malaysia, 1993<br/>Computer-aided transit schedulingent://SD_ILS/0/SD_ILS:1185372024-05-06T14:20:42Z2024-05-06T14:20:42Zby International Workshop on Computer-aided Scheduling of Tranasport (5th : 1990 : Montreal, Canada)<br/>Author International Workshop on Computer-aided Scheduling of Tranasport (5th : 1990 : Montreal, Canada), Desrochers, M. (Martin), 1957-1991, Rousseau, J.-M. (Jean-Marc)<br/>Format: Books<br/>Call Number HE4301.I36 1990<br/>Publisher Springer-Verlag,<br/>Publication Date 1992<br/>ISBN 9783540556343<br/>Pakej penyelesaian masalah dalam penyelidikan operasi; Sistem maklumat dokumen customs co-operation council; Sistem C J No 5 : pengecualian cukai jualan ke atas bahan mentah dan komponen termasuk bahan pembungkus untuk pengilangan; Application of linear programming (LP) : technique to real life problem; Penterjemahan bahasa pengaturcaraan pascal kepada himpunanent://SD_ILS/0/SD_ILS:148502024-05-06T14:20:42Z2024-05-06T14:20:42Zby Asnawi Sudin<br/>Author Asnawi Sudin, Badaruddin Mohamed Rafik, Mohnadi Naim, Siti Yusrina Md. Yusoff, Wan Aznan Din @ Wan Ali<br/>Format: Visual Materials<br/>Call Number MFL 8208 ra<br/>Publisher UTM,<br/>Publication Date 1992<br/>Kertas Projek (Sarjana Muda Sains Komputer) - Universiti Teknologi Malaysia, 1992<br/>Perisian untuk sistem permarkahan pelajar sekolah rendah; Pakej analisis rangkaian; Pembelajaran Bahasa Arab sekolah rendah; Perisian untuk sistem pelajar sekolah rendah; Pakej penjana nombor rawak pada PC; Sistem eksekutif pembuat putusan; Sistem buletin berkomputer; Cryptography workbench; Sistem maklumat kemasukan pelajar; Sistem inventori Fakulti Sains Komputer dan Sistem Maklumatent://SD_ILS/0/SD_ILS:1620622024-05-06T14:20:42Z2024-05-06T14:20:42Zby Liliza Mohamad<br/>Author Liliza Mohamad, Mat Jusoh Dollah, Masri Madon, Maziah Mahmod, Mohd. Sabri Mohd. Nor<br/>Format: Books<br/>Call Number MFL 7762 ra<br/>Publication Date 1991<br/>Kertas projek (Sarjana Muda Sains Komputer) - Universiti Teknologi Malaysia, 1991<br/>Optimum operation of irrigation canal systemsent://SD_ILS/0/SD_ILS:3740602024-05-06T14:20:42Z2024-05-06T14:20:42Zby Lin, Zihui<br/>Author Lin, Zihui<br/>Format: Books<br/>Call Number S619.E34 L46 1991 r<br/>Publisher UMI,<br/>Publication Date 1991<br/>Thesis (MSc) - University of Calgary, 1991<br/>Manufacturing systems analysis with application to production schedulingent://SD_ILS/0/SD_ILS:2134542024-05-06T14:20:42Z2024-05-06T14:20:42Zby Baudin, Michael<br/>Author Baudin, Michael<br/>Format: Books<br/>Call Number TS157.5.B38 1990<br/>Publisher Prentice-Hall,<br/>Publication Date 1990<br/>ISBN 9780135563823<br/>A model for irrigation delivery system managementent://SD_ILS/0/SD_ILS:3740472024-05-06T14:20:42Z2024-05-06T14:20:42Zby Boman, Brian James<br/>Author Boman, Brian James<br/>Format: Books<br/>Call Number S619.S33 B65 1985 r<br/>Publisher UMI,<br/>Publication Date 1985<br/>Thesis (PhD) - Utah State University, 1985<br/>Computer schelduling of public transport 2ent://SD_ILS/0/SD_ILS:3372442024-05-06T14:20:42Z2024-05-06T14:20:42Zby Rousseau, J.-M. (Jean-Marc)<br/>Author Rousseau, J.-M. (Jean-Marc), Universite de Montreal. Centre de recherche sur les transports<br/>Format: Books<br/>Call Number HE4301.C65 1985<br/>Publisher Elsevier Science,<br/>Publication Date 1985<br/>ISBN 9780444877789<br/>Minimizing the sum of absolute lateness in single machine and multimachine schedulingent://SD_ILS/0/SD_ILS:4130302024-05-06T14:20:42Z2024-05-06T14:20:42Zby Sundararaghavan, P. S.<br/>Author Sundararaghavan, P. S., Mesbah U Ahmed<br/>Format: Books<br/>Call Number MAK 16093<br/>Publication Date 1984<br/>Computer scheduling of public transport: urban passenger vehicle and crew schedulingent://SD_ILS/0/SD_ILS:1498662024-05-06T14:20:42Z2024-05-06T14:20:42Zby Wren, Anthony<br/>Author Wren, Anthony<br/>Format: Books<br/>Call Number HE336.A8 C65 1981<br/>Publisher North-Holland Pub.,<br/>Publication Date 1981<br/>ISBN 9780444861702<br/>[Proceedings] of the Conference on Computing in Civil Engineeringent://SD_ILS/0/SD_ILS:2985452024-05-06T14:20:42Z2024-05-06T14:20:42Zby Conference on Computing in Civil Engineering (2nd : 1980 : Baltimore, Maryland)<br/>Author Conference on Computing in Civil Engineering (2nd : 1980 : Baltimore, Maryland), Schelling, David R., American Society of Civil Engineers<br/>Format: Books<br/>Call Number TA153 C69 1980<br/>Publisher American Society of Civil Engineering,<br/>Publication Date 1980<br/>ISBN 9780872622463<br/>Efficient road transport schedulingent://SD_ILS/0/SD_ILS:2345042024-05-06T14:20:42Z2024-05-06T14:20:42Zby Sussams, J. E. (John Edward)<br/>Author Sussams, J. E. (John Edward)<br/>Format: Books<br/>Call Number HE336.A8 S87 1971<br/>Publisher Gower,<br/>Publication Date 1977 1971<br/>ISBN 9780716100898<br/>Computer and job-shop scheduling theoryent://SD_ILS/0/SD_ILS:1157942024-05-06T14:20:42Z2024-05-06T14:20:42Zby Coffman, E. G. (Edward Grady), 1934-<br/>Author Coffman, E. G. (Edward Grady), 1934-<br/>Format: Books<br/>Call Number TS157.5.C65 1976<br/>Publisher Wiley-Interscience,<br/>Publication Date 1976<br/>ISBN 9780471163190<br/>Instructional programming : issues and innovations in school schedulingent://SD_ILS/0/SD_ILS:2008132024-05-06T14:20:42Z2024-05-06T14:20:42Zby Saville, Anthony<br/>Author Saville, Anthony<br/>Format: Books<br/>Call Number LB1038 S3 1973<br/>Publisher Charles E Merrill,<br/>Publication Date 1973<br/>ISBN 9780675090643<br/>A simulation and dynamic programming approach to irrigation decision making in a variable environmentent://SD_ILS/0/SD_ILS:4076802024-05-06T14:20:42Z2024-05-06T14:20:42Zby Dudley, Norman J.<br/>Author Dudley, Norman J.<br/>Format: Books<br/>Call Number S619.E34 D82 1969 rf<br/>Publisher University of New England,<br/>Publication Date 1969<br/>Thesis (PhD) - University of New England, 1969<br/>Improving irrigation system performance for rice cultureent://SD_ILS/0/SD_ILS:3740552024-05-06T14:20:42Z2024-05-06T14:20:42Zby Cheong, Byeong-Ho<br/>Author Cheong, Byeong-Ho<br/>Format: Books<br/>Call Number TC812 C43 1992 r<br/>Publisher UMI<br/>Thesis (PhD) - Utah State University, 1992<br/>A comparison of schedulability analysis toolsent://SD_ILS/0/SD_ILS:7878782024-05-06T14:20:42Z2024-05-06T14:20:42Zby Ferhan Kilicer, author<br/>Author Ferhan Kilicer, author, Dayang Norhayati Abang Jawawi, Fakulti Sains Komputer dan Sistem Maklumat<br/>Format: Books<br/>Call Number QA76.54 F47 2012 raf<br/>Project Paper (Sarjana Muda (Kejuruteraan Perisian)) – Universiti Teknologi Malaysia, 2012<br/>A comparison of schedulability analysis toolsent://SD_ILS/0/SD_ILS:7879422024-05-06T14:20:42Z2024-05-06T14:20:42Zby Ferhan Kilicer, author<br/>Author Ferhan Kilicer, author, Dayang Norhayati Abang Jawawi, Fakulti Sains Komputer dan Sistem Maklumat<br/>Format: Electronic Resources<br/>Call Number CP 058211 ra<br/>Project Paper (Sarjana Muda (Kejuruteraan Perisian)) – Universiti Teknologi Malaysia, 2012<br/>COURSE SCHEDULING SYSTEM (CSS)ent://SD_ILS/0/SD_ILS:8426442024-05-06T14:20:42Z2024-05-06T14:20:42Zby Lamis Amin Abd. Elrahim Mohamed Oshi, 1987-, author<br/>Author Lamis Amin Abd. Elrahim Mohamed Oshi, 1987-, author, Noor Azurati Ahmad, Dr., supervisor, Sekolah Informatiks Termaju<br/>Format: Books<br/>Call Number CP 034533 ra<br/>Thesis Sarjana Sains (Kejuruteraan Perisian)<br/>A survey of constrained based scheduling systems using an artificial intelligence approachent://SD_ILS/0/SD_ILS:4241972024-05-06T14:20:42Z2024-05-06T14:20:42Zby Atabakhsh, H.<br/>Author Atabakhsh, H.<br/>Format: Books<br/>Call Number MAK 9036<br/>A simulation study of performance of MRP based systems under interaction effectsent://SD_ILS/0/SD_ILS:4043972024-05-06T14:20:42Z2024-05-06T14:20:42Zby Agarwal, G.<br/>Author Agarwal, G., Babu, A. Subash<br/>Format: Books<br/>Call Number MAK 7964<br/>On modelling dynamic scheduling in object-oriented simulation of flexible manufacturing systemsent://SD_ILS/0/SD_ILS:4049792024-05-06T14:20:42Z2024-05-06T14:20:42Zby Mebarki, N.<br/>Author Mebarki, N., Pierreval, H., Dussauchoy, A.<br/>Format: Books<br/>Call Number MAK 7970<br/>Dynamic scheduling of flexible assembly systemsent://SD_ILS/0/SD_ILS:4050372024-05-06T14:20:42Z2024-05-06T14:20:42Zby Nussbaumer, Anton<br/>Author Nussbaumer, Anton, List, Georg<br/>Format: Books<br/>Call Number MAK 7973<br/>A temporal reasoning expert system for job shop schedulingent://SD_ILS/0/SD_ILS:4562662024-05-06T14:20:42Z2024-05-06T14:20:42Zby Mohamed Khalil Mohd. Hani<br/>Author Mohamed Khalil Mohd. Hani, Shanker, L.<br/>Format: Books<br/>Call Number MAK 11772 a<br/>Just-in-time needs shop floor controlent://SD_ILS/0/SD_ILS:3373622024-05-06T14:20:42Z2024-05-06T14:20:42Zby Goddard, Walter<br/>Author Goddard, Walter<br/>Format: Books<br/>Call Number MAK 6185<br/>Techniques for producing school timetables on a computer and their application to other scheduling problemsent://SD_ILS/0/SD_ILS:2654672024-05-06T14:20:42Z2024-05-06T14:20:42Zby Appleby, J. S.<br/>Author Appleby, J. S., Newman, E. A., Blake, D. V.<br/>Format: Books<br/>Call Number MAK 938<br/>COURSE SCHEDULING SYSTEM (CSS)ent://SD_ILS/0/SD_ILS:8426432024-05-06T14:20:42Z2024-05-06T14:20:42Zby Lamis Amin Abd. Elrahim Mohamed Oshi, 1987-, author<br/>Author Lamis Amin Abd. Elrahim Mohamed Oshi, 1987-, author, Noor Azurati Ahmad, Dr., supervisor, Sekolah Informatiks Termaju<br/>Format: Books<br/>Call Number TS157.5 L36 2013 raf<br/>Thesis Sarjana Sains (Kejuruteraan Perisian)<br/>